Grid load growth by state

How much new electric load utilities and grid operators say is coming, state by state. Each figure is the publisher's own number for its own territory, printed as stated, with the date it was stated and the year it looks out to. Our article on grid load growth tells the national story behind these rows.

Utilities, grid operators, and public agencies publish how much new electric load they expect, mostly driven by data centers, and this page gathers every such figure in our record: 110 figures from 44 publishers, covering 27 states and 22 figures for multi-state territories and systems, out of the 50 states and the District of Columbia where we track data center projects. Each figure is printed as its publisher states it, with the date it was stated and the year it looks out to. The figures are never added together: each covers its own territory and its own years, and the territories overlap, so a single total would count the same expected load more than once.

Alabama

Load figures whose territory sits in Alabama. The state name links to the state page, with the projects tracked there.

  • Alabama Power

    Alabama Power service territory, Alabama

    Figure: 4,000 MW, signed agreements

    Stated: August 6, 2026

    Looks out to: Not stated

    “Alabama Power has contracted for 3 gigawatts in just the second quarter of 2026, bringing Alabama's total contracted load for large-load customers (as defined by Southern Company) to 4 gigawatts”

Arizona

Load figures whose territory sits in Arizona. The state name links to the state page, with the projects tracked there.

  • Arizona Public Service Company

    APS service territory, Arizona

    Figure: 14,820 MW, forecast peak load

    Stated: November 1, 2023

    Looks out to: 2038

    “By 2038, APS customers will need more than 14,820 MW of electricity.”

  • Salt River Project

    SRP service territory, Phoenix metro, Arizona

    Figure: 13,000 MW, forecast peak load

    Stated: May 12, 2023

    Looks out to: 2035

    “Peak Load Forecast (Current Trends scenario): peak demand grows at a 3.0% compound annual rate, reaching about 13,000 MW by 2035 (chart).”

  • Tucson Electric Power Company

    Tucson and Pima County, Arizona

    Figure: 286 MW, signed agreements

    Stated: August 25, 2025

    Looks out to: 2028

    “The ESA with TEP will provide 286 MW to the Project Blue Data Center by 2028, with a 'gradual increase in load over 18-months' starting in May 2026.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

California

Load figures whose territory sits in California. The state name links to the state page, with the projects tracked there.

  • California Energy Commission (CEC)

    California (statewide)

    Figure: 23,278 MW, load requests

    Stated: December 2025

    Looks out to: Not stated

    “Of the total 23,278 MW of requested capacity reported by utilities in December 2025”

  • California Energy Commission (CEC)

    California (statewide)

    Figure: 5,086 MW, signed agreements

    Stated: December 2025

    Looks out to: Not stated

    “5,086 MW have signed service agreements (Group 1)”

  • California Energy Commission (CEC)

    California (statewide)

    Figure: 8,400 MW, forecast peak load

    Stated: April 15, 2026

    Looks out to: 2040

    “Maximum demand increases to approximately 8,400 MW by 2040.”

  • California Energy Commission (CEC)

    California (statewide)

    Figure: 5,800 MW, forecast peak load

    Stated: April 15, 2026

    Looks out to: 2040

    “Maximum demand increases from approximately 1,000 MW in 2024 to approximately 5,800 MW by 2040.”

  • California Energy Commission (CEC)

    California (statewide)

    Figure: 4,500 MW, forecast peak load

    Stated: 2026

    Looks out to: 2040

    “That is projected to increase to 4,500 MW, or 9 percent of peak demand by 2040.”

  • California Energy Commission (CEC)

    California (statewide)

    Figure: 1,000 MW, connected load

    Stated: December 2025

    Looks out to: Not stated

    “As of December 2025, approximately 1,000 megawatts (MW) of existing data center peak demand operates in California.”

  • PG&E

    PG&E service territory, California

    Figure: 14,747 MW, load requests

    Stated: December 2025

    Looks out to: Not stated

    “Table 1: PG&E - Agreement 4,356; Application 3,617; Inquiry 6,774; Total 14,747 (MW)”

  • PG&E

    PG&E service territory, California

    Figure: 12,700 MW, load requests

    Stated: July 23, 2026

    Looks out to: Not stated

    “Pacific Gas and Electric now counts 12.7 GW in its data center pipeline, of which 490 MW of projects have executed interconnection agreements and another 3.9 GW are in final engineering”

  • PG&E

    PG&E service territory, California

    Figure: 4,356 MW, signed agreements

    Stated: December 2025

    Looks out to: Not stated

    “Table 1: PG&E - Agreement 4,356 (MW)”

  • PG&E

    PG&E service territory, California

    Figure: 490 MW, signed agreements

    Stated: July 23, 2026

    Looks out to: Not stated

    “490 MW of projects have executed interconnection agreements”

  • PG&E

    PG&E service territory, California

    Figure: 1,800 MW, forecast added load

    Stated: July 23, 2026

    Looks out to: 2030

    “PG&E Corporation CEO Patti Poppe said she expects to serve 1.8 GW of new data center load by 2030.”

  • PG&E

    PG&E service territory, California

    Figure: 174 MW, connected load

    Stated: October 22, 2026

    Looks out to: Not stated

    “PG&E reported on October 22 that it has energized 174 MW of new data center projects since 2024”

  • SDG&E

    San Diego Gas & Electric service territory, California

    Figure: 100 MW, load requests

    Stated: December 2025

    Looks out to: Not stated

    “Table 1: SDG&E - Agreement 0; Application 0; Inquiry 100; Total 100 (MW)”

  • Silicon Valley Power

    Silicon Valley Power service territory (City of Santa Clara)

    Figure: 1,038 MW, load requests

    Stated: December 2025

    Looks out to: Not stated

    “Table 1: SVP - Agreement 644; Application 196; Inquiry 198; Total 1,038 (MW)”

  • Silicon Valley Power

    Silicon Valley Power service territory (City of Santa Clara)

    Figure: 644 MW, signed agreements

    Stated: December 2025

    Looks out to: Not stated

    “Table 1: SVP - Agreement 644 (MW)”

  • Southern California Edison (SCE)

    Southern California Edison service territory, California

    Figure: 4,623 MW, load requests

    Stated: December 2025

    Looks out to: Not stated

    “Table 1: SCE - Agreement 72; Application 3,174; Inquiry 1,378; Total 4,623 (MW)”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Florida

Load figures whose territory sits in Florida. The state name links to the state page, with the projects tracked there.

  • Florida Power & Light

    Florida Power & Light service territory, Florida

    Figure: 2,852 MW, forecast added load

    Stated: September 9, 2026

    Looks out to: 2035

    “The additional load expected to be served under the LLCS tariffs is included in the Retail Summer and Winter peak MW values, shown in Column 4 on Schedules 3.1 and 3.2.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Georgia

Load figures whose territory sits in Georgia. The state name links to the state page, with the projects tracked there.

  • Georgia Power Company

    county

    Figure: 3,200 MW, signed agreements

    Stated: August 26, 2026

    Looks out to: 2032

    “On Aug. 26, 2026, staff reviewed a 3,200MW contract between Georgia Power and a data center company”

  • Georgia Power Company

    state

    Figure: 9,985 MW, signed agreements

    Stated: September 1, 2026

    Looks out to: Not stated

    “With the execution of the August 2026 contract, Georgia Power has secured customers for all 9,985 MW of energy generation, four months ahead of schedule.”

  • Georgia Power Company

    state

    Figure: 6,600 MW, forecast added load

    Stated: April 1, 2024

    Looks out to: 2030

    “By 2023, with the proliferation of data centers, that estimate grew to 6,600 MW.”

  • Georgia Power Company

    state

    Figure: 8,500 MW, forecast added load

    Stated: July 15, 2025

    Looks out to: 2031

    “Over the next six years, we project approximately 8,500 megawatts (MW) of electrical load growth”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Idaho

Load figures whose territory sits in Idaho. The state name links to the state page, with the projects tracked there.

  • Idaho Power

    Idaho Power service territory (Idaho and eastern Oregon)

    Figure: 1,000 MW, forecast added load

    Stated: June 27, 2025

    Looks out to: 2032

    “We’ll note, 1 GW is approximately the forecast for additional firm sales in the 2025 IRP.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Illinois

Load figures whose territory sits in Illinois. The state name links to the state page, with the projects tracked there.

  • ComEd

    ComEd service territory, northern Illinois

    Figure: 14,000 MW, load requests

    Stated: October 30, 2026

    Looks out to: Not stated

    “the future pipeline at about 23 GW in current or future cluster studies, split into about 14 GW at ComEd and about 9 GW in the Mid-Atlantic”

  • ComEd

    ComEd service territory, northern Illinois

    Figure: 6,500 MW, signed agreements

    Stated: January 6, 2026

    Looks out to: Not stated

    “These agreements include revenue commitments tied to the transmission services requested by eight large customers, who represent a forecasted new load greater than 6.5 GW.”

  • ComEd

    ComEd service territory, northern Illinois

    Figure: 9,000 MW, forecast added load

    Stated: October 30, 2026

    Looks out to: Not stated

    “Roughly 9 GW sits at Commonwealth Edison (ComEd) in northern Illinois and about 2 GW is in its Mid-Atlantic utilities.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Indiana

Load figures whose territory sits in Indiana. The state name links to the state page, with the projects tracked there.

  • NIPSCO

    Northern Indiana (NIPSCO service territory, Indiana)

    Figure: 2,400 MW, signed agreements

    Stated: December 31, 2025

    Looks out to: 2032

    “NIPSCO has an agreement to deliver 2400MW of power to a data center operator by 2032.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Kentucky

Load figures whose territory sits in Kentucky. The state name links to the state page, with the projects tracked there.

  • EKPC

    East Kentucky Power Cooperative service territory, Kentucky

    Figure: 10,000 MW, load requests

    Stated: June 2026

    Looks out to: Not stated

    “EKPC currently has 11 active data center projects seeking over 10 GW of power.”

  • LG&E and KU

    LG&E and KU service territory, Kentucky

    Figure: 3,500 MW, load requests

    Stated: March 2026

    Looks out to: Not stated

    “LG&E/KU reported to the PSC in March 2026 that it had 29 potential data center projects in its pipeline, with 11 of those projects, representing combined demand of approximately 3.5 gigawatts (GW), assigned a probability of 50 percent or greater of proceeding.”

  • LG&E and KU

    LG&E and KU service territory, Kentucky

    Figure: 12,000 MW, load requests

    Stated: May 2026

    Looks out to: Not stated

    “The CEO of LG&E/KU's parent company told investors in May 2026 that total prospective electricity demand from potential data centers in LG&E/KU's territory could reach approximately 12 GW.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Louisiana

Load figures whose territory sits in Louisiana. The state name links to the state page, with the projects tracked there.

  • Entergy Louisiana

    Entergy Louisiana service territory, Louisiana

    Figure: 3,000 MW, forecast added load

    Stated: August 6, 2026

    Looks out to: 2040

    “The Reference scenario shown in these attachments reflects an incremental (to the Low Scenario) 3,000MW assumed data center customer project at 90% probability”

  • Entergy Louisiana

    Entergy Louisiana service territory, Louisiana

    Figure: 18,177 MW, forecast peak load

    Stated: August 6, 2026

    Looks out to: 2040

    “Estimated peak load in Entergy's reference load growth scenario is forecasted to be 9,872 MW in 2026 and reach 18,177 MW in 2040.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Maryland

Load figures whose territory sits in Maryland. The state name links to the state page, with the projects tracked there.

  • PJM Interconnection

    Maryland, APS (Potomac Edison) zone

    Figure: 966 MW, forecast added load

    Stated: June 2026

    Looks out to: 2030

    “Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; AP 165 276 319 590 966 1,186 1,249 1,432 1,801 1,800”

  • PJM Interconnection

    Maryland, APS (Potomac Edison) zone

    Figure: 1,800 MW, forecast added load

    Stated: June 2026

    Looks out to: 2035

    “Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; AP 165 276 319 590 966 1,186 1,249 1,432 1,801 1,800”

  • PJM Interconnection

    Maryland, BGE zone

    Figure: 176 MW, forecast added load

    Stated: June 2026

    Looks out to: 2030

    “Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; BGE 18 25 43 110 176 243 307 355 355 355”

  • PJM Interconnection

    Maryland, BGE zone

    Figure: 355 MW, forecast added load

    Stated: June 2026

    Looks out to: 2035

    “Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; BGE 18 25 43 110 176 243 307 355 355 355”

  • PJM Interconnection

    Maryland, PEPCO zone

    Figure: 142 MW, forecast added load

    Stated: June 2026

    Looks out to: 2030

    “Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; PEPCO - - - - 142 229 437 642 799 946”

  • PJM Interconnection

    Maryland, PEPCO zone

    Figure: 946 MW, forecast added load

    Stated: June 2026

    Looks out to: 2035

    “Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; PEPCO - - - - 142 229 437 642 799 946”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

Massachusetts

Load figures whose territory sits in Massachusetts. The state name links to the state page, with the projects tracked there.

  • ISO New England

    ISO New England NEMA (Northeast Massachusetts) load zone

    Figure: 200 MW, load requests

    Stated: March 27, 2026

    Looks out to: 2027

    “NEMA — Data Center — 200 MW — thru 2027 (reported nameplate, prior to derating)”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

Minnesota

Load figures whose territory sits in Minnesota. The state name links to the state page, with the projects tracked there.

  • Great River Energy

    Minnesota (Great River Energy service territory)

    Figure: 1,000 MW, forecast added load

    Stated: January 10, 2025

    Looks out to: 2032

    “Great River Energy, a Maple Grove-based nonprofit, is planning 1,000 megawatts of new demand in a similar time frame”

The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.

Montana

Load figures whose territory sits in Montana. The state name links to the state page, with the projects tracked there.

  • NorthWestern Energy

    Montana (NorthWestern Energy service territory)

    Figure: 175 MW, load requests

    Stated: February 11, 2026

    Looks out to: 2027

    “The combined energy service requirement associated with these letters of intent is currently expected to be 175 megawatts beginning in late 2027, or earlier, with growth of up to 1,100 megawatts or more by 2030.”

  • NorthWestern Energy

    Montana (NorthWestern Energy service territory)

    Figure: 1,100 MW, load requests

    Stated: February 11, 2026

    Looks out to: 2030

    “The combined energy service requirement associated with these letters of intent is currently expected to be 175 megawatts beginning in late 2027, or earlier, with growth of up to 1,100 megawatts or more by 2030.”

Proceedings for these publishers

Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.

How to read these figures

The five kinds of figure are stages and measures, not one scale. Load requests are what customers have asked a utility to serve; signed agreements are load under contract; connected load is already drawing power. Forecast added load and forecast peak load are the publisher's own projections for a stated year, and a projection is not a result.

No figure here is added to another. A grid operator's forecast covers the same ground as the forecasts of the utilities inside its footprint, and two publishers describing the same territory in different years are not describing two loads. Each row stands on its own, with its publisher, its territory, and its date.

The record covers 27 states with a figure keyed to the state, plus 22 figures for multi-state territories and systems, out of the 50 states and the District of Columbia where we track projects. A state with no group here is a state whose utilities and grid operators have published no figure we have found.

Every figure is draft research: traced to the publisher's own testimony, filing, or release by an AI research agent and not yet through verification. Each receipt says so, and names the exact place in the document the figure comes from.

The commitment side of the same record

A request is not a commitment, and a forecast is not an outcome. Of the 110 figures on this page, 16 are signed agreements: load a customer has contracted for, in 9 states and the multi-state territories. The terms those customers sign under are set in commission proceedings: we track 191 proceedings about very large loads, and 108 have been decided or are in effect. The decided terms typically require the customer to sign a minimum contract of 10 to 20 years and pay for at least 70 to 90 percent of its contracted demand every month whether it uses it or not. Each state group above lists the proceedings joined to its publishers; the full list is on the dockets page.

Of the 191 proceedings we track, 108 have been decided or are in effect. The dockets page lists every one, with its status and its terms.

This page sits under What it means for locals. Its sibling page, residential electricity prices, keeps the same kind of record for what households actually paid. The megawatts to homes calculator turns a figure on this page into household terms, and courts and dockets lists the proceedings behind the terms. The projects behind the load are ranked on largest projects by announced capacity, and the record's other rankings sit on lists from the record.

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

    Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

    Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.

Questions people ask

What is the largest load figure in the record?
The largest single request figure in the record is 242,999 MW from ERCOT, stated April 15, 2026. The largest signed agreement figure is 17,861 MW from AEP Ohio, stated February 12, 2026. Each is one publisher's figure for its own territory, printed with its source on its row above.
Why is there no national total?
Because the figures overlap. A grid operator's forecast covers the same ground as the forecasts of the utilities inside its footprint, and two publishers looking at the same territory in different years are not two loads. Adding the figures on this page would count the same expected load several times over, so the page prints each figure on its own row, with its publisher, its territory, and its date, and adds none of them together.
What is the difference between requests, signed agreements, and connected load?
They are stages of the same path. A request is load a customer has asked a utility to serve; most requests never become projects. A signed agreement is load under contract, with the terms a commission proceeding set. Connected load is load already drawing power. A forecast is the publisher's own projection of where its peak or its added load lands in a stated year: a projection, not a result.
Does every state have a figure here?
No. The record holds a figure keyed to 27 states; we track projects in 50 states and the District of Columbia. A state with no group on this page is a state whose utilities and grid operators have published no figure we have found, or one covered only inside a multi-state territory figure, which sits in the last group on this page under the territory's own name.

Sources

  1. 1
    SELC Initial Comments on Large Load Contracts, Docket 33709
    Southern Environmental Law Center (filed in Ala. PSC Docket 33709)
    Tier 2 · Open the source
  2. 2
    New APS Plan Addresses Growing Customer Energy Needs (2023 Integrated Resource Plan)
    Arizona Public Service
    Tier 1 · Open the source
  3. 3
    SRP Integrated System Plan: ISP Early Key Findings (May 12, 2023)
    Salt River Project
    Tier 1 · Open the source
  4. 4
    Energy Collaboration Agreement Implementation Strategy (Project Blue / ACC Docket E-01933A-25-0187 summary)
    City of Tucson
    Tier 1 · Open the source
  5. 5
    Supporting Document for the 2025 IEPR Forecast: Data Center Forecasting Methodology
    California Energy Commission
    Tier 2 · Open the source
  6. 6
    Data Centers
    California Energy Commission
    Tier 2 · Open the source
  7. 7
    PG&E says it has 12.7 GW in data center pipeline as it courts smaller loads
    Utility Dive
    Tier 3 · Open the source
  8. 8
    Electrification Roundup: News You May Have Missed (October 28, 2026 Edition)
    ChargedUpPro (summarizing PG&E's Q3 2026 release)
    Tier 3 · Open the source
  9. 9
    Florida Power & Light Company responses to Staff's Third Data Request, Docket No. 20260000-OT
    Florida Public Service Commission (filing by Florida Power & Light Company)
    Tier 1 · Open the source
  10. 10
    Data Center Fact Sheet (September 2026)
    Georgia Public Service Commission
    Tier 1 · Open the source
  11. 11
    Integrated Resource Plan
    Georgia Power Company
    Tier 1 · Open the source
  12. 12
    Comments on Idaho Power 2025 Integrated Resource Plan, Case No. IPC-E-25-23
    Northwest Energy Coalition and Renewable Northwest (filed with the Idaho Public Utilities Commission)
    Tier 2 · Open the source
  13. 13
    Exelon Reports Third Quarter 2026 Results (Form 8-K, Exhibits 99.1 and 99.2)
    Exelon Corporation (SEC filing)
    Tier 1 · Open the source
  14. 14
    ComEd Announces New Agreements Signed to Ensure Large Load Customers Pay their Fair Share to Connect with and Use the Grid
    ComEd (Business Wire)
    Tier 4 · Open the source
  15. 15
    NIPSCO fact sheet (regulatory landscape, as of 12/31/2025)
    NiSource Inc.
    Tier 4 · Open the source
  16. 16
    Data Centers in Kentucky: Policy Analysis for the General Assembly, EPIC Report No. 2026-001
    Kentucky Energy Planning and Inventory Commission
    Tier 1 · Open the source
  17. 17
    Entergy Louisiana 2027 Integrated Resource Plan filings, LPSC Docket No. U-37764
    Entergy Louisiana / Louisiana Public Service Commission
    Tier 1 · Open the source
  18. 18
    2025 Maryland and District of Columbia State Infrastructure Report
    PJM Interconnection
    Tier 1 · Open the source
  19. 19
    Final Draft 2026 Large Load Forecast (Load Forecast Committee, March 27, 2026)
    ISO New England
    Tier 2 · Open the source
  20. 20
    Concern Over Power Demands of Crop of Minn. Data Centers
    Government Technology (Minnesota Star Tribune, Tribune Content Agency)
    Tier 3 · Open the source
  21. 21
    NorthWestern Energy Reports 2025 Financial Results (Form 8-K Exhibit 99.1)
    NorthWestern Energy Group, Inc.
    Tier 1 · Open the source

Back to What it means for locals

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Grid load growth by state." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/benefits/grid-load-growth