Grid load growth by state
How much new electric load utilities and grid operators say is coming, state by state. Each figure is the publisher's own number for its own territory, printed as stated, with the date it was stated and the year it looks out to. Our article on grid load growth tells the national story behind these rows.
Utilities, grid operators, and public agencies publish how much new electric load they expect, mostly driven by data centers, and this page gathers every such figure in our record: 110 figures from 44 publishers, covering 27 states and 22 figures for multi-state territories and systems, out of the 50 states and the District of Columbia where we track data center projects. Each figure is printed as its publisher states it, with the date it was stated and the year it looks out to. The figures are never added together: each covers its own territory and its own years, and the territories overlap, so a single total would count the same expected load more than once.
Alabama
Load figures whose territory sits in Alabama. The state name links to the state page, with the projects tracked there.
Alabama Power service territory, Alabama
Figure: 4,000 MW, signed agreements
Stated: August 6, 2026
Looks out to: Not stated
“Alabama Power has contracted for 3 gigawatts in just the second quarter of 2026, bringing Alabama's total contracted load for large-load customers (as defined by Southern Company) to 4 gigawatts”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Alabama PowerAlabama Power service territory, Alabama | 4,000 MWSigned agreements“Alabama Power has contracted for 3 gigawatts in just the second quarter of 2026, bringing Alabama's total contracted load for large-load customers (as defined by Southern Company) to 4 gigawatts” | August 6, 2026 | Not stated |
Arizona
Load figures whose territory sits in Arizona. The state name links to the state page, with the projects tracked there.
Arizona Public Service Company
APS service territory, Arizona
Figure: 14,820 MW, forecast peak load
Stated: November 1, 2023
Looks out to: 2038
“By 2038, APS customers will need more than 14,820 MW of electricity.”
Salt River Project
SRP service territory, Phoenix metro, Arizona
Figure: 13,000 MW, forecast peak load
Stated: May 12, 2023
Looks out to: 2035
“Peak Load Forecast (Current Trends scenario): peak demand grows at a 3.0% compound annual rate, reaching about 13,000 MW by 2035 (chart).”
Tucson Electric Power Company
Tucson and Pima County, Arizona
Figure: 286 MW, signed agreements
Stated: August 25, 2025
Looks out to: 2028
“The ESA with TEP will provide 286 MW to the Project Blue Data Center by 2028, with a 'gradual increase in load over 18-months' starting in May 2026.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Arizona Public Service CompanyAPS service territory, Arizona | 14,820 MWForecast peak load“By 2038, APS customers will need more than 14,820 MW of electricity.” | November 1, 2023 | 2038 |
| Salt River ProjectSRP service territory, Phoenix metro, Arizona | 13,000 MWForecast peak load“Peak Load Forecast (Current Trends scenario): peak demand grows at a 3.0% compound annual rate, reaching about 13,000 MW by 2035 (chart).” | May 12, 2023 | 2035 |
| Tucson Electric Power CompanyTucson and Pima County, Arizona | 286 MWSigned agreements“The ESA with TEP will provide 286 MW to the Project Blue Data Center by 2028, with a 'gradual increase in load over 18-months' starting in May 2026.” | August 25, 2025 | 2028 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Buy-Through ProgramProceeding · Board of Directors, Salt River Project Agricultural Improvement and Power District · In effect · Filed 2024
- E-67, Standard Price Plan for Large Load Substation Large General ServiceLarge-load tariff · Board of Directors, Salt River Project Agricultural Improvement and Power District · In effect
- Rate Schedule XHLF, General Service, Extra High Load FactorLarge-load tariff · Docket A.C.C. No. 6067 · Arizona Corporation Commission · In effect
- E-66, Standard Price Plan for Substation Large General Service with Instantaneously Interruptible LoadLarge-load tariff · Board of Directors, Salt River Project Agricultural Improvement and Power District · In effect
- E-65, Standard Price Plan for Substation Large General ServiceLarge-load tariff · Board of Directors, Salt River Project Agricultural Improvement and Power District · In effect
- Application of Tucson Electric Power Company for Approval of a Special Agreement for Electric Service with Humphrey's Peak Power, LLCProceeding · Docket E-01933A-25-0187 · Arizona Corporation Commission · Decided · Filed 2025
- Proposed Adjustments to SRP's Standard Electric Price Plans Effective with the November 2025 Billing CycleRate case · Board of Directors, Salt River Project Agricultural Improvement and Power District · Decided · Filed 2024
- Temporary Decrease to SRP's Fuel and Purchased Power Adjustment Mechanism (FPPAM) Prices, May Through October 2026 Billing CyclesProceeding · Board of Directors, Salt River Project Agricultural Improvement and Power District · Decided
- Application of Tucson Electric Power Company for the Establishment of Just and Reasonable Rates and Charges Designed to Realize a Reasonable Rate of Return on the Fair Value of the Properties of Tucson Electric Power CompanyRate case · Docket E-01933A-25-0103 · Arizona Corporation Commission · Pending before the commission · Filed 2025
- Application of Arizona Public Service Company for approval of new rates, charges, and schedulesRate case · Docket E-01345A-25-0105 · Arizona Corporation Commission · Pending before the commission · Filed 2025
- In the Matter of the Commission's Inquiry and Review of the Existing Rate Classifications and Other Potential Issues Relating to Data CentersProceeding · Docket E-00000A-25-0069 · Arizona Corporation Commission · Pending before the commission · Filed 2025
- APS and TSMC Arizona 25-Year Direct Pricing ContractProceeding · Arizona Corporation Commission · Proposed · Filed 2026
California
Load figures whose territory sits in California. The state name links to the state page, with the projects tracked there.
California Energy Commission (CEC)
California (statewide)
Figure: 23,278 MW, load requests
Stated: December 2025
Looks out to: Not stated
“Of the total 23,278 MW of requested capacity reported by utilities in December 2025”
California Energy Commission (CEC)
California (statewide)
Figure: 5,086 MW, signed agreements
Stated: December 2025
Looks out to: Not stated
“5,086 MW have signed service agreements (Group 1)”
California Energy Commission (CEC)
California (statewide)
Figure: 8,400 MW, forecast peak load
Stated: April 15, 2026
Looks out to: 2040
“Maximum demand increases to approximately 8,400 MW by 2040.”
California Energy Commission (CEC)
California (statewide)
Figure: 5,800 MW, forecast peak load
Stated: April 15, 2026
Looks out to: 2040
“Maximum demand increases from approximately 1,000 MW in 2024 to approximately 5,800 MW by 2040.”
California Energy Commission (CEC)
California (statewide)
Figure: 4,500 MW, forecast peak load
Stated: 2026
Looks out to: 2040
“That is projected to increase to 4,500 MW, or 9 percent of peak demand by 2040.”
California Energy Commission (CEC)
California (statewide)
Figure: 1,000 MW, connected load
Stated: December 2025
Looks out to: Not stated
“As of December 2025, approximately 1,000 megawatts (MW) of existing data center peak demand operates in California.”
PG&E service territory, California
Figure: 14,747 MW, load requests
Stated: December 2025
Looks out to: Not stated
“Table 1: PG&E - Agreement 4,356; Application 3,617; Inquiry 6,774; Total 14,747 (MW)”
PG&E service territory, California
Figure: 12,700 MW, load requests
Stated: July 23, 2026
Looks out to: Not stated
“Pacific Gas and Electric now counts 12.7 GW in its data center pipeline, of which 490 MW of projects have executed interconnection agreements and another 3.9 GW are in final engineering”
PG&E service territory, California
Figure: 4,356 MW, signed agreements
Stated: December 2025
Looks out to: Not stated
“Table 1: PG&E - Agreement 4,356 (MW)”
PG&E service territory, California
Figure: 490 MW, signed agreements
Stated: July 23, 2026
Looks out to: Not stated
“490 MW of projects have executed interconnection agreements”
PG&E service territory, California
Figure: 1,800 MW, forecast added load
Stated: July 23, 2026
Looks out to: 2030
“PG&E Corporation CEO Patti Poppe said she expects to serve 1.8 GW of new data center load by 2030.”
PG&E service territory, California
Figure: 174 MW, connected load
Stated: October 22, 2026
Looks out to: Not stated
“PG&E reported on October 22 that it has energized 174 MW of new data center projects since 2024”
San Diego Gas & Electric service territory, California
Figure: 100 MW, load requests
Stated: December 2025
Looks out to: Not stated
“Table 1: SDG&E - Agreement 0; Application 0; Inquiry 100; Total 100 (MW)”
Silicon Valley Power service territory (City of Santa Clara)
Figure: 1,038 MW, load requests
Stated: December 2025
Looks out to: Not stated
“Table 1: SVP - Agreement 644; Application 196; Inquiry 198; Total 1,038 (MW)”
Silicon Valley Power service territory (City of Santa Clara)
Figure: 644 MW, signed agreements
Stated: December 2025
Looks out to: Not stated
“Table 1: SVP - Agreement 644 (MW)”
Southern California Edison (SCE)
Southern California Edison service territory, California
Figure: 4,623 MW, load requests
Stated: December 2025
Looks out to: Not stated
“Table 1: SCE - Agreement 72; Application 3,174; Inquiry 1,378; Total 4,623 (MW)”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| California Energy Commission (CEC)California (statewide) | 23,278 MWLoad requests“Of the total 23,278 MW of requested capacity reported by utilities in December 2025” | December 2025 | Not stated |
| California Energy Commission (CEC)California (statewide) | 5,086 MWSigned agreements“5,086 MW have signed service agreements (Group 1)” | December 2025 | Not stated |
| California Energy Commission (CEC)California (statewide) | 8,400 MWForecast peak load“Maximum demand increases to approximately 8,400 MW by 2040.” | April 15, 2026 | 2040 |
| California Energy Commission (CEC)California (statewide) | 5,800 MWForecast peak load“Maximum demand increases from approximately 1,000 MW in 2024 to approximately 5,800 MW by 2040.” | April 15, 2026 | 2040 |
| California Energy Commission (CEC)California (statewide) | 4,500 MWForecast peak load“That is projected to increase to 4,500 MW, or 9 percent of peak demand by 2040.” | 2026 | 2040 |
| California Energy Commission (CEC)California (statewide) | 1,000 MWConnected load“As of December 2025, approximately 1,000 megawatts (MW) of existing data center peak demand operates in California.” | December 2025 | Not stated |
| PG&EPG&E service territory, California | 14,747 MWLoad requests“Table 1: PG&E - Agreement 4,356; Application 3,617; Inquiry 6,774; Total 14,747 (MW)” | December 2025 | Not stated |
| PG&EPG&E service territory, California | 12,700 MWLoad requests“Pacific Gas and Electric now counts 12.7 GW in its data center pipeline, of which 490 MW of projects have executed interconnection agreements and another 3.9 GW are in final engineering” | July 23, 2026 | Not stated |
| PG&EPG&E service territory, California | 4,356 MWSigned agreements“Table 1: PG&E - Agreement 4,356 (MW)” | December 2025 | Not stated |
| PG&EPG&E service territory, California | 490 MWSigned agreements“490 MW of projects have executed interconnection agreements” | July 23, 2026 | Not stated |
| PG&EPG&E service territory, California | 1,800 MWForecast added load“PG&E Corporation CEO Patti Poppe said she expects to serve 1.8 GW of new data center load by 2030.” | July 23, 2026 | 2030 |
| PG&EPG&E service territory, California | 174 MWConnected load“PG&E reported on October 22 that it has energized 174 MW of new data center projects since 2024” | October 22, 2026 | Not stated |
| SDG&ESan Diego Gas & Electric service territory, California | 100 MWLoad requests“Table 1: SDG&E - Agreement 0; Application 0; Inquiry 100; Total 100 (MW)” | December 2025 | Not stated |
| Silicon Valley PowerSilicon Valley Power service territory (City of Santa Clara) | 1,038 MWLoad requests“Table 1: SVP - Agreement 644; Application 196; Inquiry 198; Total 1,038 (MW)” | December 2025 | Not stated |
| Silicon Valley PowerSilicon Valley Power service territory (City of Santa Clara) | 644 MWSigned agreements“Table 1: SVP - Agreement 644 (MW)” | December 2025 | Not stated |
| Southern California Edison (SCE)Southern California Edison service territory, California | 4,623 MWLoad requests“Table 1: SCE - Agreement 72; Application 3,174; Inquiry 1,378; Total 4,623 (MW)” | December 2025 | Not stated |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Electric Rules 2, 15, 16 Exceptional Case Submittal, Electric Transmission Interconnection, Sunnyvale Technology Partners LLC c/o Menlo EquitiesProceeding · Docket Resolution E-5433 (Advice Letter 7667-E) · California Public Utilities Commission · Decided · Filed 2025
- Electric Rule 15 and 16 Exceptional Case Submittal for Engineering, Procurement, and Construction Agreement with STACK Infrastructure, Inc.Proceeding · Docket Resolution E-5447 (Advice Letter 7653-E) · California Public Utilities Commission · Decided · Filed 2025
- Exceptional Case Submittal for Electric Transmission Upgrades for Microsoft Corporation for its SJC02 Project in San Jose, CaliforniaProceeding · Docket Resolution E-5439 (Advice Letter 7635-E) · California Public Utilities Commission · Decided · Filed 2025
- Electric Rule 2, 15, and 16 Exceptional Case Submittal for Electric Transmission Service Facilities for STACK InfrastructureProceeding · Docket Resolution E-5420 (Advice Letter 7569-E) · California Public Utilities Commission · Decided · Filed 2025
- Application of Southern California Edison Company (U338E) to Establish Marginal Costs, Allocate Revenues, and Design Rates (2024 General Rate Case Phase 2)Rate case · Docket A.24-03-019 · California Public Utilities Commission · Decided · Filed 2024
- PG&E Advice Letter 7919-E: transmission upgrades for GIC San Jose LLC (Tier 3, resolution required)Proceeding · Docket Advice Letter 7919-E · California Public Utilities Commission · Pending before the commission · Filed 2026
- Application of Pacific Gas and Electric Company (U39E) for Approval of Electric Rule No. 30 for Transmission-Level Retail Electric ServiceLarge-load tariff · Docket A.24-11-007 · California Public Utilities Commission · Pending before the commission · Filed 2024
Florida
Load figures whose territory sits in Florida. The state name links to the state page, with the projects tracked there.
Florida Power & Light service territory, Florida
Figure: 2,852 MW, forecast added load
Stated: September 9, 2026
Looks out to: 2035
“The additional load expected to be served under the LLCS tariffs is included in the Retail Summer and Winter peak MW values, shown in Column 4 on Schedules 3.1 and 3.2.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Florida Power & LightFlorida Power & Light service territory, Florida | 2,852 MWForecast added load“The additional load expected to be served under the LLCS tariffs is included in the Retail Summer and Winter peak MW values, shown in Column 4 on Schedules 3.1 and 3.2.” | September 9, 2026 | 2035 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Petition for rate increase by Florida Power & Light Company (creating Large Load Cost Recovery Schedules LLCS-1 and LLCS-2)Rate case · Docket 20250011-EI · Florida Public Service Commission · Decided · Filed 2025
- Florida Power & Light Company’s Compliance Filing Pursuant to Section 366.043, Florida StatutesLarge-load tariff · Docket 20260149-EI · Florida Public Service Commission · Pending before the commission · Filed 2026
Georgia
Load figures whose territory sits in Georgia. The state name links to the state page, with the projects tracked there.
Georgia Power Company
county
Figure: 3,200 MW, signed agreements
Stated: August 26, 2026
Looks out to: 2032
“On Aug. 26, 2026, staff reviewed a 3,200MW contract between Georgia Power and a data center company”
Georgia Power Company
state
Figure: 9,985 MW, signed agreements
Stated: September 1, 2026
Looks out to: Not stated
“With the execution of the August 2026 contract, Georgia Power has secured customers for all 9,985 MW of energy generation, four months ahead of schedule.”
Georgia Power Company
state
Figure: 6,600 MW, forecast added load
Stated: April 1, 2024
Looks out to: 2030
“By 2023, with the proliferation of data centers, that estimate grew to 6,600 MW.”
Georgia Power Company
state
Figure: 8,500 MW, forecast added load
Stated: July 15, 2025
Looks out to: 2031
“Over the next six years, we project approximately 8,500 megawatts (MW) of electrical load growth”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Georgia Power Companycounty | 3,200 MWSigned agreements“On Aug. 26, 2026, staff reviewed a 3,200MW contract between Georgia Power and a data center company” | August 26, 2026 | 2032 |
| Georgia Power Companystate | 9,985 MWSigned agreements“With the execution of the August 2026 contract, Georgia Power has secured customers for all 9,985 MW of energy generation, four months ahead of schedule.” | September 1, 2026 | Not stated |
| Georgia Power Companystate | 6,600 MWForecast added load“By 2023, with the proliferation of data centers, that estimate grew to 6,600 MW.” | April 1, 2024 | 2030 |
| Georgia Power Companystate | 8,500 MWForecast added load“Over the next six years, we project approximately 8,500 megawatts (MW) of electrical load growth” | July 15, 2025 | 2031 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Time of Use, Revenue Neutral, Schedule TOU-RN-14Large-load tariff · Georgia Public Service Commission · In effect · Filed 2026
- Schedule PLL-18, Power and Light LargeLarge-load tariff · Georgia Public Service Commission · In effect
- Large Load Contract deemed filed for review under the Docket No. 44280 Large Load Contract Review Process (Joint Statement of Commission Staff and Georgia Power Company, July 27, 2026)Proceeding · Docket 44280 · Georgia Public Service Commission · Decided · Filed 2026
- Georgia Power Company’s Applications for the Certification of Capacity from the 2029-2031 All-Source RFP (Docket 56298) and of Supplemental Resources for 2028-2031 Capacity (Docket 56310)Proceeding · Docket 56298 and 56310 · Georgia Public Service Commission · Decided · Filed 2025
- Georgia Power Company’s 2025 Integrated Resource PlanProceeding · Docket 56002 · Georgia Public Service Commission · Decided · Filed 2025
- Order Approving Revisions to Georgia Power Company's Rules and Regulations (large load rules)Large-load tariff · Docket 44280 · Georgia Public Service Commission · Decided · Filed 2024
- RTP Revenue Credit and Allocation MethodologyProceeding · Docket 57171 · Georgia Public Service Commission · Pending before the commission
Idaho
Load figures whose territory sits in Idaho. The state name links to the state page, with the projects tracked there.
Idaho Power service territory (Idaho and eastern Oregon)
Figure: 1,000 MW, forecast added load
Stated: June 27, 2025
Looks out to: 2032
“We’ll note, 1 GW is approximately the forecast for additional firm sales in the 2025 IRP.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Idaho PowerIdaho Power service territory (Idaho and eastern Oregon) | 1,000 MWForecast added load“We’ll note, 1 GW is approximately the forecast for additional firm sales in the 2025 IRP.” | June 27, 2025 | 2032 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Application for Approval of Special Contract and Tariff Schedule 28 to Provide Electric Service to Micron Idaho Semiconductor Manufacturing (Triton) LLCProceeding · Docket IPC-E-24-44 · Idaho Public Utilities Commission · Decided · Filed 2024
- Application for Approval of Special Contract and Tariff Schedule 33 to Provide Electric Service to Brisbie, LLC's Data Center FacilityProceeding · Docket IPC-E-21-42 · Idaho Public Utilities Commission · Decided · Filed 2021
- Idaho Power Company's Petition to Evaluate Class Cost-of-Service Methodology, Consider Alternative Class Cost-of-Service Studies, and Determine Cost of Service Considerations for New Large-Load CustomersProceeding · Docket IPC-E-26-07 · Idaho Public Utilities Commission · Pending before the commission · Filed 2026
Illinois
Load figures whose territory sits in Illinois. The state name links to the state page, with the projects tracked there.
ComEd service territory, northern Illinois
Figure: 14,000 MW, load requests
Stated: October 30, 2026
Looks out to: Not stated
“the future pipeline at about 23 GW in current or future cluster studies, split into about 14 GW at ComEd and about 9 GW in the Mid-Atlantic”
ComEd service territory, northern Illinois
Figure: 6,500 MW, signed agreements
Stated: January 6, 2026
Looks out to: Not stated
“These agreements include revenue commitments tied to the transmission services requested by eight large customers, who represent a forecasted new load greater than 6.5 GW.”
ComEd service territory, northern Illinois
Figure: 9,000 MW, forecast added load
Stated: October 30, 2026
Looks out to: Not stated
“Roughly 9 GW sits at Commonwealth Edison (ComEd) in northern Illinois and about 2 GW is in its Mid-Atlantic utilities.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| ComEdComEd service territory, northern Illinois | 14,000 MWLoad requests“the future pipeline at about 23 GW in current or future cluster studies, split into about 14 GW at ComEd and about 9 GW in the Mid-Atlantic” | October 30, 2026 | Not stated |
| ComEdComEd service territory, northern Illinois | 6,500 MWSigned agreements“These agreements include revenue commitments tied to the transmission services requested by eight large customers, who represent a forecasted new load greater than 6.5 GW.” | January 6, 2026 | Not stated |
| ComEdComEd service territory, northern Illinois | 9,000 MWForecast added load“Roughly 9 GW sits at Commonwealth Edison (ComEd) in northern Illinois and about 2 GW is in its Mid-Atlantic utilities.” | October 30, 2026 | Not stated |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Commonwealth Edison Company, changes to new service requests for large demand project applicants or customers and revisions to Rider DELarge-load tariff · Docket 25-0677 / 25-0679 (consolidated) · Illinois Commerce Commission · Decided · Filed 2025
- Investigation of possible ratepayer protections and cost recovery mechanisms for servicing large demand project applicants or customers of Commonwealth Edison CompanyProceeding · Docket 26-0364 · Illinois Commerce Commission · Pending before the commission
Indiana
Load figures whose territory sits in Indiana. The state name links to the state page, with the projects tracked there.
Northern Indiana (NIPSCO service territory, Indiana)
Figure: 2,400 MW, signed agreements
Stated: December 31, 2025
Looks out to: 2032
“NIPSCO has an agreement to deliver 2400MW of power to a data center operator by 2032.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| NIPSCONorthern Indiana (NIPSCO service territory, Indiana) | 2,400 MWSigned agreements“NIPSCO has an agreement to deliver 2400MW of power to a data center operator by 2032.” | December 31, 2025 | 2032 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Verified Joint Petition of Northern Indiana Public Service Company LLC (NIPSCO) and NIPSCO Generation LLC (GenCo) for approval of a special contract (Data Center Customer #1 Special Contract), a power purchase agreement between NIPSCO and GenCo, and alternative regulatory plansProceeding · Docket Cause No. 46322 · Indiana Utility Regulatory Commission · Decided · Filed 2025
- Verified Petition of NIPSCO Generation LLC for Certain Determinations by the Commission with Respect to Its Jurisdiction Over Petitioner's Activities as a Non-Retail Generator of Electric PowerProceeding · Docket Cause No. 46183 · Indiana Utility Regulatory Commission · Decided
Kentucky
Load figures whose territory sits in Kentucky. The state name links to the state page, with the projects tracked there.
East Kentucky Power Cooperative service territory, Kentucky
Figure: 10,000 MW, load requests
Stated: June 2026
Looks out to: Not stated
“EKPC currently has 11 active data center projects seeking over 10 GW of power.”
LG&E and KU service territory, Kentucky
Figure: 3,500 MW, load requests
Stated: March 2026
Looks out to: Not stated
“LG&E/KU reported to the PSC in March 2026 that it had 29 potential data center projects in its pipeline, with 11 of those projects, representing combined demand of approximately 3.5 gigawatts (GW), assigned a probability of 50 percent or greater of proceeding.”
LG&E and KU service territory, Kentucky
Figure: 12,000 MW, load requests
Stated: May 2026
Looks out to: Not stated
“The CEO of LG&E/KU's parent company told investors in May 2026 that total prospective electricity demand from potential data centers in LG&E/KU's territory could reach approximately 12 GW.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| EKPCEast Kentucky Power Cooperative service territory, Kentucky | 10,000 MWLoad requests“EKPC currently has 11 active data center projects seeking over 10 GW of power.” | June 2026 | Not stated |
| LG&E and KULG&E and KU service territory, Kentucky | 3,500 MWLoad requests“LG&E/KU reported to the PSC in March 2026 that it had 29 potential data center projects in its pipeline, with 11 of those projects, representing combined demand of approximately 3.5 gigawatts (GW), assigned a probability of 50 percent or greater of proceeding.” | March 2026 | Not stated |
| LG&E and KULG&E and KU service territory, Kentucky | 12,000 MWLoad requests“The CEO of LG&E/KU's parent company told investors in May 2026 that total prospective electricity demand from potential data centers in LG&E/KU's territory could reach approximately 12 GW.” | May 2026 | Not stated |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Electronic Tariff Filing of East Kentucky Power Cooperative, Inc. to Establish a New Tariff for Data Center Power (Rate DCP)Large-load tariff · Docket 2025-00140 · Kentucky Public Service Commission · In effect · Filed 2025
Louisiana
Load figures whose territory sits in Louisiana. The state name links to the state page, with the projects tracked there.
Entergy Louisiana service territory, Louisiana
Figure: 3,000 MW, forecast added load
Stated: August 6, 2026
Looks out to: 2040
“The Reference scenario shown in these attachments reflects an incremental (to the Low Scenario) 3,000MW assumed data center customer project at 90% probability”
Entergy Louisiana service territory, Louisiana
Figure: 18,177 MW, forecast peak load
Stated: August 6, 2026
Looks out to: 2040
“Estimated peak load in Entergy's reference load growth scenario is forecasted to be 9,872 MW in 2026 and reach 18,177 MW in 2040.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Entergy LouisianaEntergy Louisiana service territory, Louisiana | 3,000 MWForecast added load“The Reference scenario shown in these attachments reflects an incremental (to the Low Scenario) 3,000MW assumed data center customer project at 90% probability” | August 6, 2026 | 2040 |
| Entergy LouisianaEntergy Louisiana service territory, Louisiana | 18,177 MWForecast peak load“Estimated peak load in Entergy's reference load growth scenario is forecasted to be 9,872 MW in 2026 and reach 18,177 MW in 2040.” | August 6, 2026 | 2040 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Application of Entergy Louisiana, LLC for Approval of Generation and Transmission Resources Proposed in Connection with Service to a Significant Customer Project in North Louisiana, Including Proposed Rider, and Request for Timely TreatmentProceeding · Docket U-37425 · Louisiana Public Service Commission · Decided · Filed 2024
- Application of Entergy Louisiana, LLC for certification of generation and transmission resources and for other relief (Lightning Initiative)Proceeding · Docket U-37882 · Louisiana Public Service Commission · Pending before the commission · Filed 2026
Maryland
Load figures whose territory sits in Maryland. The state name links to the state page, with the projects tracked there.
Maryland, APS (Potomac Edison) zone
Figure: 966 MW, forecast added load
Stated: June 2026
Looks out to: 2030
“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; AP 165 276 319 590 966 1,186 1,249 1,432 1,801 1,800”
Maryland, APS (Potomac Edison) zone
Figure: 1,800 MW, forecast added load
Stated: June 2026
Looks out to: 2035
“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; AP 165 276 319 590 966 1,186 1,249 1,432 1,801 1,800”
Maryland, BGE zone
Figure: 176 MW, forecast added load
Stated: June 2026
Looks out to: 2030
“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; BGE 18 25 43 110 176 243 307 355 355 355”
Maryland, BGE zone
Figure: 355 MW, forecast added load
Stated: June 2026
Looks out to: 2035
“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; BGE 18 25 43 110 176 243 307 355 355 355”
Maryland, PEPCO zone
Figure: 142 MW, forecast added load
Stated: June 2026
Looks out to: 2030
“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; PEPCO - - - - 142 229 437 642 799 946”
Maryland, PEPCO zone
Figure: 946 MW, forecast added load
Stated: June 2026
Looks out to: 2035
“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; PEPCO - - - - 142 229 437 642 799 946”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| PJM InterconnectionMaryland, APS (Potomac Edison) zone | 966 MWForecast added load“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; AP 165 276 319 590 966 1,186 1,249 1,432 1,801 1,800” | June 2026 | 2030 |
| PJM InterconnectionMaryland, APS (Potomac Edison) zone | 1,800 MWForecast added load“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; AP 165 276 319 590 966 1,186 1,249 1,432 1,801 1,800” | June 2026 | 2035 |
| PJM InterconnectionMaryland, BGE zone | 176 MWForecast added load“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; BGE 18 25 43 110 176 243 307 355 355 355” | June 2026 | 2030 |
| PJM InterconnectionMaryland, BGE zone | 355 MWForecast added load“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; BGE 18 25 43 110 176 243 307 355 355 355” | June 2026 | 2035 |
| PJM InterconnectionMaryland, PEPCO zone | 142 MWForecast added load“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; PEPCO - - - - 142 229 437 642 799 946” | June 2026 | 2030 |
| PJM InterconnectionMaryland, PEPCO zone | 946 MWForecast added load“Zone 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035; PEPCO - - - - 142 229 437 642 799 946” | June 2026 | 2035 |
The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.
Massachusetts
Load figures whose territory sits in Massachusetts. The state name links to the state page, with the projects tracked there.
ISO New England
ISO New England NEMA (Northeast Massachusetts) load zone
Figure: 200 MW, load requests
Stated: March 27, 2026
Looks out to: 2027
“NEMA — Data Center — 200 MW — thru 2027 (reported nameplate, prior to derating)”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| ISO New EnglandISO New England NEMA (Northeast Massachusetts) load zone | 200 MWLoad requests“NEMA — Data Center — 200 MW — thru 2027 (reported nameplate, prior to derating)” | March 27, 2026 | 2027 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,215Proceeding · Docket EL26-72-000 · Federal Energy Regulatory Commission · Pending before the commission · Filed 2026
Minnesota
Load figures whose territory sits in Minnesota. The state name links to the state page, with the projects tracked there.
Minnesota (Great River Energy service territory)
Figure: 1,000 MW, forecast added load
Stated: January 10, 2025
Looks out to: 2032
“Great River Energy, a Maple Grove-based nonprofit, is planning 1,000 megawatts of new demand in a similar time frame”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| Great River EnergyMinnesota (Great River Energy service territory) | 1,000 MWForecast added load“Great River Energy, a Maple Grove-based nonprofit, is planning 1,000 megawatts of new demand in a similar time frame” | January 10, 2025 | 2032 |
The record holds no signed agreement figure and no large-load commission proceeding for this state yet. We checked the signed agreements in the forecast record and the commission proceedings we track.
Montana
Load figures whose territory sits in Montana. The state name links to the state page, with the projects tracked there.
Montana (NorthWestern Energy service territory)
Figure: 175 MW, load requests
Stated: February 11, 2026
Looks out to: 2027
“The combined energy service requirement associated with these letters of intent is currently expected to be 175 megawatts beginning in late 2027, or earlier, with growth of up to 1,100 megawatts or more by 2030.”
Montana (NorthWestern Energy service territory)
Figure: 1,100 MW, load requests
Stated: February 11, 2026
Looks out to: 2030
“The combined energy service requirement associated with these letters of intent is currently expected to be 175 megawatts beginning in late 2027, or earlier, with growth of up to 1,100 megawatts or more by 2030.”
| Publisher | Figure, as stated | Stated | Looks out to |
|---|---|---|---|
| NorthWestern EnergyMontana (NorthWestern Energy service territory) | 175 MWLoad requests“The combined energy service requirement associated with these letters of intent is currently expected to be 175 megawatts beginning in late 2027, or earlier, with growth of up to 1,100 megawatts or more by 2030.” | February 11, 2026 | 2027 |
| NorthWestern EnergyMontana (NorthWestern Energy service territory) | 1,100 MWLoad requests“The combined energy service requirement associated with these letters of intent is currently expected to be 175 megawatts beginning in late 2027, or earlier, with growth of up to 1,100 megawatts or more by 2030.” | February 11, 2026 | 2030 |
Proceedings for these publishers
Commission proceedings for the publishers above, joined on the record's own keys. Each one sets or reviews the terms a very large customer signs under.
- NorthWestern Energy, Large New Load Service Tariff Rule, Rule No. 24Large-load tariff · Docket 2026.04.023 · Montana Public Service Commission · Pending before the commission · Filed 2026
How to read these figures
The five kinds of figure are stages and measures, not one scale. Load requests are what customers have asked a utility to serve; signed agreements are load under contract; connected load is already drawing power. Forecast added load and forecast peak load are the publisher's own projections for a stated year, and a projection is not a result.
No figure here is added to another. A grid operator's forecast covers the same ground as the forecasts of the utilities inside its footprint, and two publishers describing the same territory in different years are not describing two loads. Each row stands on its own, with its publisher, its territory, and its date.
The record covers 27 states with a figure keyed to the state, plus 22 figures for multi-state territories and systems, out of the 50 states and the District of Columbia where we track projects. A state with no group here is a state whose utilities and grid operators have published no figure we have found.
Every figure is draft research: traced to the publisher's own testimony, filing, or release by an AI research agent and not yet through verification. Each receipt says so, and names the exact place in the document the figure comes from.
The commitment side of the same record
A request is not a commitment, and a forecast is not an outcome. Of the 110 figures on this page, 16 are signed agreements: load a customer has contracted for, in 9 states and the multi-state territories. The terms those customers sign under are set in commission proceedings: we track 191 proceedings about very large loads, and 108 have been decided or are in effect. The decided terms typically require the customer to sign a minimum contract of 10 to 20 years and pay for at least 70 to 90 percent of its contracted demand every month whether it uses it or not. Each state group above lists the proceedings joined to its publishers; the full list is on the dockets page.
Of the 191 proceedings we track, 108 have been decided or are in effect. The dockets page lists every one, with its status and its terms.
This page sits under What it means for locals. Its sibling page, residential electricity prices, keeps the same kind of record for what households actually paid. The megawatts to homes calculator turns a figure on this page into household terms, and courts and dockets lists the proceedings behind the terms. The projects behind the load are ranked on largest projects by announced capacity, and the record's other rankings sit on lists from the record.
What the record shows · November 28, 2026
Loudoun County data centers: the complete record
Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.
Questions people ask
- What is the largest load figure in the record?
- The largest single request figure in the record is 242,999 MW from ERCOT, stated April 15, 2026. The largest signed agreement figure is 17,861 MW from AEP Ohio, stated February 12, 2026. Each is one publisher's figure for its own territory, printed with its source on its row above.
- Why is there no national total?
- Because the figures overlap. A grid operator's forecast covers the same ground as the forecasts of the utilities inside its footprint, and two publishers looking at the same territory in different years are not two loads. Adding the figures on this page would count the same expected load several times over, so the page prints each figure on its own row, with its publisher, its territory, and its date, and adds none of them together.
- What is the difference between requests, signed agreements, and connected load?
- They are stages of the same path. A request is load a customer has asked a utility to serve; most requests never become projects. A signed agreement is load under contract, with the terms a commission proceeding set. Connected load is load already drawing power. A forecast is the publisher's own projection of where its peak or its added load lands in a stated year: a projection, not a result.
- Does every state have a figure here?
- No. The record holds a figure keyed to 27 states; we track projects in 50 states and the District of Columbia. A state with no group on this page is a state whose utilities and grid operators have published no figure we have found, or one covered only inside a multi-state territory figure, which sits in the last group on this page under the territory's own name.
Sources
- 1SELC Initial Comments on Large Load Contracts, Docket 33709
Southern Environmental Law Center (filed in Ala. PSC Docket 33709)Tier 2 · Open the source - 2New APS Plan Addresses Growing Customer Energy Needs (2023 Integrated Resource Plan)
Arizona Public ServiceTier 1 · Open the source - 3SRP Integrated System Plan: ISP Early Key Findings (May 12, 2023)
Salt River ProjectTier 1 · Open the source - 4Energy Collaboration Agreement Implementation Strategy (Project Blue / ACC Docket E-01933A-25-0187 summary)
City of TucsonTier 1 · Open the source - 5Supporting Document for the 2025 IEPR Forecast: Data Center Forecasting Methodology
California Energy CommissionTier 2 · Open the source - 6
- 7PG&E says it has 12.7 GW in data center pipeline as it courts smaller loads
Utility DiveTier 3 · Open the source - 8Electrification Roundup: News You May Have Missed (October 28, 2026 Edition)
ChargedUpPro (summarizing PG&E's Q3 2026 release)Tier 3 · Open the source - 9Florida Power & Light Company responses to Staff's Third Data Request, Docket No. 20260000-OT
Florida Public Service Commission (filing by Florida Power & Light Company)Tier 1 · Open the source - 10
- 11
- 12Comments on Idaho Power 2025 Integrated Resource Plan, Case No. IPC-E-25-23
Northwest Energy Coalition and Renewable Northwest (filed with the Idaho Public Utilities Commission)Tier 2 · Open the source - 13Exelon Reports Third Quarter 2026 Results (Form 8-K, Exhibits 99.1 and 99.2)
Exelon Corporation (SEC filing)Tier 1 · Open the source - 14ComEd Announces New Agreements Signed to Ensure Large Load Customers Pay their Fair Share to Connect with and Use the Grid
ComEd (Business Wire)Tier 4 · Open the source - 15
- 16Data Centers in Kentucky: Policy Analysis for the General Assembly, EPIC Report No. 2026-001
Kentucky Energy Planning and Inventory CommissionTier 1 · Open the source - 17Entergy Louisiana 2027 Integrated Resource Plan filings, LPSC Docket No. U-37764
Entergy Louisiana / Louisiana Public Service CommissionTier 1 · Open the source - 182025 Maryland and District of Columbia State Infrastructure Report
PJM InterconnectionTier 1 · Open the source - 19Final Draft 2026 Large Load Forecast (Load Forecast Committee, March 27, 2026)
ISO New EnglandTier 2 · Open the source - 20Concern Over Power Demands of Crop of Minn. Data Centers
Government Technology (Minnesota Star Tribune, Tribune Content Agency)Tier 3 · Open the source - 21NorthWestern Energy Reports 2025 Financial Results (Form 8-K Exhibit 99.1)
NorthWestern Energy Group, Inc.Tier 1 · Open the source
Back to What it means for locals
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Grid load growth by state." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/benefits/grid-load-growth