How many homes use as much electricity as a data center?

Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.

Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona

Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.

The address holds your inputs, so a link shows the same calculation.

Start from

Your data centers

Pick as many as you like. The one marked main drives the big result.

  • Meta Fort Worth Data CenterTarrant County, Texas · capacity not in our records
  • Meta Huntsville Data CenterMadison County, Alabama · capacity not in our records
  • Meta Mesa Data CenterMaricopa County, Arizona · capacity not in our records

Meta Fort Worth Data Center: Operating. No published capacity in our records yet. Enter one from a filing.Oncor Electric Delivery Company LLC sells no power to homes in federal data, so homes use the state average.

Fine-tune every input
How hard it runs, percent of capacity (low, likely, high)
Overhead multiplier, used only for computer-equipment figures

In 2024, it used about as much electricity as

83,200 homes

The operator reported 1,109,004 MWh for 2024, compared with homes in Texas.

Precision: Good3 of 4

  • Capacity: Entered by you.
  • Local homes: State average. Utility data would be sharper.
  • What kind of facility: Facility type and what the MW figure measures narrow the range.
  • Measured use: Using the operator's reported use for 2024.

Estimated range. Not a forecast, and not a bill.

Your data centers, side by side

Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.

Selected data centers compared
Data centerCapacityHomes (likely)Yearly GWhCompared with
Meta Fort Worth Data CenterMainReported use, 202483,2001,109Texas
Meta Huntsville Data CenterReported use, 202462,800866Homes served by City of Huntsville - (AL)
Meta Mesa Data CenterReported use, 20241,80025Homes served by Salt River Project
Together147,9001,999Each site against its own local homes.

How it works

  1. Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier. 100 MW × 1 = 100 MW (likely)
  2. Yearly electricity: facility power times 8,760 hours times how hard it runs. 100 MW × 8,760 h × 75% = 657,000 MWh
  3. Homes: that total divided by what one home uses in a year. 657,000 MWh ÷ 13.323 MWh = 49,313 homes (shown rounded)

This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.

Sources

  1. 1
    Form EIA-861 final 2025 detailed data files
    U.S. Energy Information Administration
    Tier 1 · Open the source
  2. 2
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  3. 3
    Meta 2025 Environmental Data Index
    Meta Platforms, Inc.
    Tier 4 · Open the source
  4. 4
    Building Texas
    Meta Platforms, Inc.
    Tier 4 · Open the source
  5. 5
    Property Tax Abatement Agreements with Winner, LLC (Internal Audit, Audit Project# 2018.082 AC)
    City of Fort Worth, Internal Audit Department
    Tier 1 · Open the source
  6. 6
    City Secretary Contract No. 46727: Tax Abatement Agreement with Winner LLC
    City of Fort Worth, City Secretary
    Tier 1 · Open the source
  7. 7
    Ordinance No. 22473-10-2016 and M&C G-18858: Reinvestment Zone No. 90A
    City of Fort Worth, City Secretary
    Tier 1 · Open the source
  8. 8
    United States - Meta Data Centers (fleet list incl. Fort Worth)
    Meta
    Tier 4 · Open the source
  9. 9
    The Newest Addition to the Facebook Data Center Fleet: Fort Worth
    Meta Platforms, Inc.
    Tier 4 · Open the source
  10. 10
    Governor Abbott Breaks Ground On New Facebook Data Center
    Office of the Governor, State of Texas
    Tier 1 · Open the source
  11. 11
    Expanding Facebook's Fort Worth data center by approximately 170,000 square feet
    Meta Platforms, Inc.
    Tier 4 · Open the source
  12. 12
    Meta's Fort Worth Data Center (info sheet)
    Meta Platforms, Inc.
    Tier 4 · Open the source
  13. 13
    City Secretary Contract No. 46839: Memorandum of Understanding with Winner LLC
    City of Fort Worth, City Secretary
    Tier 1 · Open the source
  14. 14
    Economic Development Update: proposed Winner LLC abatement for the QTS Data Center site (City Council Work Session, March 19, 2019)
    City of Fort Worth, Economic Development Department
    Tier 1 · Open the source
  15. 15
    Commissioners Court Communication 133917: Tax Abatement Agreement between Tarrant County and Winner LLC
    Tarrant County
    Tier 1 · Open the source
  16. 16
    TCEQ Executive Director's Agenda, Title V permits issued, calendar year 2021
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  17. 17
    Title V Permit Renewal and Revision Application, Project 39681, Winner LLC (Permit 4280)
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  18. 18
    TCEQ Title V pending applications
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  19. 19
    TDLR TABS project record TABS2021001306 (FTW4 Data Center)
    Texas Department of Licensing and Regulation
    Tier 1 · Open the source
  20. 20
    Governor Ivey Announces Facebook to Invest $750 Million in New Data Center in Huntsville
    Office of the Governor of Alabama
    Tier 1 · Open the source
  21. 21
    Facebook opens Huntsville, Alabama data center
    Data Center Dynamics
    Tier 3 · Open the source
  22. 22
    Huntsville, We're Growing!
    Meta Data Centers
    Tier 4 · Open the source
  23. 23
    Mesa we are online!
    Meta Data Centers
    Tier 4 · Open the source
  24. 24
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Open the source
  25. 25
    Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
    Uptime Institute
    Tier 2 · Open the source

Questions people ask

How many homes use as much electricity as a data center?
About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
How many homes does 1 MW of data center power equal?
About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
Is a data center's MW figure what it actually uses?
No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
Why does the answer change by utility?
Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.

Embed this calculator

Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.

<iframe src="https://datacenterfactcheck.org/calculators/mw-to-homes/embed" title="MW to homes calculator" width="100%" height="640" loading="lazy"></iframe>