Skip to content

Data center court cases and dockets

A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.

See this week's Docket Drop

211 dockets, page 1 of 6

Cases and proceedings

  1. Utility commissionPending before the commissionLarge loads

    Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation (formal complaint on large load and data center costs)

    Pennsylvania Public Utility Commission · Docket C-2026-3065756 · PPL Electric Utilities Corp · Pennsylvania

  2. Utility commissionPending before the commissionLarge loads

    Petition of PPL Electric Utilities Corporation for Approval of Its Non-Bypassable Customer Protection Transmission Rider, Elimination of Its Transmission Service Charge, Changes to Its Generation Supply Charges, Changes to Its Retail Tariff, and Changes to Its Electric Generation Supplier Coordination Tariff

    Pennsylvania Public Utility Commission · Docket P-2026-3065185 · PPL Electric Utilities Corp · Pennsylvania

  3. Utility commissionPending before the commissionLarge loads

    Application of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Prologis

    Public Utilities Commission of Nevada · Docket 26-05030 · Nevada Power Co · Nevada

  4. Utility commissionPending before the commissionLarge loads

    Application of Nevada Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Proton Novva SPV, LLC (Novva)

    Public Utilities Commission of Nevada · Docket 26-05029 · Nevada Power Co · Nevada

  5. Utility commissionPending before the commissionLarge loads

    Application of Nevada Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests

    Public Utilities Commission of Nevada · Docket 26-03010 · Nevada Power Co · Nevada

  6. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.

    Public Utilities Commission of Nevada · Docket 26-05026 · Sierra Pacific Power Co · Nevada

  7. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)

    Public Utilities Commission of Nevada · Docket 26-05027 · Sierra Pacific Power Co · Nevada

  8. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers

    Public Utilities Commission of Nevada · Docket 26-05028 · Sierra Pacific Power Co · Nevada

  9. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests

    Public Utilities Commission of Nevada · Docket 26-03009 · Sierra Pacific Power Co · Nevada

  10. Utility commissionPending before the commissionLarge loads

    Nevada Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate

    Public Utilities Commission of Nevada · Docket 26-09006 · Nevada Power Co · Nevada

  11. Utility commissionProposedLarge loads

    APS and TSMC Arizona 25-Year Direct Pricing Contract

    Arizona Corporation Commission · Arizona Public Service Company · Arizona

  12. Utility commissionPending before the commissionLarge loads

    Application of Southwestern Public Service Company for Approval of Large Load Customer Tariff Provisions

    Public Utility Commission of Texas · Docket Docket No. 60332 · Southwestern Public Service Co · Texas

  13. Utility commissionDecidedLarge loads

    APPLICATION OF PUBLIC SERVICE COMPANY OF OKLAHOMA, AN OKLAHOMA CORPORATION, FOR AN ADJUSTMENT IN ITS RATES AND CHARGES AND THE ELECTRIC SERVICE RULES, REGULATIONS AND CONDITIONS OF SERVICE FOR ELECTRIC SERVICE IN THE STATE OF OKLAHOMA AND TO APPROVE VARIOUS COST RECOVERY MECHANISMS AND TARIFFS

    Oklahoma Corporation Commission · Docket PUD2025-000075 · Public Service Co of Oklahoma · Oklahoma

  14. Utility commissionPending before the commissionLarge loads

    Application of El Paso Electric Company for Approval of a High Load Factor Large Power Service Tariff

    Public Utility Commission of Texas · Docket Docket No. 59611 · El Paso Electric Co · Texas

  15. Utility commissionPending before the commissionLarge loads

    Joint Application of Comanche Peak Power Company LLC and Amazon Data Services, Inc. for Approval of a Net Metering Arrangement

    Public Utility Commission of Texas · Docket Docket No. 59399 · Oncor Electric Delivery Company LLC · Texas

  16. Utility commissionPending before the commissionLarge loads

    Application of El Paso Electric Company to Amend Its Certificate of Convenience and Necessity for a 366 MW Natural Gas Generation Facility

    Public Utility Commission of Texas · Docket Docket No. 59076 · El Paso Electric Co · Texas

  17. Utility commissionPending before the commissionLarge loads

    Petition for a limited proceeding to approve large load tariff by Duke Energy Florida, LLC (Section 366.043 refiling)

    Florida Public Service Commission · Docket 20260064-EI · Duke Energy Florida, LLC · Florida

  18. Utility commissionDecidedLarge loads

    Schedule L-27-HIL, Large Light and Power High Impact Load

    Board of the South Carolina Public Service Authority · South Carolina Public Service Authority · South Carolina

  19. Utility commissionPending before the commissionLarge loads

    Application of Southwestern Electric Power Company for Authority to Amend Tariffs for Retail Service to Include New Standard Form Contract for Electric Service, Large Load

    Public Utility Commission of Texas · Docket Docket No. 58796 · Southwestern Electric Power Co · Texas

  20. Utility commissionPending before the commissionLarge loads

    In the Matter of the Application of Oklahoma Gas and Electric Company for an Order of the Commission Approving its New Extra Large Load Tariff and Terms and Conditions of Service for Extra Large Load Customers and a Regulatory Asset to Recover Costs Associated with Portfolio Optimization Software

    Oklahoma Corporation Commission · Docket PUD2026-000046 · Oklahoma Gas & Electric Co · Oklahoma

  21. Utility commissionPending before the commissionLarge loads

    Application of Tucson Electric Power Company for the Establishment of Just and Reasonable Rates and Charges Designed to Realize a Reasonable Rate of Return on the Fair Value of the Properties of Tucson Electric Power Company

    Arizona Corporation Commission · Docket E-01933A-25-0103 · Tucson Electric Power Company · Arizona

  22. Utility commissionDecidedLarge loads

    Generic Proceeding to Establish a Process for Consideration of Contracts for Electric Service Between Alabama Power Company and Large Load Data Center Customers

    Alabama Public Service Commission · Docket 33709 · Alabama

  23. Utility commissionPending before the commissionLarge loads

    Application of Cleco Power LLC for authorization of certain contracts, including a site specific contract, as well as certification of transmission interconnection, new generation, and associated waivers for a large load customer pursuant to the Commission’s Lightning Initiative

    Louisiana Public Service Commission · Docket U-38035 · Cleco Power LLC · Louisiana

  24. Utility commissionDecidedLarge loads

    Joint Application of West Texas Solar Project II LLC and Silver Basin Digital Infrastructure LLC for Approval of a Net Metering Arrangement

    Public Utility Commission of Texas · Docket Docket No. 59115 · AEP Texas North Company · Texas

  25. Utility commissionPending before the commissionLarge loads

    Joint Application of Willow Springs Wind Farm, LLC and Haskell DC Owner LLC for Approval of a Net Metering Arrangement

    Public Utility Commission of Texas · Docket Docket No. 59943 · AEP Texas North Company · Texas

  26. Utility commissionDecidedLarge loads

    Petition of Indianapolis Power & Light Company d/b/a AES Indiana for approval of a project required primarily to serve a large load customer, customer-specific arrangements, and an alternative regulatory plan (Google, Morgan County)

    Indiana Utility Regulatory Commission · Docket Cause No. 46394 · AES Indiana · Indiana

  27. Utility commissionDecidedLarge loads

    Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate

    Public Utilities Commission of Nevada · Docket 26-09005 · Sierra Pacific Power Co · Nevada

  28. Utility commissionPending before the commissionLarge loads

    Application of Duke Energy Carolinas, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)

    North Carolina Utilities Commission · Docket E-7, Sub 1329 · Duke Energy Carolinas, LLC · North Carolina

  29. Utility commissionPending before the commissionLarge loads

    Application of Duke Energy Progress, LLC for Adjustment of Rates and Charges Applicable to Electric Service in North Carolina and Performance-Based Regulation (Large Load Tariff settlement)

    North Carolina Utilities Commission · Docket E-2, Sub 1380 · Duke Energy Progress, LLC · North Carolina

  30. Utility commissionPending before the commissionLarge loads

    In the Matter of the Commission's Inquiry and Review of the Existing Rate Classifications and Other Potential Issues Relating to Data Centers

    Arizona Corporation Commission · Docket E-00000A-25-0069 · Arizona Public Service Company · Arizona

  31. Utility commissionPending before the commissionLarge loads

    Alabama Power contracts for electric service with large load data center customers filed under Rate FCR during the Docket 33709 interim process (Dotier, LLC; Alabama ADC Holdings, LLC; Woostor, LLC and APLD BHM-01 LLC)

    Alabama Public Service Commission · Alabama

  32. Utility commissionDecidedLarge loads

    Application of DTE Electric Company for approval of special contracts and related relief (Google LLC, Van Buren Township)

    Michigan Public Service Commission · Docket U-22058 · DTE Electric · Michigan

  33. Utility commissionIn effectLarge loads

    Electric Service Schedule TDC, Time of Use Data Service

    Memphis Light, Gas and Water Division, City of Memphis · Memphis Light, Gas and Water · Tennessee

  34. Utility commissionPending before the commissionLarge loads

    Florida Power & Light Company’s Compliance Filing Pursuant to Section 366.043, Florida Statutes

    Florida Public Service Commission · Docket 20260149-EI · Florida Power & Light Co · Florida

  35. Utility commissionPending before the commissionLarge loads

    Petition by Florida Public Utilities Company to Implement a Large Load Service Tariff

    Florida Public Service Commission · Docket 20260148-EI · Florida Public Utilities Co · Florida

  36. Utility commissionIn effectLarge loads

    Black Hills Corp., definitive agreements to serve Google's planned Cheyenne, Wyoming data center: Large Power Contract Services Agreement (LPCSA) and Generation Facilities Agreement (GFA)

    Wyoming Public Service Commission · Cheyenne Light Fuel & Power · Wyoming

  37. Utility commissionPending before the commissionLarge loads

    Petition for Approval of Large Load Customer Tariffs by Tampa Electric Company

    Florida Public Service Commission · Docket 20260146-EI · Tampa Electric Co · Florida

  38. Utility commissionPending before the commissionLarge loads

    Directive to Electric Distribution Companies regarding data center interconnection requests, pursuant to Executive Order No. 658

    Massachusetts Department of Public Utilities · Docket D.P.U. 26-DC · Massachusetts Electric Co · Massachusetts

  39. Utility commissionPending before the commissionLarge loads

    Directive to Electric Distribution Companies regarding data center interconnection requests, pursuant to Executive Order No. 658

    Massachusetts Department of Public Utilities · Docket D.P.U. 26-DC · Fitchburg Gas & Elec Light Co · Massachusetts

  40. Utility commissionPending before the commissionLarge loads

    Directive to Electric Distribution Companies regarding data center interconnection requests, pursuant to Executive Order No. 658

    Massachusetts Department of Public Utilities · Docket D.P.U. 26-DC · NSTAR Electric Company · Massachusetts

Sources on this page

  1. 1
    PUC docket page, C-2026-3065756 (Pennsylvania Consumer Advocate v. PPL Electric Utilities Corporation)
    Pennsylvania Public Utility Commission
    Tier 1 · Draft research, not yet verified · Open the source
  2. 2
    PPLICA Petition to Intervene, C-2026-3065756
    Pennsylvania Public Utility Commission
    Tier 1 · Draft research, not yet verified · Open the source
  3. 3
    PUC docket page, P-2026-3065185 (PPL Customer Protection Transmission Rider petition)
    Pennsylvania Public Utility Commission
    Tier 1 · Draft research, not yet verified · Open the source
  4. 4
    RESA Prehearing Memorandum, P-2026-3065185
    Pennsylvania Public Utility Commission
    Tier 1 · Draft research, not yet verified · Open the source
  5. 5
    PUCN docket information list (all utilities)
    Public Utilities Commission of Nevada
    Tier 1 · Draft research, not yet verified · Open the source
  6. 6
    APS submits long-term energy agreement with TSMC to the Arizona Corporation Commission
    Arizona Public Service Company
    Tier 1 · Draft research, not yet verified · Open the source
  7. 7
    PUCT Interchange filing index, Project or Docket No. 60332
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  8. 8
    ALJ Report and Recommendation, Entry No. 872, Cause No. PUD2025-000075 (Public Service Company of Oklahoma rate case)
    Oklahoma Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  9. 9
    PUCT Interchange filing index, Project or Docket No. 59611
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  10. 10
    PUCT Interchange filing index, Project or Docket No. 59399
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  11. 11
    PUCT Interchange filing index, Project or Docket No. 59076
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  12. 12
    Commission Vote Sheet, Item 3, Docket 20260064-EI (November 3, 2026)
    Florida Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  13. 13
    Management Rate Recommendation Presentation to the Board (May 1, 2026): High Impact Load Schedule L-27-HIL comparison
    South Carolina Public Service Authority
    Tier 1 · Draft research, not yet verified · Open the source
  14. 14
    Santee Cooper Board approves new rates for 2027 and 2028 (newsroom release)
    South Carolina Public Service Authority
    Tier 4 · Draft research, not yet verified · Open the source
  15. 15
    PUCT Interchange filing index, Project or Docket No. 58796
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  16. 16
    OG&E Proposed Large-Load Tariff Protects Oklahoma households
    Oklahoma Gas and Electric Company
    Tier 4 · Draft research, not yet verified · Open the source
  17. 17
    TEP Requests Rate Review to Support Safe, Resilient, Reliable Service
    Tucson Electric Power
    Tier 1 · Draft research, not yet verified · Open the source
  18. 18
    2026 Rates
    Tucson Electric Power
    Tier 1 · Draft research, not yet verified · Open the source
  19. 19
    AriSEIA Exceptions to the Recommended Opinion and Order, Docket No. E-01933A-25-0103
    Arizona Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  20. 20
    Order, Generic Proceeding to Establish a Process for Consideration of Contracts for Electric Service Between Alabama Power Company and Large Load Data Center Customers (Docket 33709)
    Alabama Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  21. 21
    Rate FCR-LLDC, Flexible Contract Rate, Large Load Data Centers (filed in Docket 33709)
    Alabama Power Company
    Tier 1 · Draft research, not yet verified · Open the source
  22. 22
    Order No. U-38035 (October 15, 2026), procedural order under the Lightning Initiative
    Louisiana Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  23. 23
    PUCT Interchange filing index, Project or Docket No. 59115
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  24. 24
    PUCT Interchange filing index, Project or Docket No. 59943
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  25. 25
    IURC Approves Customer-Protected Growth Plan to Serve Large Load Investment, Delivering an Estimated $770 Million in Customer Savings
    AES Indiana
    Tier 4 · Draft research, not yet verified · Open the source
  26. 26
    AES Indiana and Google partner announcement (HEA 1007 filing)
    AES Indiana
    Tier 4 · Draft research, not yet verified · Open the source
  27. 27
    Agreement and Stipulation of Settlement on Large Load Tariff, Dockets E-7 Sub 1329 and E-2 Sub 1380 (filed October 6, 2026)
    Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (filing parties)
    Tier 2 · Draft research, not yet verified · Open the source
  28. 28
    Filing in Docket No. E-00000A-25-0069 (data center rate classifications inquiry)
    Arizona Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  29. 29
    Attorney General Mayes urges Arizona Corporation Commission investigation of APS Power Supply Adjustor (press release)
    Office of the Arizona Attorney General
    Tier 1 · Draft research, not yet verified · Open the source
  30. 30
    SELC Initial Comments on Large Load Contracts, Docket 33709
    Southern Environmental Law Center (filed in Ala. PSC Docket 33709)
    Tier 2 · Draft research, not yet verified · Open the source
  31. 31
    MPSC approves DTE Electric energy contracts for Google data center, protects other customers from the project's costs (news release)
    Michigan Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  32. 32
    Electric Service Schedule TDC, Time of Use Data Service (rate effective October 1, 2026)
    Memphis Light, Gas and Water Division, City of Memphis
    Tier 1 · Draft research, not yet verified · Open the source
  33. 33
    Florida Power and Light Company Compliance Filing Pursuant to Section 366.043, Florida Statutes, Docket 20260149-EI (filed October 1, 2026), Exhibit A reproducing the in-effect LLCS-1 and LLCS-2 tariff sheets
    Florida Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  34. 34
    Petition by Florida Public Utilities Company to Implement a Large Load Service Tariff, Docket 20260148-EI (filed October 1, 2026)
    Florida Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  35. 35
    Black Hills Corp. Executes Definitive Agreements to Serve Google's Planned Data Center in Cheyenne, Wyoming (press release, Exhibit 99.1 to Form 8-K)
    Black Hills Corp.
    Tier 1 · Draft research, not yet verified · Open the source
  36. 36
    Petition for Approval of Large Load Customer Tariffs by Tampa Electric Company, Docket 20260146-EI (filed September 30, 2026)
    Florida Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  37. 37
    Directive to Electric Distribution Companies regarding data center interconnection requests, pursuant to Executive Order No. 658
    Massachusetts Department of Public Utilities
    Tier 1 · Draft research, not yet verified · Open the source
  38. 38
    Executive Order No. 658: Establishing Requirements for Responsible Data Center Development and Operations in Massachusetts
    Commonwealth of Massachusetts (mass.gov)
    Tier 1 · Draft research, not yet verified · Open the source