Data center court cases and dockets

A docket is a case's public file. These are the lawsuits and the utility commission proceedings (rate cases, large-load rules, agreements) that touch data centers, newest activity first. Each links to its source.

See this week's Docket Drop

211 dockets, page 2 of 6

Cases and proceedings

  1. Utility commissionPending before the commissionLarge loads

    SB 6 Implementation

    Public Utility Commission of Texas · Docket Project No. 58317 · AEP Texas North Company · Texas

  2. Utility commissionDecidedLarge loads

    Rulemaking to Implement Large Load Interconnection Standards Under PURA 37.0561

    Public Utility Commission of Texas · Docket Project No. 58481 · AEP Texas North Company · Texas

  3. Utility commissionDecidedLarge loads

    Entergy Arkansas, LLC application for a public interest finding and approval of a 20-year power purchase agreement for the Big Island Solar facility (Mississippi County)

    Arkansas Public Service Commission · Docket 26-003-U · Entergy Arkansas LLC · Arkansas

  4. Utility commissionPending before the commissionLarge loads

    PacifiCorp Advice No. 25-015, Schedule 401, Service to New Large Energy Use Facilities

    Public Utility Commission of Oregon · Docket UE 463 · PacifiCorp · Oregon

  5. Utility commissionPending before the commissionLarge loads

    Application for a certificate of public convenience and necessity to construct and operate an approximate 1200 MW combined cycle gas plant at the Fort Martin power station and 70 MW of solar generation

    Public Service Commission of West Virginia · Docket 26-0108-E-CN · Monongahela Power Co · West Virginia

  6. Utility commissionPending before the commissionLarge loads

    Petition of Northern Virginia Electric Cooperative for approval of revisions to the Terms and Conditions of Rate Schedules LP-1, DPS, HV-1 and HV-2

    Virginia State Corporation Commission · Docket PUR-2026-00114 · Northern Virginia Electric Cooperative · Virginia

  7. Court casePending

    Valley View School District v. Project Gravity developers and Archbald Borough (caption as described by the district's solicitor; formal caption not published in sources read)

    Court of Common Pleas of Lackawanna County · Archbald · Pennsylvania

    About: Project Gravity data center

  8. Court casePending

    Morris et al. v. Meta Platforms, Inc. et al. (Stanton Springs wells)

    Superior Court of Gwinnett County, Georgia · Docket 26-A-07974-11 · Newton County · Georgia

    About: Meta Newton Data Center (Stanton Springs)

  9. Utility commissionDecidedLarge loads

    Application of Indiana Michigan Power Company for approval of modifications to its Large Power Tariff, Tariff LP

    Michigan Public Service Commission · Docket U-21986 · Indiana Michigan Power · Michigan

  10. Utility commissionDecidedLarge loads

    Large Load Contract deemed filed for review under the Docket No. 44280 Large Load Contract Review Process (Joint Statement of Commission Staff and Georgia Power Company, July 27, 2026)

    Georgia Public Service Commission · Docket 44280 · Georgia Power Company · Georgia

  11. Utility commissionPending before the commissionLarge loads

    Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)

    Virginia State Corporation Commission · Docket PUR-2026-00131 · Dominion Energy Virginia · Virginia

  12. Utility commissionDecidedLarge loads

    Electronic Tariff Filing of Big Rivers Electric Corporation of a Retail Electric Service Agreement with Justified DataPower LLC, a subsidiary of TeraWulf Inc.

    Kentucky Public Service Commission · Docket 2026-00115 · Big Rivers Electric Corporation · Kentucky

  13. Utility commissionDecidedLarge loads

    The Narragansett Electric Company d/b/a Rhode Island Energy, Application for Approval of a Change in Electric and Gas Base Distribution Rates (directive to file an extra-large load tariff)

    Rhode Island Public Utilities Commission · Docket 25-45-GE and 25-33-GE · The Narragansett Electric Co · Rhode Island

  14. Utility commissionDecidedLarge loads

    Final 2026 Integrated Resource Plan (Board approval)

    Tennessee Valley Authority Board of Directors · Tennessee Valley Authority · Tennessee

  15. Utility commissionPending before the commissionLarge loads

    Review of ERCOT's Interconnection Processes for Large Loads

    Public Utility Commission of Texas · Docket Project No. 59142 · Texas

  16. Utility commissionDecidedLarge loads

    TVA Large Data Service rate and Capacity Commitment Charge (wholesale rate action)

    Tennessee Valley Authority Board of Directors · Tennessee Valley Authority · Tennessee

  17. Utility commissionPending before the commissionLarge loads

    Amazon Data Services, Inc. v. PacifiCorp d/b/a Pacific Power

    Public Utility Commission of Oregon · Docket UM 2410 · PacifiCorp · Oregon

  18. Court casePending

    Dymski and Shivell v. Cumberland County Conservation District and Pennsylvania Department of Environmental Protection; Carlisle Development Partners, LLC, permittee

    Pennsylvania Environmental Hearing Board · Docket 2026- (suffix blank on the filed copy) · Middlesex Township · Pennsylvania

    About: Pennsylvania Digital I (PAX-1)

  19. Utility commissionPending before the commissionLarge loads

    Application of Entergy Louisiana, LLC for certification of generation and transmission resources and for other relief (Lightning Initiative)

    Louisiana Public Service Commission · Docket U-37882 · Entergy Louisiana LLC · Louisiana

  20. Court casePending

    Gerber et al. v. Zoning Hearing Board of Middlesex Township, Board of Supervisors of Middlesex Township, and Carlisle Development Partners, LLC (substantive validity challenge)

    Court of Common Pleas of Cumberland County, Pennsylvania · Docket 2026-08758 Civil Term · Middlesex Township · Pennsylvania

    About: Pennsylvania Digital I (PAX-1)

  21. Utility commissionPending before the commissionLarge loads

    In the matter of the application of El Paso Electric Company for revision of its retail electric rates pursuant to Advice Notice No. 317

    New Mexico Public Regulation Commission · Docket 25-00082-UT · El Paso Electric Co · New Mexico

  22. Utility commissionPending before the commissionLarge loads

    Application of Duke Energy Ohio for approval of a data center rate class (Rate DC)

    Public Utilities Commission of Ohio · Docket 26-0755-EL-ATA · Duke Energy Ohio · Ohio

  23. Utility commissionProposedLarge loads

    Rulemaking to Update Wholesale and IOU Retail Transmission Cost Recovery in the ERCOT Region

    Public Utility Commission of Texas · Docket Project No. 58000 · AEP Texas North Company · Texas

  24. Utility commissionPending before the commissionLarge loads

    Application of The Dayton Power and Light Company (AES Ohio) for an increase in electric distribution rates, multi-year rate plan 2027-2029, with a stipulated Data Center Tariff

    Public Utilities Commission of Ohio · Docket 25-0958-EL-AIR · AES Ohio · Ohio

  25. Utility commissionPending before the commissionLarge loads

    Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.

    Public Utilities Commission of Nevada · Docket 26-05026 · Sierra Pacific Power Co · Nevada

  26. Utility commissionIn effectLarge loads

    Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I

    Public Utility Commission of Oregon · Docket UM 2377 · Portland General Electric Co · Oregon

  27. Utility commissionPending before the commissionLarge loads

    Application of Arizona Public Service Company for approval of new rates, charges, and schedules

    Arizona Corporation Commission · Docket E-01345A-25-0105 · Arizona Public Service Company · Arizona

  28. Court caseDismissed

    Caruthers et al. v. County of Sangamon, Sangamon County Board, and C1 Sangamon I LLC (CyrusOne conditional use permit)

    Circuit Court of Sangamon County, Illinois (Seventh Judicial Circuit) · Docket Case No. 2026MR236 · Sangamon County · Illinois

    About: CyrusOne Sangamon County Campus

  29. Court casePending

    1000 Friends of Oregon et al. v. City of Hillsboro et al.

    Circuit Court of the State of Oregon for the County of Washington · Docket 26CV30954 · Washington County · Oregon

    About: NTT Hillsboro data center campus

  30. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,211

    Federal Energy Regulatory Commission · Docket EL26-67-000 · Federal

  31. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,212

    Federal Energy Regulatory Commission · Docket EL26-70-000 · Federal

  32. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,213

    Federal Energy Regulatory Commission · Docket EL26-68-000 · Federal

  33. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,214

    Federal Energy Regulatory Commission · Docket EL26-71-000 · Federal

  34. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,215

    Federal Energy Regulatory Commission · Docket EL26-72-000 · Federal

  35. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act (large load tariff terms), 195 FERC para. 61,216

    Federal Energy Regulatory Commission · Docket EL26-69-000 · Federal

  36. Utility commissionPending before the commissionLarge loads

    Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating With Other Proceedings (co-located load arrangements, PJM)

    Federal Energy Regulatory Commission · Docket EL25-49-000 · Federal

  37. Utility commissionDecidedLarge loads

    Verified Joint Petition of Northern Indiana Public Service Company LLC (NIPSCO) and NIPSCO Generation LLC (GenCo) for approval of a special contract (Data Center Customer #1 Special Contract), a power purchase agreement between NIPSCO and GenCo, and alternative regulatory plans

    Indiana Utility Regulatory Commission · Docket Cause No. 46322 · Northern Indiana Public Service Company · Indiana

  38. Utility commissionDecidedLarge loads

    Dominion Energy South Carolina, Inc. general rate case (Agreement and Stipulation of Settlement Regarding Large Load Issues)

    Public Service Commission of South Carolina · Docket 2025-325-E · Dominion Energy South Carolina, Inc · South Carolina

  39. Utility commissionPending before the commissionLarge loads

    Application of Kentucky Utilities Company d/b/a Old Dominion Power Company for an adjustment of electric base rates

    Virginia State Corporation Commission · Docket PUR-2026-00051 · Kentucky Utilities Co · Virginia

  40. Court casePending

    Gerber et al. v. Board of Supervisors of Middlesex Township; Carlisle Development Partners, LLC, intervenor (land use appeal)

    Court of Common Pleas of Cumberland County, Pennsylvania · Docket 2026-06465 Civil Term · Middlesex Township · Pennsylvania

    About: Pennsylvania Digital I (PAX-1)

Sources on this page

  1. 1
    PUCT Interchange filing index, Project or Docket No. 58317
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  2. 2
    SB 6 Rulemakings Chart
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  3. 3
    PUCT sets financial commitments for data center interconnection as governor pauses permit approvals
    White and Case LLP
    Tier 2 · Draft research, not yet verified · Open the source
  4. 4
    PUCT Adopts 16 TAC 25.194: Texas Large Load Financial Security Replaces the Interconnection Fee
    SiteBraid
    Tier 3 · Draft research, not yet verified · Open the source
  5. 5
    Order No. 6 (Doc. 87), Docket No. 26-003-U, denying the Big Island Solar power purchase agreement application
    Arkansas Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  6. 6
    Alliance of Western Energy Consumers filing in Docket No. UE 463
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  7. 7
    PacifiCorp Surrebuttal Testimony of Robert M. Meredith, Docket No. UE 463, with Exhibit PAC/301 (Revised Schedule 401)
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  8. 8
    Stipulation, Docket No. UE 463, Advice No. 25-015, Schedule 401
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  9. 9
    Procedural Order, Case No. 26-0108-E-CN (March 17, 2026)
    Public Service Commission of West Virginia
    Tier 1 · Draft research, not yet verified · Open the source
  10. 10
    Order for Notice and Hearing, Case No. PUR-2026-00114 (NOVEC terms and conditions revisions)
    Virginia State Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  11. 11
    Data Centers in Archbald: Why Communities Need Regulation (Valley View School District solicitor's account of the Archbald cases)
    Joyce, Carmody & Moran PC
    Tier 4 · Draft research, not yet verified · Open the source
  12. 12
    Morris et al. v. Meta Platforms, Inc. et al., complaint (Civil Action File No. 26-A-07974-11)
    Superior Court of Gwinnett County, Georgia (filed complaint, hosted by ALM)
    Tier 1 · Draft research, not yet verified · Open the source
  13. 13
    Order, Case No. U-21986 (Indiana Michigan Power Company, Large Power Tariff, Tariff LP)
    Michigan Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  14. 14
    Michigan Commission Strengthens Large Load Rules for DTE Electric, Indiana Michigan Power
    EnerKnol
    Tier 3 · Draft research, not yet verified · Open the source
  15. 15
    Investor Meetings handout, September 2026 (large load tariff comparison table)
    American Electric Power
    Tier 4 · Draft research, not yet verified · Open the source
  16. 16
    Joint Statement of Commission Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed for Purposes of Review, July 27, 2026 (statement dated August 26, 2026)
    Georgia Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  17. 17
    How the SCC Rider T1 Decision Protects Ratepayers
    Virginia State Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  18. 18
    Order, Case No. 2026-00115, Big Rivers Electric Corporation retail electric service agreement with Justified DataPower LLC (August 21, 2026)
    Kentucky Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  19. 19
    Draft Minutes of Open Meeting, August 21, 2026, Docket Nos. 25-45-GE and 25-33-GE (Rhode Island Energy base distribution rate case)
    Rhode Island Public Utilities Commission
    Tier 1 · Draft research, not yet verified · Open the source
  20. 20
    TVA Board Protects Consumers, Strengthens Reliability Amid Rising Power Demand
    Tennessee Valley Authority
    Tier 1 · Draft research, not yet verified · Open the source
  21. 21
    ERCOT Updates: Good Cause Exceptions for PGRR 145, Batch Zero Verification and Audit Process, and Community Impact Review Process (Project No. 59142, Item 52)
    Electric Reliability Council of Texas, Inc.
    Tier 1 · Draft research, not yet verified · Open the source
  22. 22
    TVA Board Creates Data Center Rate to Shield Households From AI Power Costs
    Unite.AI
    Tier 3 · Draft research, not yet verified · Open the source
  23. 23
    ALJ Ruling, Docket UM 2410 (Amazon Data Services, Inc. v. PacifiCorp)
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  24. 24
    Third Joint Status Report and Motion to Extend Suspension of Procedural Schedule, Docket UM 2410
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  25. 25
    Notice of Appeal (Dymski and Shivell v. Cumberland County Conservation District and PA DEP; Carlisle Development Partners, LLC, permittee)
    Pennsylvania Environmental Hearing Board (appellants' filing)
    Tier 1 · Draft research, not yet verified · Open the source
  26. 26
    Referral of Interlocutory Ruling to Commissioners for Review, Docket No. U-37882
    Louisiana Public Service Commission
    Tier 1 · Draft research, not yet verified · Open the source
  27. 27
    Petition to Confirm and Enforce the Stay of Proceedings Under 53 P.S. 10915.1(a), No. 2026-08758 Civil Term
    Court of Common Pleas of Cumberland County (appellants' filing)
    Tier 1 · Draft research, not yet verified · Open the source
  28. 28
    Response in Opposition to Petition to Confirm and Enforce Stay, No. 2026-08758 Civil Term
    Court of Common Pleas of Cumberland County (intervenor filing)
    Tier 1 · Draft research, not yet verified · Open the source
  29. 29
    EPE Rate Proposal Case, Case No. 25-00082-UT
    New Mexico Public Regulation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  30. 30
    Second Notice to EPE Customers, Case No. 25-00082-UT (amended application, August 6, 2026)
    El Paso Electric Company
    Tier 4 · Draft research, not yet verified · Open the source
  31. 31
    Data Center Tariff for Ohio Electric Customers (AEP Ohio and Duke Energy Ohio filings compared)
    The Cincinnati Exchange
    Tier 3 · Draft research, not yet verified · Open the source
  32. 32
    PUC Staff Seeks To Make Utility's Proposed Default Service For New Data Centers Applicable To All Data Centers
    EnergyChoiceMatters
    Tier 3 · Draft research, not yet verified · Open the source
  33. 33
    Proposal for Publication of Amendments to 25.192 and 25.193 and New 25.252, Project No. 58000, Item 8
    Public Utility Commission of Texas
    Tier 1 · Draft research, not yet verified · Open the source
  34. 34
    Texas Register, Proposed Rules, Title 16 (July 24, 2026 issue)
    Texas Secretary of State
    Tier 1 · Draft research, not yet verified · Open the source
  35. 35
    The OEC Joins AES Ohio Rate Case Settlement
    Ohio Environmental Council
    Tier 4 · Draft research, not yet verified · Open the source
  36. 36
    AES Ohio's proposed data-center tariff adds exit exposure to collateral
    AltSS
    Tier 3 · Draft research, not yet verified · Open the source
  37. 37
    PUCN docket information list (all utilities)
    Public Utilities Commission of Nevada
    Tier 1 · Draft research, not yet verified · Open the source
  38. 38
    Order No. 26-154, Investigation into Marginal Cost Study Treatment of Costs for Large Customers and Further Modifications to Portland General Electric Company's Rule C and Rule I, Docket UM 2377
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  39. 39
    Oregon PUC Approves New Rate Structure to Protect Customers Amid Rapid Data Center Growth
    Public Utility Commission of Oregon
    Tier 1 · Draft research, not yet verified · Open the source
  40. 40
    Public Notice of Hearing and Public Comment Meetings on Arizona Public Service Company Rate Application, Docket No. E-01345A-25-0105
    Arizona Public Service Company
    Tier 1 · Draft research, not yet verified · Open the source
  41. 41
    What's Next in the APS Rate Case?
    Arizona Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  42. 42
    Judge dismisses county's first data center lawsuit
    Illinois Times
    Tier 3 · Draft research, not yet verified · Open the source
  43. 43
    Judge Dismisses Lawsuit Challenging CyrusOne Data Center Approval
    Sangamon Reporter
    Tier 3 · Draft research, not yet verified · Open the source
  44. 44
    Petition for Writ of Review and Complaint for Declaratory and Injunctive Relief, 1000 Friends of Oregon et al. v. City of Hillsboro et al., Case No. 26CV30954 (filed 2026-06-22)
    Circuit Court of the State of Oregon for the County of Washington
    Tier 1 · Draft research, not yet verified · Open the source
  45. 45
    PJM, List of Orders (EL25-49-000; EL26-67-000)
    Federal Energy Regulatory Commission
    Tier 1 · Draft research, not yet verified · Open the source
  46. 46
    Major Orders & Regulations (June 18, 2026 large load show cause orders, EL26-67 to EL26-72)
    Federal Energy Regulatory Commission
    Tier 1 · Draft research, not yet verified · Open the source
  47. 47
    Cost Transparency and Customer Protection Initiatives in FERC's June 2026 Show Cause Orders for Large Load Interconnections
    Federal Energy Regulatory Commission, Office of Public Participation
    Tier 1 · Draft research, not yet verified · Open the source
  48. 48
    Regulatory Approvals Underscore Strength of NiSource's Customer-Focused Data Center Strategy Supporting Growth in Indiana (NiSource release, republished)
    NiSource Inc. (Business Wire, republished)
    Tier 4 · Draft research, not yet verified · Open the source
  49. 49
    Agreement and Stipulation of Settlement Regarding Large Load Issues, Docket No. 2025-325-E (filed May 8, 2026)
    Public Service Commission of South Carolina
    Tier 1 · Draft research, not yet verified · Open the source
  50. 50
    Order for Notice and Hearing, Case No. PUR-2026-00051 (Kentucky Utilities Company d/b/a Old Dominion Power Company)
    Virginia State Corporation Commission
    Tier 1 · Draft research, not yet verified · Open the source
  51. 51
    Motion to Quash Land Use Appeal, Gerber et al. v. Board of Supervisors of Middlesex Township, No. 2026-06465 Civil Term
    Court of Common Pleas of Cumberland County (intervenor filing)
    Tier 1 · Draft research, not yet verified · Open the source
  52. 52
    Petition for Stay of the Actions Appealed Pursuant to 53 P.S. 11003-A(d), No. 2026-06465 Civil Term
    Court of Common Pleas of Cumberland County (appellants' filing)
    Tier 1 · Draft research, not yet verified · Open the source