What it means for locals
A data center is not just a building. It can arrive as an electric customer the size of a small city, a major taxpayer, a heavy water user, and a new employer, all in one county. This page shows what that does to local residents, from the public record, in both directions.
Data centers change what nearby households pay and what their county collects, and this page keeps both sides on the record. It publishes the residential electricity prices utilities filed with the U.S. Energy Information Administration (2016 to 2025), draft ratings of what 80 bills do to households (29 help, 0 cost, 0 mixed, 51 unclear), and the property tax figures counties state in their own budgets. Where no record states a figure, the page says what is not counted yet.
Find your county
Start with where you live. Your county page lists every project we track there.
Your utility bills
A data center can draw as much electricity as a small city. Rate cases and regulator orders say where that cost lands, and bills in statehouses decide who pays for the new lines and plants.
So far, 80 bills carry a draft rating for what they do to households: 29 help households, 0 cost households, 0 are mixed, and 51 are unclear. Each rating quotes the bill itself.
See the rated bills on Bill Watch
We also publish what households actually paid: the average residential electricity price each utility filed with the U.S. Energy Information Administration, year by year, for every utility where we hold a run of years.
See residential electricity prices by utility
And we publish how much new load is coming: every load figure utilities, grid operators, and agencies have stated, state by state, from signed agreements to forecasts.
The projects behind that load, ranked: the largest tracked projects by the biggest announced capacity figure stated for each one.
See the largest projects by announced capacity
Behind every one of those projects stands a fleet of backup generators, and the air permit is where its size becomes a public number: how many engines, of what kind, and the fleet's capacity where the permit states one.
Your taxes
What a data center paid in property tax, what was forgiven to land it, and what your county's rate did are all in the county's own budget documents.
We show tax figures only where a record states them. A falling tax rate does not by itself mean a household's bill fell, because home values can rise, and we do not credit data centers for a change a record does not tie to them. We check claims in both directions on Claim Check.
The agreements themselves, ranked: the largest stated tax breaks on the agreements that state a dollar value, with the tracked projects counted by state and by operator.
Loudoun County, Virginia
47%of the county's property taxes come from data centers
- 2021: $466 million
- 2022: $582 million
- 2023: $685 million
- 2024: $670 million
- 2025: $795 million
- 2026: $879 million (proposed)
- 2016: $1.145
- 2017: $1.125
- 2018: $1.085
- 2019: $1.045
- 2020: $1.035
- 2021: $0.980
- 2022: $0.890
- 2023: $0.875
- 2024: $0.865
- 2025: $0.805
- 2026: $0.805
The percentage is as the county's budget document states it. Grey bars are proposed budget figures, not final results. Rates are the county's stated rate, not what any one household paid.
Mecklenburg County, Virginia
31%of the county's fy2025 come from data centers
- 2023: $0.400
- 2024: $0.370
- 2025: $0.360
- 2026: $0.310
The percentage is as the county's budget document states it. Grey bars are proposed budget figures, not final results. Rates are the county's stated rate, not what any one household paid.
Your water
Cooling can take millions of gallons a day, or almost none. The design decides, and permits and filings state which one a project uses.
Project pages list the water figures a filing states for that site, with the source on each figure. Big numbers gathers the power and water figures we hold across projects.
See the measured water figuresBrowse projectsSee Big numbers
Your town and jobs
Filings promise jobs to win approval. We quote the promise exactly, and track what the same sources report later.
Promised and reported job figures are being added project by project, each one quoted from the filing that states it. A figure we cannot source does not appear. When a county grants a tax break for those jobs, the calculator below divides the break by the promised jobs.
Every figure on this page links to the public record it came from. Our articles explain what these numbers mean for the households behind them.
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
In the territories that publish both numbers, data center power requests run well ahead of signed contracts.
What the record shows · November 22, 2026
One city-metered series exists in the record: The Dalles, Oregon, where Google's campus consumption rose from 13,000 gallons in 2005 to 548.7 million gallons in 2025, per the city's own table.
Questions people ask
- Are data centers driving up my electricity bills?
- The filings we publish do not separate data center load from everything else that moves a price, so the record does not support a flat yes or no. What it shows: the average residential price rose between 2016 and 2025 for 11 of the 11 utility series we publish from U.S. Energy Information Administration filings, and the largest move was PacifiCorp in Oregon, up about 37 percent. Whether a data center caused any of that in a given place is decided case by case in rate cases, where commissions weigh the cost of new lines and plants against the fixed costs a very large customer helps cover.
- Who pays for data center demand?
- The utility commission that approves the rates decides, and in the decided cases we track, the data center itself pays most of the cost of serving it. We track 191 commission proceedings about very large loads; 108 have been decided or are in effect. The decided terms typically require the customer to pay for the lines and equipment built for it, post collateral, sign a minimum contract of 10 to 20 years, and pay for at least 70 to 90 percent of its contracted demand every month whether it uses it or not. Georgia's commission put the principle plainly in one order: the customer pays site-specific costs plus upstream generation, transmission, and distribution costs as construction progresses, so existing customers bear none of the cost of adding the load. Costs a commission does not assign that way are argued in general rate cases, where they can be spread across every customer.
- How do data centers affect the power bills of the communities surrounding them?
- Two ways at once. A data center is a very large new customer: serving it can require new lines, substations, and power plants, and someone pays for those. The same customer also buys electricity around the clock, which spreads the fixed costs of the existing system across far more kilowatt-hours sold. Which effect is bigger in a given town is set by the local rate case, not by the building. This page publishes the price history and the bill ratings so a community can read its own numbers.
- How much water do data centers use?
- It depends on the cooling design, and the range is wide: almost none for air-cooled and closed-loop designs, up to millions of gallons a day for a large evaporative cooling system. There is no single figure for the industry. What exists is a figure per site, stated in its permit, its utility agreement, or the operator's own report. We hold water figures for 18 projects and print each one on its project page with its source. See every measured water figure
- How much water does a data center use per day?
- Per day, the low end is close to zero. A closed-loop site fills its cooling system once and then uses a small amount for upkeep: the operator of the Abilene, Texas campus states about 50,000 gallons per building per year for cooling system maintenance, after a one-time fill of about one million gallons per building. The high end is a large evaporative site, which can use millions of gallons a day. For scale, the U.S. Environmental Protection Agency puts an average family's home water use at more than 300 gallons a day, the figure our water calculator uses.
- How much water does an AI data center use?
- The record does not separate AI sites from other data centers on water, because water use follows the cooling system, not the work the computers do. AI campuses in our record make the same cooling choices as any other site: the Abilene AI campus uses a closed-loop system with a small ongoing water need, while other large sites use evaporative cooling and state far larger figures in their permits. Read the cooling design, not the label.
- How do data centers use water?
- Mostly for cooling. Evaporative systems and cooling towers use water to carry heat away from the servers; air-cooled and closed-loop systems use little water on site. Two words matter when a figure is quoted: withdrawal is water taken in, and consumption is water that is not returned, mostly because it evaporates. Permits and reports often give one or the other, so compare like with like.
- Which states offer data center tax incentives?
- Most data center tax breaks come in two forms: a state exemption on the sales tax charged on equipment, and a property tax deal negotiated with the city or county where the site lands. Our record holds 218 agreements in 18 states (Alabama, Alaska, Arizona, Arkansas, Connecticut, Georgia, Illinois, Indiana, Iowa, Missouri, Nebraska, Nevada, Ohio, Oregon, Pennsylvania, Texas, Utah, and Virginia), including state programs in Illinois, Ohio, Missouri, Nebraska, Oregon, and Nevada, and local agreements across Texas under Chapters 380 and 312 of state law. The deals are listed county by county on the place pages, and the tax break per job calculator divides the valued deals by the jobs they promised.
- How close is the nearest data center?
- Enter your ZIP code in the search on this page and the site lists the tracked projects nearest to you. Distances are measured from the center of the county your ZIP code sits in, so treat them as a guide, not a survey. The list counts projects we track from the public record: a place with nothing listed is a place we have not found a project in the record, not proof that none exists.
- Do data centers change the value of homes nearby?
- The published studies disagree, and we list each one rather than averaging them. A University of California, Berkeley working paper (September 2026) covering 346 large data center announcements across the United States found housing values within 3 miles fell 2.98 percent on average over the following five years, and 7.2 percent within 1 mile. A George Mason University study of 2023 home sales in Northern Virginia found no evidence of a negative effect: in its full model, closer homes sold for more. The home values study tracker lists each study with its sample, its method, and a link to the original. See the home values study tracker
- A data center is proposed near me. What happens next?
- It passes through separate decisions, not one approval. The county board or city council decides the land use, usually after a planning commission hearing. The state environmental agency issues the air, stormwater, water, and wetland permits. The state utility commission sets the terms for power in a docketed proceeding. The local body votes on any tax agreement. Whether a rezoning vote is needed at all depends on the zoning already on the land: where a data center is a by-right use, no rezoning vote happens. Our step-by-step page names who decides each step and links to the votes, permits, and dockets where each one appears in the record. See what happens next, step by step
What we cannot count yet
We will publish each of these only when a record supports it, whichever way it points.
- How many households' electricity bills went down?
Utility regulators publish rate cases and some studies on how large new loads change rates, with mixed results. We will report them with the study quoted, in both directions. - How many counties cut property taxes because of data centers?
We hold sourced tax revenue for a small set of counties so far. We add more as we find budgets that state the amount. - Which drugs were found with the help of AI computing?
AI drug discovery is real, but claims of finished cures are often overstated. We will list only cases a regulator or peer-reviewed paper confirms.