Largest projects by announced capacity
The biggest planned data centers in the record, ranked by how much power each one says it will draw. Every project is ranked by one figure: the largest single announced capacity stated for it, printed as its source states it. Big numbers gathers the record's other counts and records.
When a data center is announced, the announcement usually states how much power the site will draw, in megawatts. This page ranks the projects we track by the largest single figure stated for each one: the top 100 of the 529 projects that publish a figure, out of the 1320 we track. Each figure is printed exactly as its source states it, with what it measures, the date it was stated, and its source. The figures are never added together: a project announces phases and campus totals at different times, so adding its figures, or every project's, would count the same capacity more than once.
1. Fermi Project Matador (Advanced Energy and Intelligence Campus)
Announced capacity: 11,000 MW
What it measures: What it measures is not stated
Covers: Full build (announced total)
Operator: Fermi America
Place: Carson County, Texas
Stage: Under construction
Stated: June 26, 2025
“Spanning 5,769 acres, the campus has the potential to deliver up to 11 gigawatts of power and 18 million square feet of artificial intelligence capacity.”
2. Creekstone Energy Delta Gigasite
Announced capacity: 10,000 MW
What it measures: What it measures is not stated
Covers: Campus at full build
Operator: Creekstone Energy
Place: Delta, Utah
Stage: Under construction
Stated: April 9, 2026
“with a capacity of 10 gigawatts”
Announced capacity: 10,000 MW
What it measures: What it measures is not stated
Covers: Design scale
Operator: Crusoe
Place: Laramie County, Wyoming
Stage: Under construction
Stated: July 24, 2025
“Designed to scale up to 10 gigawatts, this landmark project underscores Crusoe’s ability to rapidly build large-scale AI infrastructure projects”
Announced capacity: 9,000 MW
What it measures: Announced capacity
Operator: O'Leary Digital
Place: Box Elder County, Utah
Stage: Approved
Stated: Not dated
Announced capacity: 8,000 MW
What it measures: What it measures is not stated
Covers: Full buildout
Operator: Nscale
Place: Point Pleasant, West Virginia
Stage: Under construction
Stated: March 16, 2026
“The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.”
6. PORTS-Pike Technology Campus
Announced capacity: 8,000 MW
What it measures: IT load
Covers: Full build (announced total)
Operator: SB Energy
Place: Pike County, Ohio
Stage: Announced
Stated: August 17, 2026
“OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio”
7. Tombstone Resources Cochise Supercomputer Campus
Announced capacity: 6,000 MW
What it measures: Grid connection
Covers: Full build-out (applicant estimate)
Operator: Tombstone Resources
Place: Cochise County, Arizona
Stage: In permitting
Stated: October 30, 2026
“a grid-served supercomputer / data-center campus built in four phases to up to nine (9) computing buildings, approx. 6 GW (6,000 MW) total electric demand at full build-out; Phase 1 approx. 1,500 MW”
8. Meta Richland Parish Data Center
Announced capacity: 5,000 MW
What it measures: What it measures is not stated
Covers: Full campus expansion (announced Jul 2026)
Operator: Meta
Place: Richland Parish, Louisiana
Stage: Under construction
Stated: July 13, 2026
“We're expanding our AI-optimized data center in Richland Parish, Louisiana to 5 GW in compute capacity”
9. Prometheus Hyperscale Evanston Campus
Announced capacity: 5,000 MW
What it measures: What it measures is not stated
Covers: Development path
Operator: Prometheus Hyperscale
Place: Evanston, Wyoming
Stage: Approved
Stated: June 17, 2026
“The vote represents a significant permitting milestone for the 506-acre site, which is designed for 1.25 GW of initial capacity with a development path to 5 GW.”
10. Joule Capital Partners Data Center Campus
Announced capacity: 4,000 MW
What it measures: Announced capacity
Operator: Joule
Place: Holden, Utah
Stage: Under construction
Stated: Not dated
Announced capacity: 3,200 MW
What it measures: Announced capacity
Operator: OpenAI
Place: Rincon, Georgia
Stage: In permitting
Stated: Not dated
12. TECfusions Keystone Connect
Announced capacity: 3,000 MW
What it measures: Announced capacity
Operator: TECfusions
Place: Upper Burrell Township, Pennsylvania
Stage: Operating
Stated: Not dated
13. Project Thunderbird data center and power corridor, Enid
Announced capacity: 2,750 MW
What it measures: IT load
Covers: Full corridor
Operator: Plainsmen Holdings
Place: Enid, Oklahoma
Stage: In permitting
Stated: October 28, 2026
“Up to 2.75 GW IT capacity”
14. Tract Virginia Highlands Technology Park
Announced capacity: 2,500 MW
What it measures: What it measures is not stated
Covers: Marketed potential
Operator: Tract
Place: Storey County, Nevada
Stage: Announced
Stated: June 2, 2026
“Fleet also holds 1,063 acres near Silver Springs that could be developed into 700MW, and its 8,590-acre holdings in Virginia City Highlands could bring another 2,500MW of computer capacity.”
15. Project Jupiter
Announced capacity: 2,450 MW
What it measures: Announced capacity
Operator: Oracle
Place: Santa Teresa, New Mexico
Stage: Under construction
Stated: Not dated
Announced capacity: 2,400 MW
What it measures: What it measures is not stated
Covers: Full campus
Operator: Quantum Loophole
Place: Adamstown, Maryland
Stage: Under construction
Stated: Not dated
“Currently, 2.4 GW of power is under development with 17.4 million square feet of data centers entitled.”
17. Project Tamarack
Announced capacity: 2,160 MW
What it measures: What it measures is not stated
Operator: Starwood Digital Ventures
Place: Mason County, West Virginia
Stage: Announced
Stated: September 3, 2026
“Starwood plans to invest $12 billion in West Virginia, with the project requiring approximately 2.16 gigawatts of power and supporting approximately 1,500 jobs.”
18. Crusoe Abilene AI factory campus for Microsoft
Announced capacity: 2,100 MW
What it measures: What it measures is not stated
Covers: Full Abilene site at full buildout (both campuses)
Operator: Crusoe
Place: Abilene, Texas
Stage: Under construction
Stated: March 27, 2026
“The new campus is located adjacent to Crusoe's existing Abilene AI factory infrastructure, bringing the total projected capacity across the full Abilene site to 2.1 gigawatts (GW).”
Announced capacity: 2,000 MW
What it measures: Announced capacity
Operator: Aligned Data Centers
Place: Shippingport, Pennsylvania
Stage: Under construction
Stated: Not dated
20. Aligned Project Phoenix (Shippingport)
Announced capacity: 2,000 MW
What it measures: Announced capacity
Operator: Aligned Data Centers
Place: Shippingport, Pennsylvania
Stage: Under construction
Stated: Not dated
21. Digital Realty data center campus, Astra Enterprise Park (De Soto)
Announced capacity: 2,000 MW
What it measures: Grid connection
Covers: Full delivery
Operator: Digital Realty
Place: De Soto, Kansas
Stage: Approved
Stated: June 22, 2026
“To support development of the site, Digital Realty has entered into an Energy Service Agreement with the local utility to provide 600 megawatts of utility power by early 2028, rising to two gigawatts at full delivery.”
22. Microsoft Pecos data center campus
Announced capacity: 2,000 MW
What it measures: Announced capacity
Operator: Microsoft
Place: Pecos, Texas
Stage: Announced
Stated: Not dated
Announced capacity: 1,800 MW
What it measures: What it measures is not stated
Operator: PowerHouse Data Centers
Place: Joliet, Illinois
Stage: Approved
Stated: March 19, 2026
“Development will be handled by data center firm PowerHouse Data Centers, and the campus will offer up to 1.8GW of capacity at completion.”
24. Paducah data center campus (DOE Paducah Site)
Announced capacity: 1,800 MW
What it measures: Grid connection
Covers: Full build-out
Operator: Brookfield
Place: McCracken County, Kentucky
Stage: Proposed
Stated: July 29, 2026
“Once fully constructed in 2032, the campus will support up to 1.8 gigawatts (GW) of utility capacity and over 1.2 GW of compute capacity, backed by up to 4.6 GW of dedicated generation resources paid for and built specifically for the project.”
25. Sagebrush and Stark Power Hallam campus
Announced capacity: 1,700 MW
What it measures: Announced capacity
Operator: Stark Power
Place: Hallam, Nebraska
Stage: Proposed
Stated: Not dated
Announced capacity: 1,600 MW
What it measures: Announced capacity
Operator: Galaxy
Place: Dickens County, Texas
Stage: Expanding
Stated: Not dated
Tax agreements on record: 1
27. T5@Chicago IV Grayslake Campus
Announced capacity: 1,600 MW
What it measures: Grid connection
Operator: T5
Place: Grayslake, Illinois
Stage: Under construction
Stated: October 14, 2025
Tax agreements on record: 1
“With up to 1.2GW of IT capacity and 1.6GW of secured utility power, the CHI lV campus will provide the scalable, high-performance infrastructure required to support AI and commercial cloud deployments.”
Announced capacity: 1,600 MW
What it measures: What it measures is not stated
Covers: Full site
Operator: Tract
Place: Lyon County, Nevada
Stage: Approved
Stated: September 17, 2025
“The development site can support up to 1.6 gigawatts (GW) of data center capacity, with an initial 700 megawatts (MW) currently under utility study.”
Announced capacity: 1,500 MW
What it measures: Announced capacity
Operator: Pronghorn Development
Place: Iron County, Utah
Stage: In permitting
Stated: Not dated
30. Core Scientific data center campus, Muskogee (CoreWeave)
Announced capacity: 1,500 MW
What it measures: What it measures is not stated
Covers: Campus plan (full expansion)
Operator: Core Scientific
Place: Muskogee, Oklahoma
Stage: Expanding
Stated: May 2026
“Core Scientific this week said it aims to expand the campus to 1.5GW of gross power, representing 1GW of leasable capacity.”
Announced capacity: 1,500 MW
What it measures: Announced capacity
Operator: Hampton Technology Park Owner
Place: Hampton, Georgia
Stage: Proposed
Stated: Not dated
Announced capacity: 1,500 MW
What it measures: Announced capacity
Operator: QTS
Place: Blakely, Georgia
Stage: In permitting
Stated: Not dated
33. Google Columbia County Data Center (White Oak Technology Park)
Announced capacity: 1,400 MW
What it measures: Announced capacity
Operator: Google
Place: Columbia County, Georgia
Stage: Approved
Stated: Not dated
Announced capacity: 1,400 MW
What it measures: Announced capacity
Operator: IREN
Place: Sweetwater, Texas
Stage: Under construction
Stated: Not dated
Announced capacity: 1,400 MW
What it measures: What it measures is not stated
Covers: Full campus
Operator: LM Core Energy Services
Place: Boone County, West Virginia
Stage: Announced
Stated: Not dated
“planned as a phased, large-scale artificial intelligence and high-performance computing campus encompassing roughly 3,557 acres, with about 1.4 gigawatts of anticipated full-campus electric demand”
36. Stargate Saline Township data center campus (The Barn)
Announced capacity: 1,400 MW
What it measures: Grid connection
Covers: DTE power supply agreement
Operator: Related Digital
Place: Washtenaw County, Michigan
Stage: Under construction
Stated: December 19, 2025
“the Michigan Public Service Commission voted 3-0 to conditionally approve DTE's 19-year, 1.4 GW, power supply agreement for a Stargate data center campus to be developed in Saline Township, Michigan”
37. Vantage Data Centers Shackelford County Campus (Shackelford County)
Announced capacity: 1,400 MW
What it measures: Announced capacity
Operator: Vantage Data Centers
Place: Shackelford County, Texas
Stage: Operating
Stated: Not dated
38. Vantage Frontier campus (Shackelford County)
Announced capacity: 1,400 MW
What it measures: Announced capacity
Operator: Vantage Data Centers
Place: Shackelford County, Texas
Stage: Under construction
Stated: Not dated
39. Pennsylvania Digital I (PAX-1)
Announced capacity: 1,350 MW
What it measures: Announced capacity
Operator: PowerHouse Data Centers
Place: Middlesex Township, Pennsylvania
Stage: Under construction
Stated: Not dated
40. Project Bunkhouse (Digital Realty Stilesboro Campus)
Announced capacity: 1,300 MW
What it measures: Announced capacity
Operator: Digital Realty
Place: Bartow County, Georgia
Stage: Under construction
Stated: Not dated
Announced capacity: 1,250 MW
What it measures: Announced capacity
Operator: Premier Data Center Development
Place: Irwin County, Georgia
Stage: Proposed
Stated: Not dated
42. Prometheus Falls Ranch (Casper)
Announced capacity: 1,250 MW
What it measures: What it measures is not stated
Covers: As announced June 2026
Operator: Prometheus Hyperscale
Place: Casper, Wyoming
Stage: Cancelled
Stated: June 17, 2026
“The Evanston campus is the first of multiple Prometheus Hyperscale sites in development, including Falls Ranch near Casper, Wyoming, designed for up to 1.25 GW in partnership with Casper Carbon Capture”
43. Stillwater Technology Park
Announced capacity: 1,250 MW
What it measures: Announced capacity
Operator: Stillwater Development
Place: Lovejoy, Georgia
Stage: Cancelled
Stated: Not dated
44. Tract South Valley Technology Park
Announced capacity: 1,215 MW
What it measures: What it measures is not stated
Covers: Full buildout (marketed)
Operator: Tract
Place: Storey County, Nevada
Stage: Announced
Stated: June 2, 2026
“Fleet's operations make it among the largest data center campuses in the state, and the company's expansive land position of 1,600 acres at South Valley is developable to a total of 1215MW.”
45. Fort Meade data center campus (Project Stonebridge)
Announced capacity: 1,200 MW
What it measures: Announced capacity
Operator: Stonebridge
Place: Fort Meade, Florida
Stage: Approved
Stated: Not dated
46. Lancium Clean Campus data centers (Crusoe)
Announced capacity: 1,200 MW
What it measures: Grid connection
Covers: Campus total
Operator: Crusoe
Place: Abilene, Texas
Stage: Under construction
Stated: March 18, 2025
Tax agreements on record: 6
“In addition to the 1.2 GW grid interconnection, Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources”
47. Nebius AI factory, Independence
Announced capacity: 1,200 MW
What it measures: What it measures is not stated
Covers: Full build-out
Operator: Nebius
Place: Independence, Missouri
Stage: Under construction
Stated: March 3, 2026
Tax agreements on record: 1
“The approval of the plan enables Nebius to proceed with the construction of the Independence AI factory, which has potential capacity of up to 1.2 GW.”
48. Project Marvel
Announced capacity: 1,200 MW
What it measures: Announced capacity
Operator: Logistics Land Investment
Place: Bessemer, Alabama
Stage: Approved
Stated: Not dated
Announced capacity: 1,200 MW
What it measures: What it measures is not stated
Covers: Both phases
Operator: Starwood Digital Ventures
Place: Delaware City, Delaware
Stage: Cancelled
Stated: Not dated
“Total energy will increase gradually over an 8-10 year period and is expected to total 1.2 GW for both phases combined.”
50. SB Energy Milam County data center (Stargate)
Announced capacity: 1,200 MW
What it measures: Announced capacity
Operator: SB Energy
Place: Milam County, Texas
Stage: Under construction
Stated: Not dated
| Rank | Project | Operator | Place | Stage | Announced capacity, as stated |
|---|---|---|---|---|---|
| 1 | Fermi Project Matador (Advanced Energy and Intelligence Campus) | Fermi America | Carson County, Texas | Under construction | 11,000 MWWhat it measures is not statedFull build (announced total)Stated June 26, 2025“Spanning 5,769 acres, the campus has the potential to deliver up to 11 gigawatts of power and 18 million square feet of artificial intelligence capacity.” |
| 2 | Creekstone Energy Delta Gigasite | Creekstone Energy | Delta, Utah | Under construction | 10,000 MWWhat it measures is not statedCampus at full buildStated April 9, 2026“with a capacity of 10 gigawatts” |
| 3 | Google Project Tembo | Crusoe | Laramie County, Wyoming | Under construction | 10,000 MWWhat it measures is not statedDesign scaleStated July 24, 2025“Designed to scale up to 10 gigawatts, this landmark project underscores Crusoe’s ability to rapidly build large-scale AI infrastructure projects” |
| 4 | Stratos Project | O'Leary Digital | Box Elder County, Utah | Approved | 9,000 MWAnnounced capacityStated date not stated |
| 5 | Monarch Compute Campus | Nscale | Point Pleasant, West Virginia | Under construction | 8,000 MWWhat it measures is not statedFull buildoutStated March 16, 2026“The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.” |
| 6 | PORTS-Pike Technology Campus | SB Energy | Pike County, Ohio | Announced | 8,000 MWIT loadFull build (announced total)Stated August 17, 2026“OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio” |
| 7 | Tombstone Resources Cochise Supercomputer Campus | Tombstone Resources | Cochise County, Arizona | In permitting | 6,000 MWGrid connectionFull build-out (applicant estimate)Stated October 30, 2026“a grid-served supercomputer / data-center campus built in four phases to up to nine (9) computing buildings, approx. 6 GW (6,000 MW) total electric demand at full build-out; Phase 1 approx. 1,500 MW” |
| 8 | Meta Richland Parish Data Center | Meta | Richland Parish, Louisiana | Under construction | 5,000 MWWhat it measures is not statedFull campus expansion (announced Jul 2026)Stated July 13, 2026“We're expanding our AI-optimized data center in Richland Parish, Louisiana to 5 GW in compute capacity” |
| 9 | Prometheus Hyperscale Evanston Campus | Prometheus Hyperscale | Evanston, Wyoming | Approved | 5,000 MWWhat it measures is not statedDevelopment pathStated June 17, 2026“The vote represents a significant permitting milestone for the 506-acre site, which is designed for 1.25 GW of initial capacity with a development path to 5 GW.” |
| 10 | Joule Capital Partners Data Center Campus | Joule | Holden, Utah | Under construction | 4,000 MWAnnounced capacityStated date not stated |
| 11 | OpenAI Project Camellia | OpenAI | Rincon, Georgia | In permitting | 3,200 MWAnnounced capacityStated date not stated |
| 12 | TECfusions Keystone Connect | TECfusions | Upper Burrell Township, Pennsylvania | Operating | 3,000 MWAnnounced capacityStated date not stated |
| 13 | Project Thunderbird data center and power corridor, Enid | Plainsmen Holdings | Enid, Oklahoma | In permitting | 2,750 MWIT loadFull corridorStated October 28, 2026“Up to 2.75 GW IT capacity” |
| 14 | Tract Virginia Highlands Technology Park | Tract | Storey County, Nevada | Announced | 2,500 MWWhat it measures is not statedMarketed potentialStated June 2, 2026“Fleet also holds 1,063 acres near Silver Springs that could be developed into 700MW, and its 8,590-acre holdings in Virginia City Highlands could bring another 2,500MW of computer capacity.” |
| 15 | Project Jupiter | Oracle | Santa Teresa, New Mexico | Under construction | 2,450 MWAnnounced capacityStated date not stated |
| 16 | Quantum Frederick | Quantum Loophole | Adamstown, Maryland | Under construction | 2,400 MWWhat it measures is not statedFull campusStated date not stated“Currently, 2.4 GW of power is under development with 17.4 million square feet of data centers entitled.” |
| 17 | Project Tamarack | Starwood Digital Ventures | Mason County, West Virginia | Announced | 2,160 MWWhat it measures is not statedStated September 3, 2026“Starwood plans to invest $12 billion in West Virginia, with the project requiring approximately 2.16 gigawatts of power and supporting approximately 1,500 jobs.” |
| 18 | Crusoe Abilene AI factory campus for Microsoft | Crusoe | Abilene, Texas | Under construction | 2,100 MWWhat it measures is not statedFull Abilene site at full buildout (both campuses)Stated March 27, 2026“The new campus is located adjacent to Crusoe's existing Abilene AI factory infrastructure, bringing the total projected capacity across the full Abilene site to 2.1 gigawatts (GW).” |
| 19 | Aligned Data Centers Project Phoenix Campus (Shippingport; groundbreaking announced on Aligned locations page (under construction)) | Aligned Data Centers | Shippingport, Pennsylvania | Under construction | 2,000 MWAnnounced capacityStated date not stated |
| 20 | Aligned Project Phoenix (Shippingport) | Aligned Data Centers | Shippingport, Pennsylvania | Under construction | 2,000 MWAnnounced capacityStated date not stated |
| 21 | Digital Realty data center campus, Astra Enterprise Park (De Soto) | Digital Realty | De Soto, Kansas | Approved | 2,000 MWGrid connectionFull deliveryStated June 22, 2026“To support development of the site, Digital Realty has entered into an Energy Service Agreement with the local utility to provide 600 megawatts of utility power by early 2028, rising to two gigawatts at full delivery.” |
| 22 | Microsoft Pecos data center campus | Microsoft | Pecos, Texas | Announced | 2,000 MWAnnounced capacityStated date not stated |
| 23 | Joliet Technology Center | PowerHouse Data Centers | Joliet, Illinois | Approved | 1,800 MWWhat it measures is not statedStated March 19, 2026“Development will be handled by data center firm PowerHouse Data Centers, and the campus will offer up to 1.8GW of capacity at completion.” |
| 24 | Paducah data center campus (DOE Paducah Site) | Brookfield | McCracken County, Kentucky | Proposed | 1,800 MWGrid connectionFull build-outStated July 29, 2026“Once fully constructed in 2032, the campus will support up to 1.8 gigawatts (GW) of utility capacity and over 1.2 GW of compute capacity, backed by up to 4.6 GW of dedicated generation resources paid for and built specifically for the project.” |
| 25 | Sagebrush and Stark Power Hallam campus | Stark Power | Hallam, Nebraska | Proposed | 1,700 MWAnnounced capacityStated date not stated |
| 26 | Galaxy Helios campus1 tax agreement on record | Galaxy | Dickens County, Texas | Expanding | 1,600 MWAnnounced capacityStated date not stated |
| 27 | T5@Chicago IV Grayslake Campus1 tax agreement on record | T5 | Grayslake, Illinois | Under construction | 1,600 MWGrid connectionStated October 14, 2025“With up to 1.2GW of IT capacity and 1.6GW of secured utility power, the CHI lV campus will provide the scalable, high-performance infrastructure required to support AI and commercial cloud deployments.” |
| 28 | Tract Silver Springs | Tract | Lyon County, Nevada | Approved | 1,600 MWWhat it measures is not statedFull siteStated September 17, 2025“The development site can support up to 1.6 gigawatts (GW) of data center capacity, with an initial 700 megawatts (MW) currently under utility study.” |
| 29 | Antelope Data Center | Pronghorn Development | Iron County, Utah | In permitting | 1,500 MWAnnounced capacityStated date not stated |
| 30 | Core Scientific data center campus, Muskogee (CoreWeave) | Core Scientific | Muskogee, Oklahoma | Expanding | 1,500 MWWhat it measures is not statedCampus plan (full expansion)Stated May 2026“Core Scientific this week said it aims to expand the campus to 1.5GW of gross power, representing 1GW of leasable capacity.” |
| 31 | Hampton Technology Park | Hampton Technology Park Owner | Hampton, Georgia | Proposed | 1,500 MWAnnounced capacityStated date not stated |
| 32 | QTS Blakely Campus | QTS | Blakely, Georgia | In permitting | 1,500 MWAnnounced capacityStated date not stated |
| 33 | Google Columbia County Data Center (White Oak Technology Park) | Columbia County, Georgia | Approved | 1,400 MWAnnounced capacityStated date not stated | |
| 34 | IREN Sweetwater 1 | IREN | Sweetwater, Texas | Under construction | 1,400 MWAnnounced capacityStated date not stated |
| 35 | Project Country Roads | LM Core Energy Services | Boone County, West Virginia | Announced | 1,400 MWWhat it measures is not statedFull campusStated date not stated“planned as a phased, large-scale artificial intelligence and high-performance computing campus encompassing roughly 3,557 acres, with about 1.4 gigawatts of anticipated full-campus electric demand” |
| 36 | Stargate Saline Township data center campus (The Barn) | Related Digital | Washtenaw County, Michigan | Under construction | 1,400 MWGrid connectionDTE power supply agreementStated December 19, 2025“the Michigan Public Service Commission voted 3-0 to conditionally approve DTE's 19-year, 1.4 GW, power supply agreement for a Stargate data center campus to be developed in Saline Township, Michigan” |
| 37 | Vantage Data Centers Shackelford County Campus (Shackelford County) | Vantage Data Centers | Shackelford County, Texas | Operating | 1,400 MWAnnounced capacityStated date not stated |
| 38 | Vantage Frontier campus (Shackelford County) | Vantage Data Centers | Shackelford County, Texas | Under construction | 1,400 MWAnnounced capacityStated date not stated |
| 39 | Pennsylvania Digital I (PAX-1) | PowerHouse Data Centers | Middlesex Township, Pennsylvania | Under construction | 1,350 MWAnnounced capacityStated date not stated |
| 40 | Project Bunkhouse (Digital Realty Stilesboro Campus) | Digital Realty | Bartow County, Georgia | Under construction | 1,300 MWAnnounced capacityStated date not stated |
| 41 | Project Arrowhead | Premier Data Center Development | Irwin County, Georgia | Proposed | 1,250 MWAnnounced capacityStated date not stated |
| 42 | Prometheus Falls Ranch (Casper) | Prometheus Hyperscale | Casper, Wyoming | Cancelled | 1,250 MWWhat it measures is not statedAs announced June 2026Stated June 17, 2026“The Evanston campus is the first of multiple Prometheus Hyperscale sites in development, including Falls Ranch near Casper, Wyoming, designed for up to 1.25 GW in partnership with Casper Carbon Capture” |
| 43 | Stillwater Technology Park | Stillwater Development | Lovejoy, Georgia | Cancelled | 1,250 MWAnnounced capacityStated date not stated |
| 44 | Tract South Valley Technology Park | Tract | Storey County, Nevada | Announced | 1,215 MWWhat it measures is not statedFull buildout (marketed)Stated June 2, 2026“Fleet's operations make it among the largest data center campuses in the state, and the company's expansive land position of 1,600 acres at South Valley is developable to a total of 1215MW.” |
| 45 | Fort Meade data center campus (Project Stonebridge) | Stonebridge | Fort Meade, Florida | Approved | 1,200 MWAnnounced capacityStated date not stated |
| 46 | Lancium Clean Campus data centers (Crusoe)6 tax agreements on record | Crusoe | Abilene, Texas | Under construction | 1,200 MWGrid connectionCampus totalStated March 18, 2025“In addition to the 1.2 GW grid interconnection, Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources” |
| 47 | Nebius AI factory, Independence1 tax agreement on record | Nebius | Independence, Missouri | Under construction | 1,200 MWWhat it measures is not statedFull build-outStated March 3, 2026“The approval of the plan enables Nebius to proceed with the construction of the Independence AI factory, which has potential capacity of up to 1.2 GW.” |
| 48 | Project Marvel | Logistics Land Investment | Bessemer, Alabama | Approved | 1,200 MWAnnounced capacityStated date not stated |
| 49 | Project Washington | Starwood Digital Ventures | Delaware City, Delaware | Cancelled | 1,200 MWWhat it measures is not statedBoth phasesStated date not stated“Total energy will increase gradually over an 8-10 year period and is expected to total 1.2 GW for both phases combined.” |
| 50 | SB Energy Milam County data center (Stargate) | SB Energy | Milam County, Texas | Under construction | 1,200 MWAnnounced capacityStated date not stated |
How to read this ranking
One figure per project. A project can hold several capacity figures in the record: one per phase, a restatement of the same phase, or a total for the whole campus. The ranking uses the largest single figure stated, so where a source states a campus total, that is the figure ranked. Phase figures are never added together, and every figure a project holds is listed on its project page.
Figures measure different things. Some state the IT load the building will carry, some state the grid connection the utility will build, and some do not say. Each row prints what its figure measures, as the record states it, so a grid connection figure and an IT load figure are not presented as the same quantity.
Backup generator figures are not ranked. A permit can state hundreds of megawatts of standby generators behind a site; that is generation held in reserve, not the load the data center draws. 119 projects in the record state only a generator figure and no announced capacity, so they do not appear here.
Announced is not built. These are plan figures, stated by the operator or developer announcing the project or in a filing, and the stage column shows where each project stands today. Projects are ranked the same way whatever their stage, and a cancelled project's figure stays in the ranking with its stage printed, because the announcement is part of the record.
The ranking lists the top 100 of the 529 projects that publish a figure, out of the 1320 projects we track. The rest publish no capacity figure in any record we have found.
Every figure is draft research: traced to the publisher's own release, filing, or testimony by an AI research agent and not yet through verification. Each receipt says so, and names the exact place in the document the figure comes from.
The other side of the same record
Capacity is one side of what these projects mean for the places they land in. The same public record holds the other side, and each project above has its own page carrying it: the tax agreements it signed, the jobs it committed to, and what officials and residents said about it. Of the 100 projects listed here, 10 hold at least one tax agreement on record and 7 carry an impact record covering property tax, tax breaks, electricity, water, jobs, community, neighbors, and voice. For the rest, we checked their tax agreements and impact records and hold none staged yet; that is stated here rather than left blank.
This page sits under What it means for locals. Its sibling pages keep the same kind of record: grid load growth by state for the load utilities say is coming, measured water use for the water figures operators publish, and residential electricity prices for what households actually paid. The generator figures this ranking leaves out are listed on on-site generation, permit by permit. Lists from the record ranks the largest stated tax breaks and counts the tracked projects by state and operator. The megawatts to homes calculator turns a figure on this page into household terms.
What the record shows · November 28, 2026
Loudoun County data centers: the complete record
Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.
Questions people ask
- What is the largest data center project by announced capacity?
- The largest single announced capacity figure in the record is 11,000 MW for Fermi Project Matador (Advanced Energy and Intelligence Campus) in Carson County, Texas, stated June 26, 2025. It is one figure stated for the project, covering full build (announced total), printed with its source on its row above. Announced capacity is a plan figure, not a measurement of a running site.
- How is a project's figure chosen when the record states several?
- Each project is ranked by the largest single figure stated for it. Where a source states a campus total, that figure is the project's figure, because it covers the phases under it. Phase figures are never added together to make a larger one, and restatements of the same phase do not stack. Every figure a project holds, phase by phase, is listed on its project page. Figures that measure only the backup generator fleet are not counted as announced capacity: they state how much generation stands behind the site, not the load the data center draws. 119 projects hold only a generator figure and no announced capacity, so they are not ranked here.
- Why is there no combined total?
- Because the figures overlap in time. A campus total announced this year covers phase figures announced in earlier years, and a restated figure replaces an older one rather than adding to it. Adding the figures on this page would count the same planned capacity several times over, so the page ranks each project's single largest stated figure and adds none of them together.
- Does every project publish a capacity figure?
- No. 529 of the 1320 projects we track publish an announced capacity figure in a record we have found. The other 791 publish none: their permits, agreements, and announcements state no figure, or state only a generator fleet figure. A project with no figure on this page is a project whose capacity the public record does not state, not a small project.
Sources
- 1Fermi America and the Texas Tech University System First to Answer President Trump's Call for Global Energy and AI Dominance
Fermi America (PR Newswire release on company site)Tier 4 · Open the source - 2Creekstone Energy Announces Plans to Develop Major Campus in Millard County, Utah
Utah Governor's Office of Economic Opportunity (published by EDCUtah)Tier 1 · Open the source - 3Crusoe and Tallgrass Announce AI Data Center in Wyoming
Crusoe (via GlobeNewswire)Tier 4 · Open the source - 4
- 5Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute
NscaleTier 4 · Open the source - 6
- 7Special Use Authorization Application SU26-22, Tombstone Resources L.L.C. (54 pages, with appendices)
Cochise County DocumentCenterTier 1 · Open the source - 8
- 9Prometheus Hyperscale Secures Unanimous Conditional Use Permit Approval from Uinta County Commissioners
Prometheus Hyperscale via PR NewswireTier 4 · Open the source - 10Joule, Caterpillar, and Wheeler Announce an Agreement to Power America's Growing Data Center Energy Needs
Caterpillar Inc.Tier 4 · Open the source - 11
- 12
- 13Project Thunderbird: A Proposed Power and Data Project for Enid, Oklahoma
Plainsmen Holdings (project site)Tier 4 · Open the source - 14Fleet Data Centers breaks ground on 2 facilities
Northern Nevada Business WeeklyTier 3 · Open the source - 15STACK Infrastructure Reinforces Responsible Development Principles through Project Jupiter in New Mexico
STACK Infrastructure via GlobeNewswireTier 4 · Open the source - 16
- 17Governor Morrisey Announces More Than $8.1 Billion in New Investment at West Virginia Business Summit
Office of the Governor of West VirginiaTier 1 · Open the source - 18Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure (2026-03-27)
CrusoeTier 4 · Open the source - 19Aligned Data Centers data center locations (operator’s own list)
Aligned Data CentersTier 2 · Open the source - 20Aligned Data Centers and Shippingport Community Mark Revitalization of Legacy Energy Site with Groundbreaking of 2 GW Project Phoenix Campus
Aligned Data CentersTier 4 · Open the source - 21Digital Realty Form 8-K Exhibit 99.1, press release (accession 0001193125-26-276844)
Digital Realty Trust, Inc. (SEC filing)Tier 1 · Open the source - 22Chevron Signs 20-Year Power Agreement with Microsoft for West Texas Data Center
Chevron CorporationTier 4 · Open the source - 23Approval given to $20bn data center near Chicago, Illinois
Data Center DynamicsTier 3 · Open the source - 24DOE Site in Western Kentucky Revitalized with Data Center Campus and Dedicated Energy Project
NextEra Energy, Inc. and coalition partners via PR NewswireTier 4 · Open the source - 25
- 26Galaxy Digital Form 8-K: Helios Campus ERCOT Approval for Additional 830 MW
Galaxy Digital Inc. (SEC Form 8-K)Tier 4 · Open the source - 27T5 plans five gigawatt-scale data center campuses, announces Chicago campus
Data Center DynamicsTier 3 · Open the source - 28Tract Expands Its Greater Reno Portfolio Closing on 1,060 Acres in Silver Springs, Nevada Following Successful Rezoning and Development Agreement with Lyon County
TractTier 4 · Open the source - 29Iron County Planning Commission agenda, March 5, 2026
Iron County (via Utah Public Meeting Notice)Tier 1 · Open the source - 30Core Scientific acquires cryptomine in Muskogee to expand AI data center campus
Data Center DynamicsTier 3 · Open the source - 31DRI #4624 Initial Information Form: Hampton Technology Park
Georgia Department of Community AffairsTier 1 · Open the source - 32DRI #4651 Initial Information Form: QTS - Blakely
Georgia Department of Community AffairsTier 1 · Open the source - 33Columbia County, Google and Georgia Power Partner to Protect Ratepayers and Make Growth Work for Residents
Columbia County, GeorgiaTier 1 · Open the source - 34IREN's 2GW Sweetwater Hub Included as Base Load in ERCOT Batch Zero
IREN Limited (GlobeNewswire)Tier 4 · Open the source - 35WV certified Boone County data center campus project without public announcement
West Virginia Press Association (Charleston Gazette-Mail reporting)Tier 3 · Open the source - 36
- 37Vantage Data Centers data center locations (operator’s own list)
Vantage Data CentersTier 2 · Open the source - 38Vantage Data Centers Unveils Plans for 'Frontier,' a $25B Mega-campus in Texas
Vantage Data Centers (press release, wire copy via Gulf Oil & Gas)Tier 4 · Open the source - 39Pennsylvania Data Center Partners and PowerHouse Data Centers Launch Joint Venture to Build Next-Gen 1.35 GW Hyperscale Data Center Campus in Carlisle, Pennsylvania
PowerHouse Data CentersTier 4 · Open the source - 40DRI #4433 Initial Information Form: Project Bunkhouse
Georgia Department of Community AffairsTier 1 · Open the source - 41DRI #4689 Initial Information Form: Project Arrowhead
Georgia Department of Community AffairsTier 1 · Open the source - 42DRI #4794 Initial Information Form: Stillwater Technology Park
Georgia Department of Community AffairsTier 1 · Open the source - 43Letter from Secretary J. Alex Kelly to Mayor Jaret Landon Williams, City of Fort Meade, April 15, 2026
Florida Department of CommerceTier 1 · Open the source - 44Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts
Crusoe (via GlobeNewswire, on Lancium's site)Tier 4 · Open the source - 45Nebius secures approval for its first gigawatt-scale AI factory
Nebius (Business Wire)Tier 4 · Open the source - 46Bessemer City Council approves rezoning for $14.5 billion data center project despite transparency concerns
WBRCTier 3 · Open the source - 47Decision and Final Order, CZICB Appeal No. 2026-01 (Starwood Digital Ventures)
Delaware Coastal Zone Industrial Control BoardTier 1 · Open the source - 48
Back to What it means for locals
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Largest projects by announced capacity." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/benefits/largest-projects