Largest projects by announced capacity
The biggest planned data centers in the record, ranked by how much power each one says it will draw. Every project is ranked by one figure: the largest single announced capacity stated for it, printed as its source states it. Big numbers gathers the record's other counts and records.
When a data center is announced, the announcement usually states how much power the site will draw, in megawatts. This page ranks the projects we track by the largest single figure stated for each one: the top 100 of the 529 projects that publish a figure, out of the 1320 we track. Each figure is printed exactly as its source states it, with what it measures, the date it was stated, and its source. The figures are never added together: a project announces phases and campus totals at different times, so adding its figures, or every project's, would count the same capacity more than once.
Announced capacity: 1,100 MW
What it measures: Announced capacity
Operator: Quantica Infrastructure
Place: Broadview, Montana
Stage: Proposed
Stated: Not dated
52. AVAIO Digital Leo data center and power campus, Pulaski County
Announced capacity: 1,070 MW
What it measures: What it measures is not stated
Covers: Campus design (current project page)
Operator: AVAIO Digital
Place: Little Rock, Arkansas
Stage: Under construction
Stated: November 8, 2026
“1,070 MW, Total Baseload Power”
53. Big Rock Data Center Project
Announced capacity: 1,000 MW
What it measures: Announced capacity
Operator: Apricus Energy Partners
Place: Spokane County, Washington
Stage: Proposed
Stated: Not dated
Announced capacity: 1,000 MW
What it measures: What it measures is not stated
Covers: Full buildout
Operator: TeraWulf
Place: Charles County, Maryland
Stage: Announced
Stated: August 5, 2026
“Subject to the remaining closing conditions and required approvals, the site could support an integrated generation, energy-storage and data center campus capable of scaling to up to 1 GW”
55. Copia Power Monarch Data Center
Announced capacity: 1,000 MW
What it measures: What it measures is not stated
Operator: Copia Power
Place: Lyon County, Nevada
Stage: Approved
Stated: July 14, 2026
“the Monarch Data Center, a 4.6 million square feet, 1,000 Megawatt (MW) data center consisting of 8, two-story buildings up to 95 feet tall, a 500-MW battery energy storage system, a 500-MW natural gas backup system, an electrical substation, high voltage power lines and other accessory uses”
56. COPT Defense Van Meter data center site
Announced capacity: 1,000 MW
What it measures: What it measures is not stated
Covers: Full site (company estimate)
Operator: COPT Defense
Place: Van Meter, Iowa
Stage: Announced
Stated: October 28, 2024
“initial plans indicate that the site can accommodate approximately 3.3 million square feet of development, supported by an estimated 1 gigawatt of power capacity”
Announced capacity: 1,000 MW
What it measures: Announced capacity
Operator: Hut 8
Place: Nueces County, Texas
Stage: Under construction
Stated: Not dated
58. Lancium Clean Campus - Childress 1
Announced capacity: 1,000 MW
What it measures: Announced capacity
Operator: Lancium
Place: Childress County, Texas
Stage: Announced
Stated: Not dated
Announced capacity: 1,000 MW
What it measures: Announced capacity
Operator: Meta
Place: El Paso, Texas
Stage: Under construction
Stated: Not dated
Tax agreements on record: 4
60. Meta Lebanon Data Center Campus
Announced capacity: 1,000 MW
What it measures: What it measures is not stated
Covers: Campus total (at completion)
Operator: Meta
Place: Lebanon, Indiana
Stage: Under construction
Stated: February 13, 2026
“The state-of-the-art campus will span approximately four million square feet and will deliver 1 gigawatt (GW) of capacity to support Meta's core business as well as artificial intelligence.”
61. Project Barracuda Energy Park and Technology Campus
Announced capacity: 1,000 MW
What it measures: IT load
Covers: Planning configuration
Operator: ONE Nuclear
Place: Louisiana
Stage: Announced
Stated: September 10, 2026
“Up to approximately 1 GW of critical IT datacenter capacity”
62. Savannah River Site AI data center and energy project
Announced capacity: 1,000 MW
What it measures: What it measures is not stated
Covers: Full project
Operator: DC BLOX
Place: Aiken County, South Carolina
Stage: Proposed
Stated: Not dated
“The project includes a 1-gigawatt data center and approximately 2-gigawatts of on-site energy generation consisting of natural gas bridging to nuclear energy.”
63. Texas Critical Data Centers (TCDC)
Announced capacity: 1,000 MW
What it measures: Announced capacity
Operator: Stream Data Centers
Place: Odessa, Texas
Stage: Announced
Stated: Not dated
64. Tract Altoona Technology Park
Announced capacity: 1,000 MW
What it measures: What it measures is not stated
Covers: Full buildout (planned)
Operator: Tract
Place: Altoona, Iowa
Stage: Announced
Stated: September 9, 2025
“capable of supporting over 1GW of capacity”
65. Amazon data center campus at Susquehanna (Cumulus)
Announced capacity: 960 MW
What it measures: Announced capacity
Operator: Amazon
Place: Salem Township, Pennsylvania
Stage: Expanding
Stated: Not dated
66. Riot Corsicana data center campus
Announced capacity: 910 MW
What it measures: Announced capacity
Operator: Riot
Place: Corsicana, Texas
Stage: Under construction
Stated: Not dated
67. Vantage Lighthouse campus (Stargate Port Washington)
Announced capacity: 902 MW
What it measures: IT load
Covers: Full campus
Operator: Vantage Data Centers
Place: Port Washington, Wisconsin
Stage: Under construction
Stated: December 22, 2025
“The campus will feature four data centers on 674 acres, delivering 902 MW of IT capacity.”
Announced capacity: 820 MW
What it measures: Announced capacity
Operator: The Tower Companies
Place: Landover, Maryland
Stage: Paused
Stated: Not dated
69. Tract Peru Shelf Technology Park
Announced capacity: 810 MW
What it measures: Grid connection
Covers: Full buildout
Operator: Tract
Place: Storey County, Nevada
Stage: Under construction
Stated: April 30, 2024
“Peru Shelf Technology Park is the first to break ground on 686 acres within the Tahoe-Reno Industrial Center and will support up to 810 MWs of utility capacity at full buildout.”
Announced capacity: 800 MW
What it measures: Announced capacity
Operator: Cologix
Place: Johnstown, Ohio
Stage: Under construction
Stated: Not dated
Tax agreements on record: 1
71. Cielo Hudson data center campus
Announced capacity: 750 MW
What it measures: Announced capacity
Operator: Cielo Digital Infrastructure
Place: Hudson, Colorado
Stage: Proposed
Stated: Not dated
Announced capacity: 750 MW
What it measures: Announced capacity
Operator: IREN
Place: Childress, Texas
Stage: Expanding
Stated: Not dated
73. QTS Phoenix 3 campus (Glendale)
Announced capacity: 750 MW
What it measures: Announced capacity
Operator: QTS
Place: Glendale, Arizona
Stage: Proposed
Stated: Not dated
74. Auburndale Technology Center
Announced capacity: 700 MW
What it measures: What it measures is not stated
Covers: Full development
Operator: Hillwood
Place: Auburndale, Florida
Stage: In permitting
Stated: Not dated
“At full development, the facility will use 700 megawatts (MW).”
75. Google data center campus, Project Mica (Kansas City)
Announced capacity: 700 MW
What it measures: What it measures is not stated
Covers: Full build-out
Operator: Google
Place: Kansas City, Missouri
Stage: Under construction
Stated: February 2026
“The full development will draw nearly 700 MW of power, supplied by the adjacent Nashua Power Station and onsite substations.”
76. Riot Rockdale data center campus
Announced capacity: 700 MW
What it measures: Announced capacity
Operator: Riot
Place: Rockdale, Texas
Stage: Expanding
Stated: Not dated
77. Switch Citadel Campus (TAHOE RENO)
Announced capacity: 650 MW
What it measures: What it measures is not stated
Covers: Campus total (design)
Operator: Switch
Place: Storey County, Nevada
Stage: Operating
Stated: February 15, 2017
Tax agreements on record: 2
“It is designed for up to 7.2 million square feet of data center space and up to 650 megawatts (MW) of power.”
78. CyrusOne Sangamon County Campus
Announced capacity: 636 MW
What it measures: What it measures is not stated
Operator: CyrusOne
Place: Sangamon County, Illinois
Stage: Approved
Stated: December 4, 2025
“The company is seeking zoning approval from the County Board to establish a 636-megawatt data center, the first in the county, on 280 acres of farm ground in Talkington Township”
79. NYDIG Massena East Data Center Campus
Announced capacity: 635 MW
What it measures: Announced capacity
Operator: NCCS
Place: Massena, New York
Stage: In permitting
Stated: Not dated
Announced capacity: 630 MW
What it measures: What it measures is not stated
Covers: Full campus (Bauxite I, II, III)
Operator: Rowan
Place: Adamstown, Maryland
Stage: Under construction
Stated: Not dated
“Bauxite is Rowan's flagship hyperscale campus in Maryland, delivering more than 630 MW of capacity for cloud and AI workloads in one of the most constrained power markets in the U.S.”
81. Bedington data center project
Announced capacity: 600 MW
What it measures: What it measures is not stated
Operator: Penzance
Place: Berkeley County, West Virginia
Stage: In permitting
Stated: Not dated
“The project, which will support at least 600 megawatts of artificial intelligence (AI) computing capacity, has been officially certified by the state.”
Announced capacity: 600 MW
What it measures: Announced capacity
Operator: Core Scientific
Place: Pecos, Texas
Stage: Expanding
Stated: Not dated
Announced capacity: 600 MW
What it measures: What it measures is not stated
Covers: Revised design
Operator: CRG
Place: Festus, Missouri
Stage: Approved
Stated: June 29, 2026
“The facility is designed for approximately 600 megawatts, which is approximately 40% smaller than CRG's original concept.”
Announced capacity: 600 MW
What it measures: Announced capacity
Operator: IREN
Place: Fisher County, Texas
Stage: Announced
Stated: Not dated
Announced capacity: 600 MW
What it measures: Announced capacity
Operator: 3 G Investments
Place: Richmond County, Georgia
Stage: Proposed
Stated: Not dated
86. Project Ruby
Announced capacity: 600 MW
What it measures: What it measures is not stated
Covers: Campus total (four buildings, as shown on the authority site map)
Operator: Habitat Real Estate Partners
Place: Columbus, Georgia
Stage: Proposed
Stated: December 1, 2025
“Four (4) 150MW Buildings”
87. Red Wolf DCD Properties data center campus (Kansas City, Kansas)
Announced capacity: 600 MW
What it measures: Announced capacity
Operator: Red Wolf DCD Properties
Place: Kansas City, Kansas
Stage: In permitting
Stated: Not dated
88. Skybox PowerCampus Austin (Hutto)
Announced capacity: 600 MW
What it measures: Announced capacity
Operator: Skybox
Place: Hutto, Texas
Stage: Under construction
Stated: Not dated
Tax agreements on record: 1
89. Stream Data Centers Project Double Reed at STAMP
Announced capacity: 600 MW
What it measures: Grid connection
Covers: STAMP site total, NYISO-cleared demand (all site users)
Operator: Stream Data Centers
Place: Alabama, New York
Stage: In permitting
Stated: June 4, 2026
“the STAMP site has been cleared by the New York Independent System Operator ("NYISO") for annual electrical demand at the site to a total of 600 MW of power”
90. TeraWulf Lake Mariner Data Center
Announced capacity: 600 MW
What it measures: IT load
Covers: Campus total planned critical IT
Operator: TeraWulf
Place: Barker, New York
Stage: Expanding
Stated: August 5, 2026
“Total Critical IT at Lake Mariner Data of 600 Critical MW includes 438 MW of contracted critical IT and 162 MW in the pipeline.”
91. CyrusOne CHI-11 West Yorkville Campus
Announced capacity: 540 MW
What it measures: Announced capacity
Operator: CyrusOne
Place: Yorkville, Illinois
Stage: Approved
Stated: Not dated
Tax agreements on record: 1
92. Google Goodnight campus (Armstrong County)
Announced capacity: 525.5 MW
What it measures: Grid connection
Covers: Load One and Load Two combined
Operator: Ensign Infrastructure
Place: Claude, Texas
Stage: Under construction
Stated: July 24, 2026
Tax agreements on record: 2
“Ensign and Crusoe contend that if the Crusoe Two Load (which is 260 MW) is also obligated to curtail, it would result in a total curtailment of 525.5 MW”
93. Compass Datacenters Meridian Campus
Announced capacity: 500 MW
What it measures: Grid connection
Covers: Full campus (eight buildings)
Operator: Compass Datacenters
Place: Meridian, Mississippi
Stage: Under construction
Stated: January 9, 2025
“Mississippi Power will supply approximately 500 megawatts of power to the facility.”
94. Gemini Capital Sioux Falls Data Center (proposed)
Announced capacity: 500 MW
What it measures: Announced capacity
Operator: Gemini Capital
Place: Sioux Falls, South Dakota
Stage: Proposed
Stated: Not dated
Announced capacity: 500 MW
What it measures: Grid connection
Covers: Full campus (potential increase)
Operator: PowerHouse Data Centers
Place: Charlotte, North Carolina
Stage: Announced
Stated: Not dated
“with the potential to increase to 500MW, of secured power by April 2027”
96. STACK Infrastructure DFW02 (Dallas-Fort Worth)
Announced capacity: 500 MW
What it measures: Announced capacity
Operator: STACK Infrastructure
Place: Lancaster, Texas
Stage: Operating
Stated: Not dated
97. Unnamed Data Center Project (Avista 500 MW MOU)
Announced capacity: 500 MW
What it measures: Announced capacity
Operator: Avista
Place: Spokane County, Washington
Stage: Paused
Stated: Not dated
98. Switch Las Vegas Core Campus
Announced capacity: 495 MW
What it measures: What it measures is not stated
Covers: Full buildout (company claim)
Operator: Switch
Place: Las Vegas, Nevada
Stage: Expanding
Stated: March 2026
“Its Core Campus, located in Las Vegas, Nevada, will have up to 495MW of power upon full build-out.”
99. Switch Switch LAS VEGAS (Las Vegas)
Announced capacity: 495 MW
What it measures: Announced capacity
Operator: Switch
Place: Las Vegas, Nevada
Stage: Operating
Stated: Not dated
Announced capacity: 480 MW
What it measures: Announced capacity
Operator: DataBank
Place: Red Oak, Texas
Stage: Under construction
Stated: Not dated
| Rank | Project | Operator | Place | Stage | Announced capacity, as stated |
|---|---|---|---|---|---|
| 51 | Quantica Big Sky Campus | Quantica Infrastructure | Broadview, Montana | Proposed | 1,100 MWAnnounced capacityStated date not stated |
| 52 | AVAIO Digital Leo data center and power campus, Pulaski County | AVAIO Digital | Little Rock, Arkansas | Under construction | 1,070 MWWhat it measures is not statedCampus design (current project page)Stated November 8, 2026“1,070 MW, Total Baseload Power” |
| 53 | Big Rock Data Center Project | Apricus Energy Partners | Spokane County, Washington | Proposed | 1,000 MWAnnounced capacityStated date not stated |
| 54 | Chesapeake Data Campus | TeraWulf | Charles County, Maryland | Announced | 1,000 MWWhat it measures is not statedFull buildoutStated August 5, 2026“Subject to the remaining closing conditions and required approvals, the site could support an integrated generation, energy-storage and data center campus capable of scaling to up to 1 GW” |
| 55 | Copia Power Monarch Data Center | Copia Power | Lyon County, Nevada | Approved | 1,000 MWWhat it measures is not statedStated July 14, 2026“the Monarch Data Center, a 4.6 million square feet, 1,000 Megawatt (MW) data center consisting of 8, two-story buildings up to 95 feet tall, a 500-MW battery energy storage system, a 500-MW natural gas backup system, an electrical substation, high voltage power lines and other accessory uses” |
| 56 | COPT Defense Van Meter data center site | COPT Defense | Van Meter, Iowa | Announced | 1,000 MWWhat it measures is not statedFull site (company estimate)Stated October 28, 2024“initial plans indicate that the site can accommodate approximately 3.3 million square feet of development, supported by an estimated 1 gigawatt of power capacity” |
| 57 | Hut 8 Beacon Point | Hut 8 | Nueces County, Texas | Under construction | 1,000 MWAnnounced capacityStated date not stated |
| 58 | Lancium Clean Campus - Childress 1 | Lancium | Childress County, Texas | Announced | 1,000 MWAnnounced capacityStated date not stated |
| 59 | Meta El Paso data center4 tax agreements on record | Meta | El Paso, Texas | Under construction | 1,000 MWAnnounced capacityStated date not stated |
| 60 | Meta Lebanon Data Center Campus | Meta | Lebanon, Indiana | Under construction | 1,000 MWWhat it measures is not statedCampus total (at completion)Stated February 13, 2026“The state-of-the-art campus will span approximately four million square feet and will deliver 1 gigawatt (GW) of capacity to support Meta's core business as well as artificial intelligence.” |
| 61 | Project Barracuda Energy Park and Technology Campus | ONE Nuclear | Louisiana | Announced | 1,000 MWIT loadPlanning configurationStated September 10, 2026“Up to approximately 1 GW of critical IT datacenter capacity” |
| 62 | Savannah River Site AI data center and energy project | DC BLOX | Aiken County, South Carolina | Proposed | 1,000 MWWhat it measures is not statedFull projectStated date not stated“The project includes a 1-gigawatt data center and approximately 2-gigawatts of on-site energy generation consisting of natural gas bridging to nuclear energy.” |
| 63 | Texas Critical Data Centers (TCDC) | Stream Data Centers | Odessa, Texas | Announced | 1,000 MWAnnounced capacityStated date not stated |
| 64 | Tract Altoona Technology Park | Tract | Altoona, Iowa | Announced | 1,000 MWWhat it measures is not statedFull buildout (planned)Stated September 9, 2025“capable of supporting over 1GW of capacity” |
| 65 | Amazon data center campus at Susquehanna (Cumulus) | Amazon | Salem Township, Pennsylvania | Expanding | 960 MWAnnounced capacityStated date not stated |
| 66 | Riot Corsicana data center campus | Riot | Corsicana, Texas | Under construction | 910 MWAnnounced capacityStated date not stated |
| 67 | Vantage Lighthouse campus (Stargate Port Washington) | Vantage Data Centers | Port Washington, Wisconsin | Under construction | 902 MWIT loadFull campusStated December 22, 2025“The campus will feature four data centers on 674 acres, delivering 902 MW of IT capacity.” |
| 68 | Brightseat Tech Park | The Tower Companies | Landover, Maryland | Paused | 820 MWAnnounced capacityStated date not stated |
| 69 | Tract Peru Shelf Technology Park | Tract | Storey County, Nevada | Under construction | 810 MWGrid connectionFull buildoutStated April 30, 2024“Peru Shelf Technology Park is the first to break ground on 686 acres within the Tahoe-Reno Industrial Center and will support up to 810 MWs of utility capacity at full buildout.” |
| 70 | Cologix Johnstown campus1 tax agreement on record | Cologix | Johnstown, Ohio | Under construction | 800 MWAnnounced capacityStated date not stated |
| 71 | Cielo Hudson data center campus | Cielo Digital Infrastructure | Hudson, Colorado | Proposed | 750 MWAnnounced capacityStated date not stated |
| 72 | IREN Childress campus | IREN | Childress, Texas | Expanding | 750 MWAnnounced capacityStated date not stated |
| 73 | QTS Phoenix 3 campus (Glendale) | QTS | Glendale, Arizona | Proposed | 750 MWAnnounced capacityStated date not stated |
| 74 | Auburndale Technology Center | Hillwood | Auburndale, Florida | In permitting | 700 MWWhat it measures is not statedFull developmentStated date not stated“At full development, the facility will use 700 megawatts (MW).” |
| 75 | Google data center campus, Project Mica (Kansas City) | Kansas City, Missouri | Under construction | 700 MWWhat it measures is not statedFull build-outStated February 2026“The full development will draw nearly 700 MW of power, supplied by the adjacent Nashua Power Station and onsite substations.” | |
| 76 | Riot Rockdale data center campus | Riot | Rockdale, Texas | Expanding | 700 MWAnnounced capacityStated date not stated |
| 77 | Switch Citadel Campus (TAHOE RENO)2 tax agreements on record | Switch | Storey County, Nevada | Operating | 650 MWWhat it measures is not statedCampus total (design)Stated February 15, 2017“It is designed for up to 7.2 million square feet of data center space and up to 650 megawatts (MW) of power.” |
| 78 | CyrusOne Sangamon County Campus | CyrusOne | Sangamon County, Illinois | Approved | 636 MWWhat it measures is not statedStated December 4, 2025“The company is seeking zoning approval from the County Board to establish a 636-megawatt data center, the first in the county, on 280 acres of farm ground in Talkington Township” |
| 79 | NYDIG Massena East Data Center Campus | NCCS | Massena, New York | In permitting | 635 MWAnnounced capacityStated date not stated |
| 80 | Rowan Bauxite campus | Rowan | Adamstown, Maryland | Under construction | 630 MWWhat it measures is not statedFull campus (Bauxite I, II, III)Stated date not stated“Bauxite is Rowan's flagship hyperscale campus in Maryland, delivering more than 630 MW of capacity for cloud and AI workloads in one of the most constrained power markets in the U.S.” |
| 81 | Bedington data center project | Penzance | Berkeley County, West Virginia | In permitting | 600 MWWhat it measures is not statedStated date not stated“The project, which will support at least 600 megawatts of artificial intelligence (AI) computing capacity, has been officially certified by the state.” |
| 82 | Core Scientific Pecos | Core Scientific | Pecos, Texas | Expanding | 600 MWAnnounced capacityStated date not stated |
| 83 | CRG data center, Festus | CRG | Festus, Missouri | Approved | 600 MWWhat it measures is not statedRevised designStated June 29, 2026“The facility is designed for approximately 600 megawatts, which is approximately 40% smaller than CRG's original concept.” |
| 84 | IREN Sweetwater 2 | IREN | Fisher County, Texas | Announced | 600 MWAnnounced capacityStated date not stated |
| 85 | Nixon Technology Center | 3 G Investments | Richmond County, Georgia | Proposed | 600 MWAnnounced capacityStated date not stated |
| 86 | Project Ruby | Habitat Real Estate Partners | Columbus, Georgia | Proposed | 600 MWWhat it measures is not statedCampus total (four buildings, as shown on the authority site map)Stated December 1, 2025“Four (4) 150MW Buildings” |
| 87 | Red Wolf DCD Properties data center campus (Kansas City, Kansas) | Red Wolf DCD Properties | Kansas City, Kansas | In permitting | 600 MWAnnounced capacityStated date not stated |
| 88 | Skybox PowerCampus Austin (Hutto)1 tax agreement on record | Skybox | Hutto, Texas | Under construction | 600 MWAnnounced capacityStated date not stated |
| 89 | Stream Data Centers Project Double Reed at STAMP | Stream Data Centers | Alabama, New York | In permitting | 600 MWGrid connectionSTAMP site total, NYISO-cleared demand (all site users)Stated June 4, 2026“the STAMP site has been cleared by the New York Independent System Operator ("NYISO") for annual electrical demand at the site to a total of 600 MW of power” |
| 90 | TeraWulf Lake Mariner Data Center | TeraWulf | Barker, New York | Expanding | 600 MWIT loadCampus total planned critical ITStated August 5, 2026“Total Critical IT at Lake Mariner Data of 600 Critical MW includes 438 MW of contracted critical IT and 162 MW in the pipeline.” |
| 91 | CyrusOne CHI-11 West Yorkville Campus1 tax agreement on record | CyrusOne | Yorkville, Illinois | Approved | 540 MWAnnounced capacityStated date not stated |
| 92 | Google Goodnight campus (Armstrong County)2 tax agreements on record | Ensign Infrastructure | Claude, Texas | Under construction | 525.5 MWGrid connectionLoad One and Load Two combinedStated July 24, 2026“Ensign and Crusoe contend that if the Crusoe Two Load (which is 260 MW) is also obligated to curtail, it would result in a total curtailment of 525.5 MW” |
| 93 | Compass Datacenters Meridian Campus | Compass Datacenters | Meridian, Mississippi | Under construction | 500 MWGrid connectionFull campus (eight buildings)Stated January 9, 2025“Mississippi Power will supply approximately 500 megawatts of power to the facility.” |
| 94 | Gemini Capital Sioux Falls Data Center (proposed) | Gemini Capital | Sioux Falls, South Dakota | Proposed | 500 MWAnnounced capacityStated date not stated |
| 95 | PowerHouse Charlotte | PowerHouse Data Centers | Charlotte, North Carolina | Announced | 500 MWGrid connectionFull campus (potential increase)Stated date not stated“with the potential to increase to 500MW, of secured power by April 2027” |
| 96 | STACK Infrastructure DFW02 (Dallas-Fort Worth) | STACK Infrastructure | Lancaster, Texas | Operating | 500 MWAnnounced capacityStated date not stated |
| 97 | Unnamed Data Center Project (Avista 500 MW MOU) | Avista | Spokane County, Washington | Paused | 500 MWAnnounced capacityStated date not stated |
| 98 | Switch Las Vegas Core Campus | Switch | Las Vegas, Nevada | Expanding | 495 MWWhat it measures is not statedFull buildout (company claim)Stated March 2026“Its Core Campus, located in Las Vegas, Nevada, will have up to 495MW of power upon full build-out.” |
| 99 | Switch Switch LAS VEGAS (Las Vegas) | Switch | Las Vegas, Nevada | Operating | 495 MWAnnounced capacityStated date not stated |
| 100 | DataBank Red Oak campus | DataBank | Red Oak, Texas | Under construction | 480 MWAnnounced capacityStated date not stated |
How to read this ranking
One figure per project. A project can hold several capacity figures in the record: one per phase, a restatement of the same phase, or a total for the whole campus. The ranking uses the largest single figure stated, so where a source states a campus total, that is the figure ranked. Phase figures are never added together, and every figure a project holds is listed on its project page.
Figures measure different things. Some state the IT load the building will carry, some state the grid connection the utility will build, and some do not say. Each row prints what its figure measures, as the record states it, so a grid connection figure and an IT load figure are not presented as the same quantity.
Backup generator figures are not ranked. A permit can state hundreds of megawatts of standby generators behind a site; that is generation held in reserve, not the load the data center draws. 119 projects in the record state only a generator figure and no announced capacity, so they do not appear here.
Announced is not built. These are plan figures, stated by the operator or developer announcing the project or in a filing, and the stage column shows where each project stands today. Projects are ranked the same way whatever their stage, and a cancelled project's figure stays in the ranking with its stage printed, because the announcement is part of the record.
The ranking lists the top 100 of the 529 projects that publish a figure, out of the 1320 projects we track. The rest publish no capacity figure in any record we have found.
Every figure is draft research: traced to the publisher's own release, filing, or testimony by an AI research agent and not yet through verification. Each receipt says so, and names the exact place in the document the figure comes from.
The other side of the same record
Capacity is one side of what these projects mean for the places they land in. The same public record holds the other side, and each project above has its own page carrying it: the tax agreements it signed, the jobs it committed to, and what officials and residents said about it. Of the 100 projects listed here, 10 hold at least one tax agreement on record and 7 carry an impact record covering property tax, tax breaks, electricity, water, jobs, community, neighbors, and voice. For the rest, we checked their tax agreements and impact records and hold none staged yet; that is stated here rather than left blank.
This page sits under What it means for locals. Its sibling pages keep the same kind of record: grid load growth by state for the load utilities say is coming, measured water use for the water figures operators publish, and residential electricity prices for what households actually paid. The generator figures this ranking leaves out are listed on on-site generation, permit by permit. Lists from the record ranks the largest stated tax breaks and counts the tracked projects by state and operator. The megawatts to homes calculator turns a figure on this page into household terms.
What the record shows · November 28, 2026
Loudoun County data centers: the complete record
Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.
Questions people ask
- What is the largest data center project by announced capacity?
- The largest single announced capacity figure in the record is 11,000 MW for Fermi Project Matador (Advanced Energy and Intelligence Campus) in Carson County, Texas, stated June 26, 2025. It is one figure stated for the project, covering full build (announced total), printed with its source on its row above. Announced capacity is a plan figure, not a measurement of a running site.
- How is a project's figure chosen when the record states several?
- Each project is ranked by the largest single figure stated for it. Where a source states a campus total, that figure is the project's figure, because it covers the phases under it. Phase figures are never added together to make a larger one, and restatements of the same phase do not stack. Every figure a project holds, phase by phase, is listed on its project page. Figures that measure only the backup generator fleet are not counted as announced capacity: they state how much generation stands behind the site, not the load the data center draws. 119 projects hold only a generator figure and no announced capacity, so they are not ranked here.
- Why is there no combined total?
- Because the figures overlap in time. A campus total announced this year covers phase figures announced in earlier years, and a restated figure replaces an older one rather than adding to it. Adding the figures on this page would count the same planned capacity several times over, so the page ranks each project's single largest stated figure and adds none of them together.
- Does every project publish a capacity figure?
- No. 529 of the 1320 projects we track publish an announced capacity figure in a record we have found. The other 791 publish none: their permits, agreements, and announcements state no figure, or state only a generator fleet figure. A project with no figure on this page is a project whose capacity the public record does not state, not a small project.
Sources
- 1NorthWestern Energy Reports 2025 Financial Results (Form 8-K Exhibit 99.1)
NorthWestern Energy Group, Inc.Tier 1 · Open the source - 2
- 3Board Briefing Session Agenda, August 18, 2026: Data Center Zoning (draft Chapter 14.840)
Spokane County Board of County CommissionersTier 1 · Open the source - 4
- 5Lyon County Planning Commission agenda, July 14, 2026 (Monarch Data Center agenda summary, item PLZ-2026-041)
Lyon CountyTier 1 · Open the source - 6COPT Defense Properties data center shell land acquisition near Des Moines (Business Wire release)
COPT Defense PropertiesTier 4 · Open the source - 7
- 8Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas
Lancium (GlobeNewswire)Tier 4 · Open the source - 9
- 10Turner selected as one of the contractors for $10 billion Meta data center campus in Indiana
Turner Construction Company (via HOCHTIEF)Tier 4 · Open the source - 11ONE Nuclear Launches 5 GW Louisiana Portfolio of Energy Projects Comprising Nuclear, Natural Gas and Battery Storage
ONE Nuclear Energy (Business Wire)Tier 4 · Open the source - 12NNSA Selects Amentum for AI Data Center and Energy Project at Savannah River Site
National Nuclear Security Administration, U.S. Department of EnergyTier 1 · Open the source - 13New Era Energy & Digital Partners with Stream Data Centers for Flagship TCDC Campus
New Era Energy & Digital, Inc.Tier 2 · Open the source - 14Tract enters the Des Moines market with acquisition of 453 acres after successful collaboration with City of Altoona, IA
TractTier 4 · Open the source - 15Talen Energy Announces Receipt of Escrowed Funds for Cumulus Data Center Campus Transaction (GlobeNewswire release)
Talen Energy CorporationTier 4 · Open the source - 16Riot Platforms Reports Third Quarter 2026 Financial Results and Strategic Highlights
Riot Platforms, Inc. (GlobeNewswire release, wire copy)Tier 4 · Open the source - 17Vantage Breaks Ground on $15B Stargate Campus in Wisconsin
Data Center KnowledgeTier 3 · Open the source - 18Preliminary Plan of Subdivision 4-23024, Brightseat Tech Park, Technical Staff Report
Maryland-National Capital Park and Planning Commission, Prince George's County Planning DepartmentTier 1 · Open the source - 19Tract Breaks Ground on Peru Shelf Technology Park in Storey County, Nevada
Tract (via GlobeNewswire)Tier 4 · Open the source - 20Cologix Expands Central Ohio Footprint With Land Acquisition For New AI-Ready 800MW Data Center Campus
CologixTier 4 · Open the source - 21Lochbuie approves five-year data center moratorium, making it the longest active pause in Colorado
Rocky Mountain PBSTier 3 · Open the source - 22IREN Secures $9.7bn AI Cloud Contract with Microsoft
IREN Limited (GlobeNewswire release)Tier 4 · Open the source - 23
- 24Auburndale Technology Center project website and FAQ
Auburndale Technology Center (Hillwood Development Company)Tier 4 · Open the source - 25
- 26Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World
SwitchTier 4 · Open the source - 27
- 28
- 29Rowan Digital Infrastructure (homepage, Bauxite portfolio entry)
Rowan Digital InfrastructureTier 4 · Open the source - 30
- 31Core Scientific Form 8-K: Texas Data Center Power Status Update
Core Scientific, Inc. (SEC Form 8-K)Tier 4 · Open the source - 32
- 33IREN's 2GW Sweetwater Hub Included as Base Load in ERCOT Batch Zero
IREN Limited (GlobeNewswire)Tier 4 · Open the source - 34DRI #4853 Initial Information Form: Nixon Technology Center
Georgia Department of Community AffairsTier 1 · Open the source - 35Project Ruby Data Center Site, Muscogee County, Georgia (site map)
Choose Columbus / Development Authority of ColumbusTier 2 · Open the source - 36
- 37
- 38STAMP Data Center: Energy Matters (memorandum to GCEDC)
Genesee County Economic Development CenterTier 1 · Open the source - 39
- 40
- 41Order, Docket No. 59220: Application of Crusoe Energy Systems LLC, FGE Goodnight I, LLC and Ensign Infrastructure LLC for Approval of a Net Metering Arrangement
Public Utility Commission of TexasTier 1 · Open the source - 42Compass Datacenters project generates $10 billion investment in Lauderdale County
Office of Governor Tate ReevesTier 1 · Open the source - 43Data centers in Sioux Falls, and how to have your say
Rising Together Sioux Falls (summarizing City of Sioux Falls actions and Argus Leader reporting)Tier 3 · Open the source - 44Town Lane and PowerHouse Data Centers JV acquires future data center land site in Charlotte, NC
PowerHouse Data Centers and Town LaneTier 4 · Open the source - 45STACK Infrastructure data center locations (operator’s own list)
STACK InfrastructureTier 2 · Open the source - 46Draft Resolution (ZTA 8-14 packet): pause on acceptance of land use and permit applications for data centers
Spokane County Board of County CommissionersTier 1 · Open the source - 47Switch buys more land at industrial park outside Las Vegas
Data Center DynamicsTier 3 · Open the source - 48
- 49
Back to What it means for locals