Data Center Fact Check tracks 5 data center projects in Adamstown, Maryland as of November 2026: 4 under construction and 1 operating, totaling about 3,294 MW announced where a figure is published.
Adamstown has 5 tracked data centers. Their announced capacity totals about 3,294 MW where a figure is published. Of those, 4 under construction and 1 operating. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Adamstown
- Aligned Data Centers IAD-04 (Frederick)
OperatingAdamstown
- Aligned Frederick campus
Under constructionAdamstown264 MW announced
- Amazon Data Services Frederick campus
Under constructionAdamstown
- Quantum Frederick
Under constructionAdamstown2,400 MW announced
- Rowan Bauxite campus
Under constructionAdamstown630 MW announced
Who serves this place
- Not collected yet.
Bills and laws in Maryland
- HB 1534 · Died or failedSets operating and siting standards for data centers
- HB 120 · Died or failedBans new data centers until co-location is required
- SB 116 · Veto overridden · Dec 16, 2025Requires a state study of data center impacts
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Adamstown?
- Data Center Fact Check tracks 5 data center projects in Adamstown as of November 2026. Of those, 4 under construction and 1 operating.
- What is the biggest data center in Adamstown?
- By announced capacity, the biggest data center in Adamstown is Quantum Frederick, announced at 2,400 MW. It is under construction.
- How much power do data centers in Adamstown use?
- The 5 projects tracked in Adamstown have announced about 3,294 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Adamstown." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-md-adamstown
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page