Amazon Data Services Frederick campus

Adamstown,Frederick County,MarylandUnder constructionFirst public 2024Filing entity: Amazon Data Services, Inc.Last checked Nov 8, 2026

AmazonDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Amazon Data Services Frederick campus is a under-construction data center project in Adamstown, Frederick County, Maryland. Amazon is named as operator. It was first public in 2024. No site capacity figure is published for this project.

Amazon Data Services Frederick campus is an under-construction data center project in Adamstown, Frederick County, Maryland. Amazon is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Adamstown, Frederick County, Maryland. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

0Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

County outline onlyExact site not confirmed yet. The outline shows Frederick County, Maryland.See every project on the map

Timeline

  1. · New projectFirst public record of Amazon Data Services Frederick campusUnder construction

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Maryland SB 116: Requires a state study of data center impacts

    The act covers data center development in Maryland, whose environmental, energy, and economic impacts state agencies must analyze; this project has 257.75 MW on record (generator capacity), but any project-level condition; the act directs state agencies to conduct a study and sets no size, date, or facility condition a project record could establish is not on record.

    “Requiring the Department of the Environment, the Maryland Energy Administration, and the University of Maryland School of Business, in coordination with the Department of Legislative Services, to conduct an analysis of the likely environmental, energy, and economic impacts of data center development in the State” (mgaleg SB 116 page, Synopsis)

    Rule checks: Project is in Maryland. Still to check: who it covers: not checked

Bills and laws in Maryland

Open Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 257.75 MW · Mar 2026 · generator_capacity

Public records

0 records found so far. 9 kinds of record are still being collected.

    See every record

    Questions people ask

    Where is Amazon Data Services Frederick campus?
    Amazon Data Services Frederick campus is a data center project in Adamstown, Frederick County, Maryland.
    Who operates Amazon Data Services Frederick campus?
    Amazon is named as the operator of Amazon Data Services Frederick campus.
    What stage is Amazon Data Services Frederick campus?
    Amazon Data Services Frederick campus is under construction. It was first public in 2024.

    Sources

    Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

    1. 1
      Final Determination Concerning a Permit-to-Construct Application Submitted by Amazon Data Services, Inc. for their Proposed Frederick, Maryland Data Center Campus
      Maryland Department of the Environment, Air and Radiation Administration
      Tier 1 · Captured 2026-11-08 · Open the source
    2. 2
      Frederick Data Center Sampling/Reports
      Maryland Department of the Environment
      Tier 1 · Captured 2026-11-08 · Open the source

    No corrections have been published for this page. Corrections log · Report an error or send a tip on this page