What the record shows
Loudoun County data centers: the complete record
Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.
By Bear Harper · Published November 28, 2026
Loudoun County holds 128 data center projects in this site's record, 93 of them operating, more than any other county tracked. In fiscal 2024 their computer equipment paid $684,787,341 in county personal property tax at the county's general rate of $4.15 per $100 of assessed value, and the county counts data centers as 38 percent of its general fund revenue. The record holds no county abatement and no county rate break for data centers.
Loudoun County, Virginia, holds 128 data center projects in this site's record, and in fiscal 2024 their computer equipment paid $684,787,341 in county tax at the full general rate. No county discount and no county abatement appear in the record. In the presentation the county published with its fiscal 2026 proposed budget, data centers account for 38 percent of general fund revenue.
This page is the county's whole record in one place. What is here. What it pays. What residents got in the same books. What the industry uses, as far as the record goes. And what the record does not show. Each part links to the project pages and the deeper pieces behind it.
What is here: 128 projects, counted one site at a time
This site counts a project as one site or campus, however many buildings the campus holds. The 128 Loudoun projects by stage, from the staged record checked on November 28, 2026:
| Stage | Projects |
|---|---|
| Operating | 93 |
| Under construction | 1 |
| Expanding | 2 |
| In permitting | 1 |
| Proposed | 5 |
| Stage not established in the record | 26 |
| Total | 128 |
Virginia holds 231 tracked projects. Loudoun's 128 are 55 percent of the state total, inside a dataset of 1,320 projects. The full list, project by project, is on Loudoun County's page on this site.
Fifteen of the 128 projects publish an announced capacity. Together they total 1,180.9 MW. Treat that figure as a floor. The other 113 projects, 81 of the operating ones among them, carry no announced capacity in the record, so no county total exists to print.
| Project | Stage | Announced capacity |
|---|---|---|
| Vantage Data Centers Ashburn I campus | Operating | 206 MW |
| Aligned Data Centers Ashburn | Operating | 180 MW |
| STACK Infrastructure Loudoun County campus | Under construction | 144 MW |
| Cologix ASH1 | Operating | 120 MW |
| Yondr Northern Virginia campus (Aldie) | Expanding | 96 MW |
| Sabey Intergate.Ashburn | Expanding | 85 MW |
| QTS Ashburn 3 (Shellhorn Road) | Operating | 80 MW |
| QTS Ashburn 2 (Lockridge) | Operating | 75 MW |
| Aligned Data Centers Sterling | Operating | 72 MW |
| DataBank IAD3 | Operating | 40 MW |
| QTS Ashburn | Operating | 32 MW |
| DataBank IAD4 | Operating | 20 MW |
| STACK Infrastructure NVA01 | Operating | 17 MW |
| DataBank IAD1 | Operating | 9.9 MW |
| QTS Ashburn-Moran | Operating | 4 MW |
One measure in the record looks like capacity and is a different thing. Virginia air permits state the size of each campus's backup generator fleet, and those fleets run to hundreds of megawatts at the largest sites. Generator fleet size measures backup equipment a permit authorizes. It is not the building's power capacity, and this site never adds the two together.
One campus inside the total: QTS Ashburn, operating in Sterling at an announced 32 MW. The video below walks the site from the air and through the public record behind it.
QTS Ashburn video · 2 min 18 sec
A second campus with a full public record on this site is the Google Arcola Center, one of the 93 operating projects in the table above.
What it pays: $684.8 million in fiscal 2024, at the full rate
The $684,787,341 is one line in the county's General Fund revenue chapter: personal property tax on data center computer equipment. It counts the servers and the gear around them. It does not count real property tax on the buildings and the land under them. The county's budget documents publish no separate dollar line for data center real property tax.
Three years of the equipment line are actuals, money the county reports as collected. The three figures after them are budget numbers, adopted or proposed, labeled that way every time:
| Fiscal year | Equipment tax | Status of the figure |
|---|---|---|
| 2022 | $466,183,383 | Actual |
| 2023 | $581,550,433 | Actual |
| 2024 | $684,787,341 | Actual |
| 2025 | $670,259,142 | Adopted |
| 2026 | $794,780,452 | Adopted |
| 2027 | $879,094,354 | Proposed |
Across the two steps from fiscal 2022 to fiscal 2024, the actual line rose 47 percent. The county's total General Fund property tax revenue rose over the same span, from $1.69 billion to $2.13 billion. The equipment line grew faster than the tax base it sits inside.
One wrinkle sits in the county's own book, and it shows what these labels mean. The fiscal 2026 proposed budget prints the fiscal 2025 figure as adopted, $670.3 million, below the fiscal 2024 actual printed in the same chapter. A budget figure is a decision made before the year it covers. An actual is what arrived. The $879.1 million for fiscal 2027 is a proposal until the county adopts it.
The county's own composition chart, published with the fiscal 2026 proposed budget, gives the wider split in shares. Data center personal property makes 33 percent of total property tax revenue. Data center real property makes 14 percent. Together they make 47 percent, and data centers make 38 percent of general fund revenue. The chart does not state its year.
Does Loudoun County give data centers a tax rate break?
No. Data center computer equipment pays the county's general personal property rate. It paid $4.20 per $100 of assessed value through tax year 2022. It has paid $4.15 since tax year 2023. The county's rate tables carry no lower rate for this equipment. A full search of this site's agreements record found no Loudoun County abatement and no payment-in-lieu deal for data centers. The county's one documented tax treatment of the industry is the full rate.
One exception exists inside the county, and it belongs to a town. In February 2024 the Town of Leesburg made a commitment in the Compass Creek annexation settlement. The commitment caps its own town business personal property rate on data center computer equipment at $0.75 per $100. The town rate otherwise stood at $1.00, and the cap runs for at least five years. The cap was a term of Microsoft's written consent to the annexation of its campus. The same settlement has the county paying the town $2 million a year, rising 3 percent a year. The value of the town rate cap is not published. It changes nothing about the county rate above: the $684.8 million was charged at the full rate of $4.15 per $100.
Deals elsewhere work differently, and the difference is the point of the comparison. Counties and states that grant breaks state a value for them, and this site's tax-break-per-job calculator divides each stated value by the jobs the deal promised. Loudoun's baseline, against which those deals can be priced, is a full-rate line with no county deal attached.
The break that sits outside the county's numbers
The county figures above do not show the one large tax break Virginia data centers can claim, because it is a state tax. Under Section 58.1-609.3(18) of the Code of Virginia, a qualifying data center pays no state retail sales and use tax on its computer equipment and enabling software. Qualifying takes at least $150 million in new capital investment and at least 50 new jobs paying at least 150 percent of the local prevailing wage. The operator signs a memorandum of understanding with the Virginia Economic Development Partnership, with repayment owed if the investment and job goals go unmet. The exemption runs from July 1, 2010 through June 30, 2035.
Which Loudoun operators claim it, and what each one saves, is not published in these records. The state publishes the program's terms and no per-company value, so no dollar figure exists to set against the county's $684.8 million. This site's benefits hub tracks how the exemption sits among the 218 agreements in the record across 39 states.
What residents got: a lower rate, in the same books
The reader question behind this page is what residents received while the equipment line climbed. The county's documents hold one household-facing series that runs the whole period: the general real property tax rate, the rate applied to homes. Every year of it:
| Tax year | Real property rate per $100 |
|---|---|
| 2016 | $1.145 |
| 2017 | $1.125 |
| 2018 | $1.085 |
| 2019 | $1.045 |
| 2020 | $1.035 |
| 2021 | $0.98 |
| 2022 | $0.89 |
| 2023 | $0.875 |
| 2024 | $0.865 |
| 2025 | $0.805 |
| 2026 | $0.805 |
The rate fell every year from 2016 through 2025 and held at $0.805 in tax year 2026. Over the same span the county's total property tax revenue grew. A falling rate and a rising take fit together when the base grows faster than the rate falls.
The same section has to carry the limit, because the county's documents carry it. A lower rate is not a lower bill. A household's bill is the rate multiplied by its assessed value. The county's total assessed value nearly doubled across the period, from $80.5 billion in fiscal 2016 to $157.5 billion in fiscal 2023. The budget documents print the revenue series and the rate series side by side. No county document in the record states that data center revenue caused the rate cuts, and this page does not state it either. What the record shows is the two series together, in the same books, over the same ten years.
The other side of 38 percent
A county that takes 38 percent of its general fund revenue from one industry carries a concentration exposure, and the figure that proves the benefit proves the exposure. The equipment line depends on the assessed value of one industry's hardware in one county. If that value falls, through slower building, faster equipment write-downs, or values moving elsewhere, the line falls with it, and the line is the general fund's largest identified source.
The fiscal 2025 adopted figure shows the smaller, ordinary version of the same point. The county adopted $670.3 million for a year whose equipment line it could not yet count, below what the year before had actually produced. Budgeting on this line means forecasting an industry's hardware values a year or more ahead. The county's proposed fiscal 2027 figure, $879.1 million, is that forecast made again, larger.
What it uses: power and water, as far as the record goes
The county's tax record is complete enough to print to the dollar. Its use record is not. This site checked its measured-use files, its measured-water files, and its load-forecast files for Loudoun County on November 28, 2026. None of the three holds a Loudoun row. No staged document publishes a county total for the electricity or the water Loudoun's data centers use.
What the record holds instead is per-project paper: air permits that size backup generator fleets, utility filings for individual service requests, and project pages that carry each campus's own statements where a document makes one. Those pieces are real, and they do not add up to a county consumption figure anyone has published. The two cluster pieces on power and water, listed below, work from that per-project paper and print the gaps where the paper runs out.
What the record does not show
We checked the county's budget books, its annual financial report, and this site's agreements, measured-use, and measured-water records for the figures that would complete this picture. Five are not published:
- The dollar amount of real property tax data centers pay on their buildings and land. The county's presentation gives a 14 percent share of total property tax revenue, in a chart that states no year. No dollar line exists to print.
- What any single operator paid the county. The equipment line is a county total across all data centers, and the budget documents break it out by no company.
- The value of the state sales tax exemption, per operator or for the county in total. The program's terms are public. Its per-company values are not.
- A county total for electricity or water use by data centers, from any staged source.
- What any individual household's tax bill did across the decade, or any county document attributing the rate cuts to data center revenue. The rate series and the revenue series are published. A document connecting them is not.
The Loudoun record, piece by piece
This page is the hub of a set of pieces that each take one part of the county record down to its documents. Links are added here as each piece publishes, in this order:
1. Loudoun County by the numbers (the data study behind every figure on this page) 2. How many data centers are in Loudoun County? 3. How much tax revenue do data centers pay Loudoun County? 4. Loudoun County's data center tax rates, explained 5. Why Loudoun kept cutting its real property tax rate 6. How Ashburn became Data Center Alley 7. Loudoun County's data center rules: zoning and approvals 8. Loudoun vs Prince William: two counties, two approaches 9. How much power do Loudoun County data centers use? 10. How much water do Loudoun County data centers use? 11. Who pays for the grid upgrades Loudoun data centers need? 12. Data center jobs in Loudoun County: what the record shows
What to watch next
Three dated events will move every figure above. The county's next budget book prints the fiscal 2025 actual for the equipment line, replacing the adopted $670.3 million with what arrived. The fiscal 2027 budget is adopted in the spring, which settles whether the proposed $879.1 million stands. And the Board of Supervisors sets the tax year 2027 real property rate in the same cycle. That vote shows whether the rate holds at $0.805 for a second year or moves. This page updates when those documents publish.
How this page is built
Every figure on this page comes from a public document: the county's budget books and annual financial report, the Code of Virginia, a Commonwealth settlement report, and this site's project record. The project counts, stage counts, and capacity table were rebuilt from the site's staged record on November 28, 2026, and the build is saved with the data prep file for this cluster. Figures labeled actual are reported collections. Figures labeled adopted or proposed are budget decisions, and the page labels them that way in every table. Data Center Fact Check is published by Perspective Holdings, LLC. Corrections go to the editor and are noted on the page when a figure changes.
Frequently asked questions
How many data centers are in Loudoun County?
This site's record holds 128 data center projects in Loudoun County, 93 of them operating, counted on November 28, 2026. The count treats one site or campus as one project, however many buildings the campus holds. The county counts buildings, so county-published counts run higher than this one.
How much tax revenue do data centers pay Loudoun County?
In fiscal 2024, data center computer equipment paid $684,787,341 in county personal property tax, the latest actual year in the county's books. The county counts data centers as 38 percent of its general fund revenue and 47 percent of its total property tax revenue. Those shares come from a presentation published with the fiscal 2026 proposed budget, and the presentation states no year for them.
Does Loudoun County give data centers a tax break?
At the county level, no rate break and no abatement for data centers appear in the record, and the equipment pays the county's general personal property rate. Two exceptions sit outside the county rate. Virginia exempts qualifying data center equipment from state sales tax, with no published per-company value. And the Town of Leesburg capped its own town rate on this equipment at $0.75 per $100 inside one annexation settlement.
What tax rate do Loudoun County data centers pay on their equipment?
Data center computer equipment pays the county's general personal property rate. The rate was $4.20 per $100 of assessed value through tax year 2022. It has been $4.15 per $100 since tax year 2023. The county's rate tables carry no lower rate for this equipment.
Did data center revenue cut Loudoun homeowners' tax rates?
The record shows the two series moving together and attributes nothing. The real property rate fell every year from 2016 through 2025 while data center equipment revenue climbed, and no county document in the record states that the revenue caused the cuts. A lower rate also settles no household's bill on its own, because the county's total assessed value nearly doubled across the same period.
QTS Ashburn video · 2 min 18 sec
Sources
- FY 2026 Proposed Budget · Loudoun County, Virginia · Checked November 28, 2026 · General Fund revenue chapter: the data center computer equipment line (fiscal 2022, 2023, and 2024 actuals; fiscal 2025 and 2026 adopted figures) and total general property taxes; tax rate table (real and personal property rates). The equipment line is personal property tax on data center computer equipment only and excludes real property tax on buildings and land.
- FY 2027 Proposed Budget, Executive Summary · Loudoun County, Virginia · Checked November 28, 2026 · Executive Summary, p. 34: the proposed fiscal 2027 equipment figure, $879,094,354, labeled proposed
- FY 2026 Proposed Budget Presentation · Loudoun County, Virginia · Checked November 28, 2026 · Data centers provide 38 percent of General Fund revenues; data center personal property (33 percent) plus real property (14 percent) make 47 percent of total property tax revenue. The presentation states no year for the shares.
- FY 2023 Annual Comprehensive Financial Report · Loudoun County, Virginia · Checked November 28, 2026 · Table G, p. 224 (tax rates, fiscal 2016 to 2023; data center computer equipment pays the general personal property rate, no preferential rate); Table F, p. 223 (total assessed value, fiscal 2016 and fiscal 2023); Table E, p. 222 (total property taxes, all governmental funds)
- FY 2027 Appropriations Resolution · Loudoun County Board of Supervisors · Checked November 28, 2026 · Attachment 2: the tax year 2026 real property rate held at $0.805 per $100
- Code of Virginia, Section 58.1-609.3, subdivision 18 (data center sales and use tax exemption) · Virginia Legislative Information System · Checked November 28, 2026 · Subdivision 18: the retail sales and use tax exemption for computer equipment or enabling software for use in a qualifying data center, July 1, 2010 through June 30, 2035, with the $150 million investment and 50 job thresholds
- Data Center Retail Sales & Use Tax Exemption · Virginia Economic Development Partnership · Checked November 28, 2026 · Program thresholds (at least $150 million in capital investment, at least 50 new jobs paying at least 150 percent of the prevailing average wage) and the requirement to enter a memorandum of understanding with VEDP before claiming, with repayment obligations if the goals go unmet
- Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement · Virginia Commission on Local Government (Department of Housing and Community Development) · April 30, 2024 · The Town of Leesburg's commitment to a business personal property tax rate on data center computer equipment not to exceed $0.75 per $100 (the town's rate otherwise $1.00 per $100), for at least five years, as a term of Microsoft's consent letter to the Compass Creek annexation; the county's Economic Development Incentive Payment to the town of $2 million per year, increased 3 percent each year
- Staged record: projects.csv (1,320 projects, 128 with county us-va-loudoun, 231 in Virginia), county_metrics.csv, abatements.csv (218 agreements), project_capacity.csv, and the measured_use, measured_water, and load_forecasts files (no Loudoun rows) · Data Center Fact Check · Checked November 28, 2026
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Loudoun County data centers: the complete record." Published 2026-11-28. Accessed 2026-11-29. https://datacenterfactcheck.org/articles/loudoun-county-data-centers