Data centers in America, by the numbers
Data centers in America, in numbers that fit in your head. Counted from 1,289 projects we track. Tap any tile to see how we counted it, or share it.
Land under data center projects
At least 167,665
football fields of land
221,706 acres across 427 projects that state a site size.
As of November 29, 2026, the 427 active projects that state a site size cover 221,706 acres of land, about 167,665 American football fields including both end zones.
How we counted this
We add up the acres stated for each project and convert at 43,560 square feet per acre, then divide by one American football field including both end zones (360 by 160 feet, 57,600 square feet). This is land, not building floor area. Based on 427 of our 1,289 active projects. The rest do not state it, so the real total is higher.
If the buildings now going up ran flat out
63.1 million
homes' worth of electricity, a ceiling
662 terawatt-hours a year.
As of November 29, 2026, the 75,541 MW under construction would use about 662 terawatt-hours a year if run flat out, equal to about 63,076,927 homes at 10,491 kWh a home a year.
How we counted this
Announced megawatts for projects under construction (75,541 MW), run all 8,760 hours of a year, divided by the average U.S. home's use of 10,491 kWh a year (2025). Real buildings run below full capacity, so treat this as a ceiling, not a forecast.
The biggest announced site by land
40,000 acres
Stratos Project
Box Elder County, Utah
About 30,250 football fields.
Stratos Project in Box Elder County, Utah is the biggest announced site by land, at 40,000 acres, as of November 29, 2026.
How we counted this
The active project with the most stated acres. Stated by the developer or in a filing, and not checked against a survey.
That land next to Manhattan
About 15.3 Manhattans
In words: the 221,706 acres counted across the 427 projects that state a site size come to about 15.3 times the land area of Manhattan, which is about 22.7 square miles.
How we counted this
221,706 acres is about 346 square miles. Manhattan's land area is about 22.7 square miles (2020 Census, as reported; we have not yet loaded the Census table as a source record). Each square below is one Manhattan, so the last one is partly filled. Land only, and only for the 427 projects that state a site size.
Power next to the sun
2.0 quadrillion times
more power from the sun than all announced data centers combined
In words: all announced data centers together come to 192,098 MW, and the sun puts out about 2.0 quadrillion times as much power.
How we counted this
Announced capacity across all active projects is 192,098 MW, or 1.92 times 10 to the 11th watts. The sun puts out about 3.828 times 10 to the 26th watts (the International Astronomical Union's 2015 nominal value). Divide the two and the sun wins by about 2.0 quadrillion. Announced capacity is a plan and not a measured load, and counting only the 479 projects that state a capacity, so the real total is higher. The smaller circle is drawn bigger than true scale so you can see it at all.
Power announced, in megawatts
192,098 MW
- Running now17,190 MW · 681 projects
- Being built75,541 MW · 185 projects
- Planned87,296 MW · 292 projects
- Adding capacity10,371 MW · 53 projects
As of November 29, 2026, active projects announce 192,098 MW in total, counted from the 479 of 1,289 active projects that state a capacity.
How we counted this
Each project's announced capacity in megawatts, grouped by stage. 479 of 1,289 active projects state a capacity, so the real totals are higher. Announced capacity is a plan, not what a building uses.
The biggest announced site by power
11,000 MW
Fermi Project Matador (Advanced Energy and Intelligence Campus)
Carson County, Texas
See the full ranking of largest projects
See the lists from the record: tax breaks, states, operators
Fermi Project Matador (Advanced Energy and Intelligence Campus) in Carson County, Texas is the biggest announced site by power, at 11,000 MW announced, as of November 29, 2026.
How we counted this
The active project with the most announced megawatts. A plan stated by the developer, not a measured load.
States with the most projects
- Virginia230 projects
- Texas155 projects
- California90 projects
- Georgia80 projects
- Illinois55 projects
- Arizona52 projects
- Ohio50 projects
- Utah43 projects
As of November 29, 2026, Virginia has the most tracked active projects, with 230.
How we counted this
Active projects by state, from the records we hold. Counts reflect what we have found so far, so a state we have searched less can be undercounted. See how complete we are.
Counties with the most projects
- Loudoun County, Virginia128 projects
- Santa Clara County, California58 projects
- Maricopa County, Arizona48 projects
- Cook County, Illinois36 projects
- Dallas County, Texas36 projects
- Fulton County, Georgia26 projects
- Prince William County, Virginia24 projects
- Salt Lake County, Utah24 projects
As of November 29, 2026, Loudoun County, Virginia has the most tracked active projects of any county, with 128.
How we counted this
Active projects by county, from the records we hold. Loudoun County, Virginia is known for the largest cluster of data centers in the world, and the count here is what we have found so far.
Companies named as operator on the most projects
- DataBank80 projects
- QTS68 projects
- Equinix68 projects
- Amazon53 projects
- CyrusOne53 projects
- Google42 projects
- Microsoft39 projects
- Aligned Data Centers33 projects
As of November 29, 2026, DataBank is named as the facility operator on the most tracked active projects, with 80.
How we counted this
Active projects where the company is named as the facility operator in a record we hold. A project can name more than one company.
Aerial photos on file
619
sites you can see from above, on 593 project pages.
Browse projectsAs of November 29, 2026, 619 aerial and site images are on file across 593 project pages.
How we counted this
Count of project pages that show an aerial or satellite image from a public source.
Questions people ask
- How many data centers are in the United States?
- Data Center Fact Check tracks 1,320 data center projects in the United States as of November 2026. The count covers every stage, from announced to operating, and it is a lower bound: it counts the projects we have found in public records, not every data center that exists.
- How many data centers are in Virginia?
- Data Center Fact Check tracks 231 data center projects in Virginia as of November 2026. That is the most of any state. The Virginia page lists each one with its county, stage, and sources.
- How many data centers are in Texas?
- Data Center Fact Check tracks 155 data center projects in Texas as of November 2026. The Texas page lists each one with its county, stage, and sources.
- Which state has the most data centers?
- Virginia has the most tracked data center projects, with 231 as of November 2026. Texas is next with 155. Counts are of projects we track from public records, so they are lower bounds; a tracker that counts only operating facilities will give a different answer.
Questions we cannot answer yet
These are the numbers people ask about most. We publish one only when we can source it, and we would rather say "not yet" than guess.
- How many football fields of building floor area?
We count the land (acres) of each site, which is public. Building floor area is stated for only a few projects so far. - How much is due to open in 2027 and 2028?
Most announcements give a stage, not an opening year. We will show these once each project carries a sourced expected in-service year. - How many jobs, and how many are construction, blue collar and white collar?
Jobs are often announced as a headline total. We will add them project by project, with the filing or release quoted. - How much runs on nuclear, hydro, solar or wind?
Power sources are named in some filings and utility plans. We will count them only where a document says so. - How many Nvidia Blackwell chips?
Chip counts are rarely disclosed. We have one project with a stated GPU count so far, which is too few to add up. - How many miles of Cat 5 cable?
Nobody publishes this, so we will not guess it.
Figures come from the project records on this site, which are drafts until verified. How complete is this? Our articles explain what these numbers mean.
What the record shows · November 28, 2026
Loudoun County data centers: the complete record
Loudoun County's 128 data centers paid $684.8 million in equipment tax in fiscal 2024, at the full county rate. The record, from the county's books.
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
Per SpaceX's Form 424B4, xAI Colossus 2 in Memphis runs two clusters online: about 110,000 GB200 processors at about 210 MW, and 110,000 GB300 processors at 220 MW, 430 MW in total.
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Data centers in America, by the numbers." Updated 2026-11-29. Accessed 2026-11-29. https://datacenterfactcheck.org/numbers