Data Center Fact Check tracks 90 data center projects in California as of November 2026: 65 operating, 9 under construction and 6 approved, totaling about 2,406 MW announced where a figure is published.
California has 90 tracked data centers. Their announced capacity totals about 2,406 MW where a figure is published. Of those, 65 operating, 9 under construction and 6 approved; the stage of the other 2 is not known yet. Every figure comes from the public record linked on this page.
Data center projects in California
- Amazon Web Services Gilroy data center
Under constructionGilroy98 MW announced
- AVAIO Digital Perseus, Pittsburg Technology Park Phase I
ApprovedPittsburg99 MW announced
- Centersquare LAX3 (Los Angeles)
Operating
- Centersquare LAX4 (Los Angeles)
OperatingHawthorne
- Centersquare LAX5 (Los Angeles)
OperatingIrvine17 MW announced
- Colovore SJC01
OperatingSanta Clara
- Colovore SJC02
OperatingSanta Clara9 MW announced
- CoreSite LA1 (One Wilshire), Los Angeles
OperatingLos Angeles
- CoreSite LA2, Los Angeles
OperatingLos Angeles
- CoreSite LA3, Los Angeles
OperatingLos Angeles
- CoreSite Santa Clara Campus (SV3-SV8)
OperatingSanta Clara
- CoreSite SV1
OperatingSan Jose
- CoreSite SV2
OperatingMilpitas
- CoreSite SV9, Santa Clara
OperatingSanta Clara34 MW announced
- Csquare SFO1
OperatingSanta Clara
- Csquare SFO2
OperatingSanta Clara
- Csquare SFO3
OperatingSunnyvale
- Csquare SFO4
OperatingSanta Clara
- CyrusOne Santa Clara data center (Sequoia, SCV1)
OperatingSanta Clara68 MW announced
- DataBank/Goodman LAX2, Vernon
Under constructionVernon32 MW announced
- DataBank LAX1 (Los Angeles)
OperatingLos Angeles2 MW announced
- DataBank SAN1 (San Diego)
OperatingSan Diego7 MW announced
- DataBank SNA1 (Irvine)
Operating3 MW announced
- DataBank SNA2 (Irvine)
OperatingIrvine8 MW announced
- Digital Realty BUR10 (Burbank)
OperatingBurbank
- Digital Realty Lafayette Data Center, Santa Clara
ApprovedSanta Clara66 MW announced
- Digital Realty LAX10 (Los Angeles)
OperatingLos Angeles
- Digital Realty LAX11 (El Segundo)
OperatingEl Segundo
- Digital Realty LAX12 (El Segundo)
OperatingEl Segundo
- Digital Realty OAK10 (Oakland)
OperatingOakland
- Digital Realty SC1 (Santa Clara)
OperatingSanta Clara
- Digital Realty SFO10, San Francisco
OperatingSan Francisco
- Digital Realty SFO12 (365 Main), San Francisco
OperatingSan Francisco
- Digital Realty SJC10
OperatingSanta Clara
- Digital Realty SJC14 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC15 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC16 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC29 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC30 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC31 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC34 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC35 (Santa Clara)
OperatingSanta Clara
- Digital Realty SJC37, Santa Clara
Under constructionSanta Clara48 MW announced
- EdgeCore Laurelwood Data Center
Under constructionSanta Clara99 MW announced
- Element Critical Silicon Valley SV1, Sunnyvale
OperatingSunnyvale10 MW announced
- Equinix Corvin Drive Campus
OperatingSanta Clara
- Equinix Great Oaks South Data Center (SV1)
Under constructionSan Jose99 MW announced
- Equinix LA4 (Los Angeles)
OperatingEl Segundo
- Equinix LA7 (Los Angeles)
OperatingTorrance
- Equinix SV10 (Silicon Valley)
OperatingSan Jose
Who serves this place
- Not collected yet.
Counties and cities in California
Counties
- Alameda County4 data center projects tracked
- Contra Costa County1 data center project tracked
- Los Angeles County14 data center projects tracked
- Orange County4 data center projects tracked
- Sacramento County4 data center projects tracked
- San Diego County2 data center projects tracked
- San Francisco County2 data center projects tracked
- San Joaquin County1 data center project tracked
- Santa Clara County58 data center projects tracked
Cities and towns
- Santa Clara40 data center projects tracked
- San Jose14 data center projects tracked
- Los Angeles5 data center projects tracked
- El Segundo4 data center projects tracked
- Sacramento3 data center projects tracked
- Irvine2 data center projects tracked
- San Diego2 data center projects tracked
- San Francisco2 data center projects tracked
- Sunnyvale2 data center projects tracked
- Vernon2 data center projects tracked
- Burbank1 data center project tracked
- Fremont1 data center project tracked
- Gilroy1 data center project tracked
- Hawthorne1 data center project tracked
- Hayward1 data center project tracked
- McClellan Park1 data center project tracked
- Milpitas1 data center project tracked
- Newark1 data center project tracked
- Oakland1 data center project tracked
- Pittsburg1 data center project tracked
- Stockton1 data center project tracked
- Torrance1 data center project tracked
For homeowners
What the projects here mean if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
Property tax
Microsoft San Jose data center (Alviso):No county assessment or tax payment record for this campus has been collected yet.
Not known yet
Tax breaks
Microsoft San Jose data center (Alviso):No tax break or incentive agreement naming this campus is in our records.
Not known yet
Money for schools and services
Microsoft San Jose data center (Alviso):Microsoft is paying the city at least $9,274,314 for easements and site works at the wastewater facility next door.
Not known yet
Electricity bill
Microsoft San Jose data center (Alviso):PG&E serves this campus, which is approved for a maximum electrical draw of 99 megawatts.
Not known yet
Water
Microsoft San Jose data center (Alviso):The campus is planned to use about 423 acre-feet of water a year, mostly recycled water.
Not known yet
Jobs
Microsoft San Jose data center (Alviso):The approved project projects about 100 operations jobs at this campus.
Not known yet
Next door: height, setbacks, noise
Microsoft San Jose data center (Alviso):The approved project removes 79 trees and relocates a water purification visitor center beside the site.
Not known yet
Your say
Microsoft San Jose data center (Alviso):Residents challenged this project's first approval in court, and the case turned on a filing deadline.
How to take part
Recent cases and dockets in California
- Utility commission · Pending before the commissionPG&E Advice Letter 7919-E: transmission upgrades for GIC San Jose LLC (Tier 3, resolution required)
- Utility commission · DecidedApplication of Southern California Edison Company (U338E) to Establish Marginal Costs, Allocate Revenues, and Design Rates (2024 General Rate Case Phase 2)
- Utility commission · DecidedElectric Rule 15 and 16 Exceptional Case Submittal for Engineering, Procurement, and Construction Agreement with STACK Infrastructure, Inc.
- Utility commission · DecidedElectric Rules 2, 15, 16 Exceptional Case Submittal, Electric Transmission Interconnection, Sunnyvale Technology Partners LLC c/o Menlo Equities
- Utility commission · DecidedExceptional Case Submittal for Electric Transmission Upgrades for Microsoft Corporation for its SJC02 Project in San Jose, California
- Utility commission · Pending before the commissionApplication of Pacific Gas and Electric Company (U39E) for Approval of Electric Rule No. 30 for Transmission-Level Retail Electric Service
- Court case · PendingImperial Valley Computer Manufacturing, LLC v. City of Imperial, et al.
- Utility commission · DecidedElectric Rule 2, 15, and 16 Exceptional Case Submittal for Electric Transmission Service Facilities for STACK Infrastructure
- Utility commission · Pending before the commissionOrder Instituting Rulemaking to Establish Energization Timelines
- Court case · DecidedOrganizacion Comunidad de Alviso v. City of San Jose (Microsoft Corporation et al., real parties in interest)
Bills and laws in California
- SB 58 · Died or failedWould have capped the sales tax on data center equipment at 2 percent for state-certified facilities; died in committee and the bill number was reused for an unrelated air quality measure
- AB 222 · Died or failedWould have required biannual PUE reporting to the Energy Commission and a CPUC cost-shift assessment; died in the Senate
- AB 2469 · Signed into law · Sep 21, 2026Bars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- AB 2383 · Signed into law · Sep 21, 2026Requires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- SB 887 · Signed into law · Sep 21, 2026Lets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- SB 1168 · Signed into law · Sep 21, 2026Orders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
- SB 886 · Signed into law · Sep 21, 2026Makes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- AB 2619 · Signed into law · Sep 21, 2026Requires urban water suppliers to count data center demand in annual water supply assessments
- SB 887 · Signed into law · Sep 21, 2026Ends CEQA categorical exemptions for data centers and adds a certified fast track
- AB 1577 · Signed into law · Sep 21, 2026Requires data centers of 10 MW or more to report facility, energy, water-cooling and PUE data to the Energy Commission
- SB 1168 · Signed into law · Sep 21, 2026Directs the utilities commission to assess data center rate structures
- AB 1577 · Signed into law · Sep 21, 2026Requires data centers to report energy use to the Energy Commission
- AB 2383 · Signed into law · Sep 21, 2026Requires data center electricity tariffs so other customers do not pay their grid costs
- AB 2619 · Signed into law · Sep 21, 2026Requires data centers to report water use when business licenses are issued and renewed
- SB 886 · Signed into law · Sep 21, 2026Requires data center interconnection tariffs that keep grid upgrade costs off other customers
- AB 2469 · Signed into law · Sep 21, 2026Bars local approval of a data center without a water supply assessment
- SB 57 · Signed into law · Oct 11, 2025Orders a state study of data center costs for other customers
- AB 93 · Vetoed · Oct 11, 2025Requires data centers to report expected and annual water use
- SB 1298 · Died or failed · Sep 4, 2024Would have let the Energy Commission exempt data center backup generation plants up to 150 MW from powerplant certification; died in the Assembly
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Officials we track for California
The lawmakers and local officials whose recorded jurisdiction is California, with the bills and votes we have on record for each.
- Dave CorteseState Senator · 15
- Diane PapanState Assembly Member · 21
- Gavin NewsomGovernor
- Henry I. SternState Senator · 27
- Jerry McNerneyState Senator · 05
- Rebecca Bauer-KahanState Assembly Member · 16
- Rick Chavez ZburState Assembly Member · 51
- Stephen C. PadillaState Senator · 18
Questions people ask
- How many data centers are in California?
- Data Center Fact Check tracks 90 data center projects in California as of November 2026. Of those, 65 operating, 9 under construction and 6 approved; the stage of the other 2 is not known yet.
- What is the biggest data center in California?
- By announced capacity, the biggest data center in California is Manchester/Edgemoor NAVWAR Old Town Campus data center concept, San Diego, announced at 400 MW. It is proposed.
- How much power do data centers in California use?
- The 90 projects tracked in California have announced about 2,406 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1Final Environmental Impact Report, San Jose Data Center / SJ2 (CEC-700-2021-003-F), Docket 19-SPPE-04
California Energy CommissionTier 1 · Open the source - 2San Jose Planning Commission Action Minutes, April 9, 2025 (Microsoft CP23-016 conditional use permit, 1657 Alviso-Milpitas Rd)
City of San JoseTier 1 · Open the source - 3California Awards $71.1 million in Tax Credits Projected to Create More Than 5,200 Jobs
California Governor's Office of Business and Economic Development (GO-Biz)Tier 1 · Open the source - 4Council Memorandum, File 25-1211: Master Easements Agreement and Site Works Agreement with Microsoft Corporation and Valley Water (October 27, 2025)
City of San JoseTier 1 · Open the source - 5City Council Meeting Minutes, Tuesday, November 18, 2025
City of San Jose (City Clerk, via Legistar)Tier 1 · Open the source - 6Notice of Determination: Issuance of an Authority to Construct for Emergency Backup Natural Gas Generators Sources S-1 through S-140 (Air District Application #31953)
Bay Area Air Quality Management District (via CEQAnet, SCH 2021020002)Tier 1 · Open the source - 7HITT Contracting Breaks Ground on Microsoft Alviso Datacenter Campus in San Jose
HITT Contracting Inc.Tier 1 · Open the source - 8Organizacion Comunidad de Alviso v. City of San Jose, 60 Cal.App.5th 783 (2021), Appeal No. H046458
California Court of Appeal, Sixth Appellate DistrictTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "California." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ca
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page