Data Center Fact Check tracks 14 data center projects in Los Angeles County, California as of November 2026: 13 operating and 1 under construction, totaling about 84 MW announced where a figure is published.
Los Angeles County has 14 tracked data centers. Their announced capacity totals about 84 MW where a figure is published. Of those, 13 operating and 1 under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
Data center projects in Los Angeles County
- Centersquare LAX4 (Los Angeles)
OperatingHawthorne
- CoreSite LA1 (One Wilshire), Los Angeles
OperatingLos Angeles
- CoreSite LA2, Los Angeles
OperatingLos Angeles
- CoreSite LA3, Los Angeles
OperatingLos Angeles
- DataBank/Goodman LAX2, Vernon
Under constructionVernon32 MW announced
- DataBank LAX1 (Los Angeles)
OperatingLos Angeles2 MW announced
- Digital Realty BUR10 (Burbank)
OperatingBurbank
- Digital Realty LAX10 (Los Angeles)
OperatingLos Angeles
- Digital Realty LAX11 (El Segundo)
OperatingEl Segundo
- Digital Realty LAX12 (El Segundo)
OperatingEl Segundo
- Equinix LA4 (Los Angeles)
OperatingEl Segundo
- Equinix LA7 (Los Angeles)
OperatingTorrance
- Prime Data Centers Los Angeles (LAX01), Vernon
OperatingVernon33 MW announced
- T5@Los Angeles (T5@LA), El Segundo
OperatingEl Segundo17 MW announced
Who serves this place
- Not collected yet.
Places in and around Los Angeles County
Los Angeles County is part of California.
Cities and towns
- Burbank1 data center project tracked
- El Segundo4 data center projects tracked
- Hawthorne1 data center project tracked
- Los Angeles5 data center projects tracked
- Torrance1 data center project tracked
- Vernon2 data center projects tracked
Nearby places
- Santa Clara County58 data center projects tracked
- Alameda County4 data center projects tracked
- Orange County4 data center projects tracked
- Sacramento County4 data center projects tracked
- San Diego County2 data center projects tracked
- San Francisco County2 data center projects tracked
- Contra Costa County1 data center project tracked
- San Joaquin County1 data center project tracked
Court cases and commission dockets in California (10)
Bills and laws in California
- AB 222 · Died or failedWould have required biannual PUE reporting to the Energy Commission and a CPUC cost-shift assessment; died in the Senate
- SB 58 · Died or failedWould have capped the sales tax on data center equipment at 2 percent for state-certified facilities; died in committee and the bill number was reused for an unrelated air quality measure
- SB 887 · Signed into law · Sep 21, 2026Lets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- AB 2383 · Signed into law · Sep 21, 2026Requires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- SB 886 · Signed into law · Sep 21, 2026Makes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- SB 1168 · Signed into law · Sep 21, 2026Orders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
- AB 2469 · Signed into law · Sep 21, 2026Bars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- AB 2619 · Signed into law · Sep 21, 2026Requires urban water suppliers to count data center demand in annual water supply assessments
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Los Angeles County?
- Data Center Fact Check tracks 14 data center projects in Los Angeles County as of November 2026. Of those, 13 operating and 1 under construction.
- What is the biggest data center in Los Angeles County?
- By announced capacity, the biggest data center in Los Angeles County is Prime Data Centers Los Angeles (LAX01), Vernon, announced at 33 MW. It is operating.
- How much power do data centers in Los Angeles County use?
- The 14 projects tracked in Los Angeles County have announced about 84 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Los Angeles County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ca-los-angeles
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page