County Card
Data centers in San Francisco County, California
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in San Francisco County, California as of November 2026.
San Francisco County has 2 tracked data centers. Of those, 2 operating. The projects here are Digital Realty SFO10, San Francisco and Digital Realty SFO12 (365 Main), San Francisco. Every figure comes from the public record linked on this page.
Data center projects in San Francisco County
- Digital Realty SFO10, San Francisco
OperatingSan Francisco
- Digital Realty SFO12 (365 Main), San Francisco
OperatingSan Francisco
Who serves this place
- Not collected yet.
Places in and around San Francisco County
San Francisco County is part of California.
Cities and towns
- San Francisco2 data center projects tracked
Nearby places
- Santa Clara County58 data center projects tracked
- Los Angeles County14 data center projects tracked
- Alameda County4 data center projects tracked
- Orange County4 data center projects tracked
- Sacramento County4 data center projects tracked
- San Diego County2 data center projects tracked
- Contra Costa County1 data center project tracked
- San Joaquin County1 data center project tracked
Court cases and commission dockets in California (10)
Bills and laws in California
- AB 222 · Died or failedWould have required biannual PUE reporting to the Energy Commission and a CPUC cost-shift assessment; died in the Senate
- SB 58 · Died or failedWould have capped the sales tax on data center equipment at 2 percent for state-certified facilities; died in committee and the bill number was reused for an unrelated air quality measure
- SB 887 · Signed into law · Sep 21, 2026Lets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- AB 2383 · Signed into law · Sep 21, 2026Requires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- SB 886 · Signed into law · Sep 21, 2026Makes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- SB 1168 · Signed into law · Sep 21, 2026Orders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
- AB 2469 · Signed into law · Sep 21, 2026Bars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- AB 2619 · Signed into law · Sep 21, 2026Requires urban water suppliers to count data center demand in annual water supply assessments
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in San Francisco County?
- Data Center Fact Check tracks 2 data center projects in San Francisco County as of November 2026. Of those, 2 operating.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "San Francisco County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ca-san-francisco
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page