Utility commission
Application of Pacific Gas and Electric Company (U39E) for Approval of Electric Rule No. 30 for Transmission-Level Retail Electric Service
Where it stands: Pending before the commission as of Jan 9, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
PG&E applied on November 21, 2024 for Electric Rule 30, a tariff for new retail customers taking service at transmission voltage (roughly 50 to 230 kV), a class that previously had no tariff and was served deal by deal through exceptional case resolutions. Decision D.25-07-039 (issued July 28, 2025) partially granted interim implementation: transmission-level customers may take service now if they pay in advance or pay actual costs, and they may voluntarily prefund up to 100 percent of specific transmission network upgrades; new transmission-level customers bear the initial cost of all transmission facilities built for them. Refunds, interest, and repayment of prefunding loans are deferred to the final decision, and repayment is not guaranteed. PG&E's compliance Advice Letter 7671-E was rejected in October 2025 because its prefunding loan did not require the customer to prefund 100 percent of all transmission network upgrades as the decision requires. As filed (not adopted), PG&E proposed a minimum demand charge of 75 percent of contracted peak demand and a 15-year minimum contract term. An ALJ ruling of January 9, 2026 re-established the proceeding schedule on cost allocation; the application remains pending.
The facts
- Regulator
- California Public Utilities Commission
- Docket number
- A.24-11-007
- Type
- Large load tariff
- Utility
- Pacific Gas & Electric Co.
- State
- California
- Filed
- Nov 21, 2024
- Status date
- Jan 9, 2026
- Large-load rules
- Yes
Projects served by Pacific Gas & Electric Co.
Related cases and proceedings
- Utility commission · DecidedApplication of Southern California Edison Company (U338E) to Establish Marginal Costs, Allocate Revenues, and Design Rates (2024 General Rate Case Phase 2)
- Utility commission · DecidedElectric Rule 15 and 16 Exceptional Case Submittal for Engineering, Procurement, and Construction Agreement with STACK Infrastructure, Inc.
- Utility commission · DecidedElectric Rules 2, 15, 16 Exceptional Case Submittal, Electric Transmission Interconnection, Sunnyvale Technology Partners LLC c/o Menlo Equities
- Utility commission · DecidedExceptional Case Submittal for Electric Transmission Upgrades for Microsoft Corporation for its SJC02 Project in San Jose, California
- Court case · PendingImperial Valley Computer Manufacturing, LLC v. City of Imperial, et al.
- Utility commission · DecidedElectric Rule 2, 15, and 16 Exceptional Case Submittal for Electric Transmission Service Facilities for STACK Infrastructure
- Utility commission · Pending before the commissionOrder Instituting Rulemaking to Establish Energization Timelines
- Court case · DecidedOrganizacion Comunidad de Alviso v. City of San Jose (Microsoft Corporation et al., real parties in interest)
In the record
- Utility case, Nov 21, 2024. Utility case filed: Application of Pacific Gas and Electric Company (U39E) for Approval of Electric Rule No. 30 for Transmission-Level Retail Electric Service California Public Utilities Commission, A.24-11-007
Sources
- 1Administrative Law Judge's Ruling Setting Schedule on Cost Allocation Issues in A.24-11-007 (PG&E Electric Rule 30)
California Public Utilities CommissionTier 1 · ALJ Ruling Establishing Proceeding Schedule, filed January 9, 2026: procedural background (application filed November 21, 2024) and summary of D.25-07-039 (interim implementation terms; refunds, interest and loan repayment deferred to the final decision). The Advice Letter 7671-E rejection and the as-filed 75 percent minimum demand charge and 15-year term are per the Q5 WG2 notes (Commission disposition letter of November 19, 2025 and party testimony), not from the ruling itself. · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Pacific Gas and Electric Company (U39E) for Approval of Electric Rule No. 30 for Transmission-Level Retail Electric Service." Last activity 2026-01-09. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-pge-rule30-a24-11-007