Utility commission
Order Instituting Rulemaking to Establish Energization Timelines
Where it stands: Pending before the commission as of Sep 17, 2024
Draft research, not yet verified. Open a source to check any detail.
What it is
The Commission's energization rulemaking under Public Utilities Code Sections 930 to 939 (SB 410 and AB 50). Decision D.24-09-020 (issued September 17, 2024) set statewide average and maximum energization targets for PG&E, SCE and SDG&E under Electric Rules 15, 16, 29 and 45, set timelines for upstream capacity upgrades, and required biannual utility energization reports; the utilities' September 30, 2025 reports discuss large scope and large load projects as a source of energization delay. The proceeding page shows the rulemaking still ACTIVE, with phases continuing. Rowed once with utility_row_key empty because it binds all three large electric IOUs; type interconnection_rule is the closest staged value for an energization-timelines rulemaking.
The facts
- Regulator
- California Public Utilities Commission
- Docket number
- R.24-01-018
- Type
- Interconnection rule
- State
- California
- Filed
- Jan 25, 2024
- Status date
- Sep 17, 2024
- Large-load rules
- Yes
Related cases and proceedings
- Utility commission · DecidedExceptional Case Submittal for Electric Transmission Upgrades for Microsoft Corporation for its SJC02 Project in San Jose, California
- Utility commission · Pending before the commissionApplication of Pacific Gas and Electric Company (U39E) for Approval of Electric Rule No. 30 for Transmission-Level Retail Electric Service
- Court case · PendingImperial Valley Computer Manufacturing, LLC v. City of Imperial, et al.
- Utility commission · DecidedElectric Rule 2, 15, and 16 Exceptional Case Submittal for Electric Transmission Service Facilities for STACK Infrastructure
- Court case · DecidedOrganizacion Comunidad de Alviso v. City of San Jose (Microsoft Corporation et al., real parties in interest)
In the record
- Utility case, Jan 25, 2024. Utility case filed: Order Instituting Rulemaking to Establish Energization Timelines California Public Utilities Commission, R.24-01-018
Sources
- 1CPUC proceeding details: R.24-01-018 (Order Instituting Rulemaking to Establish Energization Timelines)
California Public Utilities Commission (apps.cpuc.ca.gov)Tier 1 · CPUC proceeding details page for R2401018 (filed January 25, 2024; status ACTIVE) and Decision 24-09-020 (issued September 17, 2024), summary and Sections 7 and 8 · Open the source - 2Decision 24-09-020: Decision Establishing Target Energization Time Periods and Procedure for Customers to Report Energization Delays (R.24-01-018)
California Public Utilities Commission (docs.cpuc.ca.gov)Tier 1 · CPUC proceeding details page for R2401018 (filed January 25, 2024; status ACTIVE) and Decision 24-09-020 (issued September 17, 2024), summary and Sections 7 and 8 · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Order Instituting Rulemaking to Establish Energization Timelines." Last activity 2024-09-17. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-cpuc-energization-r24-01-018