Data Center Fact Check tracks 3 data center projects in Sacramento, California as of November 2026: 2 operating and 1 proposed, totaling about 103 MW announced where a figure is published.
Sacramento has 3 tracked data centers. Their announced capacity totals about 103 MW where a figure is published. Of those, 2 operating and 1 proposed. The projects here are Link Logistics southeast Sacramento data center (proposed), NTT Sacramento campus (CA1, CA2, CA3), and QTS Sacramento. Every figure comes from the public record linked on this page.
Data center projects in Sacramento
- Link Logistics southeast Sacramento data center (proposed)
ProposedSacramento50 MW announced
- NTT Sacramento campus (CA1, CA2, CA3)
OperatingSacramento53 MW announced
- QTS Sacramento
OperatingSacramento
Who serves this place
- Not collected yet.
More places in Sacramento County
Sacramento is part of Sacramento County.
Nearby places
- McClellan Park1 data center project tracked
Court cases and commission dockets in California (10)
Bills and laws in California
- AB 222 · Died or failedWould have required biannual PUE reporting to the Energy Commission and a CPUC cost-shift assessment; died in the Senate
- SB 58 · Died or failedWould have capped the sales tax on data center equipment at 2 percent for state-certified facilities; died in committee and the bill number was reused for an unrelated air quality measure
- SB 887 · Signed into law · Sep 21, 2026Lets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- AB 2383 · Signed into law · Sep 21, 2026Requires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- SB 886 · Signed into law · Sep 21, 2026Makes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- SB 1168 · Signed into law · Sep 21, 2026Orders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
- AB 2469 · Signed into law · Sep 21, 2026Bars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- AB 2619 · Signed into law · Sep 21, 2026Requires urban water suppliers to count data center demand in annual water supply assessments
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Sacramento?
- Data Center Fact Check tracks 3 data center projects in Sacramento as of November 2026. Of those, 2 operating and 1 proposed.
- What is the biggest data center in Sacramento?
- By announced capacity, the biggest data center in Sacramento is NTT Sacramento campus (CA1, CA2, CA3), announced at 53 MW. It is operating.
- How much power do data centers in Sacramento use?
- The 3 projects tracked in Sacramento have announced about 103 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Sacramento." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ca-sacramento-city
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page