city Card
Data centers in Irvine, California
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 2 data center projects in Irvine, California as of November 2026, totaling about 25 MW announced where a figure is published.
Irvine has 2 tracked data centers. Their announced capacity totals about 25 MW where a figure is published. Of those, 2 operating. The projects here are Centersquare LAX5 (Los Angeles) and DataBank SNA2 (Irvine). Every figure comes from the public record linked on this page.
Data center projects in Irvine
- Centersquare LAX5 (Los Angeles)
OperatingIrvine17 MW announced
- DataBank SNA2 (Irvine)
OperatingIrvine8 MW announced
Who serves this place
- Not collected yet.
Court cases and commission dockets in California (10)
Bills and laws in California
- AB 222 · Died or failedWould have required biannual PUE reporting to the Energy Commission and a CPUC cost-shift assessment; died in the Senate
- SB 58 · Died or failedWould have capped the sales tax on data center equipment at 2 percent for state-certified facilities; died in committee and the bill number was reused for an unrelated air quality measure
- SB 887 · Signed into law · Sep 21, 2026Lets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- AB 2383 · Signed into law · Sep 21, 2026Requires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- SB 886 · Signed into law · Sep 21, 2026Makes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- SB 1168 · Signed into law · Sep 21, 2026Orders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
- AB 2469 · Signed into law · Sep 21, 2026Bars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- AB 2619 · Signed into law · Sep 21, 2026Requires urban water suppliers to count data center demand in annual water supply assessments
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Irvine?
- Data Center Fact Check tracks 2 data center projects in Irvine as of November 2026. Of those, 2 operating.
- What is the biggest data center in Irvine?
- By announced capacity, the biggest data center in Irvine is Centersquare LAX5 (Los Angeles), announced at 17 MW. It is operating.
- How much power do data centers in Irvine use?
- The 2 projects tracked in Irvine have announced about 25 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Irvine." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ca-irvine