AB 93: Requires data centers to report expected and annual water use
Official title: Water resources: data centers
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Vetoed as of Oct 11, 2025. The official record says: Vetoed by Governor.
- Filed (done)
- In committee (done)
- Passed one chamber (done)
- Passed both chambers (done)
- Signed into law (not reached)
- In effect (not reached)
- Vetoed (current stage)
What it does
Reporting duty
Applies to: data centers (California)
“When applying to a city for a renewal of a business license, equivalent instrument, or permit, a person who owns or operates a data center shall self-certify, under penalty of perjury, on the renewal application, that they have provided the data center's water supplier with a report of annual water use.”
SEC. 2, Business and Professions Code Sec. 16000.4(c)(3), AB 93 enrolled text
Disclosure
Applies to: data centers (California)
“Prior to applying to a county for an initial business license, equivalent instrument, or permit, a person who owns or operates a data center shall provide its water supplier, under penalty of perjury, an estimate of the expected water use.”
SEC. 3, Business and Professions Code Sec. 16100.4(c)(1), AB 93 enrolled text
Definition · threshold 10 kW
Applies to: data centers (California)
“For purposes of this section, "data center" means a room, or portion of a room, in a building used primarily to house information technology equipment that serves a total information technology equipment load greater than 10 kilowatts and 20 watts per square foot of conditioned floor area.”
SEC. 2, Business and Professions Code Sec. 16000.4(a), AB 93 enrolled text
Certification
Applies to: data centers (California)
“As part of adopting any efficiency standard pursuant to this chapter, the department may identify different tiers of data centers, as defined in Sections 16000.4 and 16100.4 of the Business and Professions Code, based on factors affecting water consumption, and appropriate standards for each data center tier.”
SEC. 4, Water Code Sec. 10609.35, AB 93 enrolled text
Disclosure
Applies to: data centers (California)
“Prior to applying to a city for an initial business license, equivalent instrument, or permit, a person who owns or operates a data center shall provide its water supplier, under penalty of perjury, an estimate of the expected water use.”
SEC. 2, Business and Professions Code Sec. 16000.4(c)(1), AB 93 enrolled text
Who it touches
No project we track is matched to this bill or order: its rules do not reach them, or a check found it does not apply.
Other projects we track in California (90), not affected
- Amazon Web Services Gilroy data centerUnder construction
- AVAIO Digital Perseus, Pittsburg Technology Park Phase IApproved
- Centersquare LAX3 (Los Angeles)Operating
- Centersquare LAX4 (Los Angeles)Operating
- Centersquare LAX5 (Los Angeles)Operating
- Colovore SJC01Operating
- Colovore SJC02Operating
- CoreSite LA1 (One Wilshire), Los AngelesOperating
- CoreSite LA2, Los AngelesOperating
- CoreSite LA3, Los AngelesOperating
- CoreSite Santa Clara Campus (SV3-SV8)Operating
- CoreSite SV1Operating
- CoreSite SV2Operating
- CoreSite SV9, Santa ClaraOperating
- Csquare SFO1Operating
- Csquare SFO2Operating
- Csquare SFO3Operating
- Csquare SFO4Operating
- CyrusOne Santa Clara data center (Sequoia, SCV1)Operating
- DataBank/Goodman LAX2, VernonUnder construction
- DataBank LAX1 (Los Angeles)Operating
- DataBank SAN1 (San Diego)Operating
- DataBank SNA1 (Irvine)Operating
- DataBank SNA2 (Irvine)Operating
- Digital Realty BUR10 (Burbank)Operating
- Digital Realty Lafayette Data Center, Santa ClaraApproved
- Digital Realty LAX10 (Los Angeles)Operating
- Digital Realty LAX11 (El Segundo)Operating
- Digital Realty LAX12 (El Segundo)Operating
- Digital Realty OAK10 (Oakland)Operating
- Digital Realty SC1 (Santa Clara)Operating
- Digital Realty SFO10, San FranciscoOperating
- Digital Realty SFO12 (365 Main), San FranciscoOperating
- Digital Realty SJC10Operating
- Digital Realty SJC14 (Santa Clara)Operating
- Digital Realty SJC15 (Santa Clara)Operating
- Digital Realty SJC16 (Santa Clara)Operating
- Digital Realty SJC29 (Santa Clara)Operating
- Digital Realty SJC30 (Santa Clara)Operating
- Digital Realty SJC31 (Santa Clara)Operating
- Digital Realty SJC34 (Santa Clara)Operating
- Digital Realty SJC35 (Santa Clara)Operating
- Digital Realty SJC37, Santa ClaraUnder construction
- EdgeCore Laurelwood Data CenterUnder construction
- Element Critical Silicon Valley SV1, SunnyvaleOperating
- Equinix Corvin Drive CampusOperating
- Equinix Great Oaks South Data Center (SV1)Under construction
- Equinix LA4 (Los Angeles)Operating
- Equinix LA7 (Los Angeles)Operating
- Equinix SV10 (Silicon Valley)Operating
- Equinix SV11 (Silicon Valley)Operating
- Equinix SV18 (Silicon Valley)Operating
- Equinix SV1 (Great Oaks Campus)Operating
- Evocative SJC11Operating
- Evocative SJC3Operating
- Evocative SJC7Operating
- GI Partners Bowers Data CenterApproved
- Hurricane Electric Fremont 2Operating
- Link Logistics southeast Sacramento data center (proposed)Proposed
- Manchester/Edgemoor NAVWAR Old Town Campus data center concept, San DiegoProposed
- Menlo Digital Charlotte Drive data center, San JoseIn permitting
- Menlo Equities 300 Holger Way data center conversion, San JoseApproved
- Microsoft San Jose data center (Alviso)Under construction
- Mission College Data CenterStage not known
- Nautilus Stockton 1 floating data centerOperating
- NorthTown Park Data Center (GIC San Jose)In permitting
- NTT Sacramento campus (CA1, CA2, CA3)Operating
- NTT Silicon Valley data center (SV1)Operating
- Prime Data Centers Los Angeles (LAX01), VernonOperating
- Prime Data Centers Sacramento campus (SMF01 and SMF02)Expanding
- Prime SJC03 (2215 Martin Avenue)Proposed
- Prime SJC04 (1231 Comstock)Approved
- Prologis Silver Creek Data CenterIn permitting
- QTS SacramentoOperating
- QTS Santa ClaraOperating
- STACK Infrastructure SVY02A, Santa ClaraUnder construction
- STACK SVY01 campus, San JoseExpanding
- STACK SVY03A Data Center Campus, HaywardApproved
- STACK Trade Zone ParkUnder construction
- Stream Data Centers Santa Clara I / II (Santa Clara)Operating
- Stream Data Centers Santa Clara III (Santa Clara)Operating
- Stream Data Centers Santa Clara IV (Santa Clara)Operating
- Stream Data Centers Santa Clara VI (Santa Clara)Operating
- Stream Data Centers Santa Clara V (Santa Clara)Operating
- T5@Los Angeles (T5@LA), El SegundoOperating
- Vantage Data Centers Santa Clara Campus (Santa Clara)Operating
- Vantage Santa Clara I campus (CA1)Operating
- Vantage Santa Clara II campus (CA2, McLaren)Operating
- Vantage Santa Clara III data center (CA3)Under construction
- Walsh Data CenterStage not known
Who acted
- Primary sponsorPapanAssembly
Timeline
Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.
- · AssemblyIntroduced.Stage: Filed
- · AssemblyAmended in Assembly.Stage: In committee
- · AssemblyAmended in Assembly.
- · AssemblyAmended in Assembly.
- · SenateAmended in Senate.Stage: Passed one chamber
- · SenateAmended in Senate.
- · SenateAmended in Senate.
- · SenateAmended in Senate.
- · SenatePassed in Senate.
- · AssemblySenate amendments concurred in. To Engrossing and Enrolling. (Ayes 59. Noes 16. Page 3288.)Stage: Passed both chambers
- · AssemblyEnrolled.
- Enrolled and presented to the Governor at 4 p.m.
- Vetoed by Governor.Stage: Vetoed
- Consideration of Governor's veto pending.
- · AssemblyConsideration of Governor's veto stricken from file.
More from California
- SB 887 · Signed into lawLets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- AB 2383 · Signed into lawRequires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- AB 2469 · Signed into lawBars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- SB 57 · Signed into lawOrders a state study of data center costs for other customers
- SB 1298 · Died or failedWould have let the Energy Commission exempt data center backup generation plants up to 150 MW from powerplant certification; died in the Assembly
Sources
- 1AB 93 (2025-2026) - Water resources: data centers - Enrolled text
California Legislative InformationTier 1 · Open the source - 2
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "AB 93: Requires data centers to report expected and annual water use." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/ca-2025-ab-93
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page