CaliforniaAssembly2025-2026 Regular SessionBill
AB 1577: Requires data centers to report energy use to the Energy Commission
Official title: Data centers: reporting
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Signed into law as of Sep 21, 2026. The official record says: signed into law.
- Filed (done)
- In committee (done)
- Passed one chamber (done)
- Passed both chambers (done)
- Signed into law (current stage)
- In effect (not reached)
What it does
We have not quoted its provisions yet. The official text has them.
Who it touches
No project we track is matched to this bill or order: its rules do not reach them, or a check found it does not apply.
Other projects we track in California (90), not affected
- Amazon Web Services Gilroy data centerUnder construction
- AVAIO Digital Perseus, Pittsburg Technology Park Phase IApproved
- Centersquare LAX3 (Los Angeles)Operating
- Centersquare LAX4 (Los Angeles)Operating
- Centersquare LAX5 (Los Angeles)Operating
- Colovore SJC01Operating
- Colovore SJC02Operating
- CoreSite LA1 (One Wilshire), Los AngelesOperating
- CoreSite LA2, Los AngelesOperating
- CoreSite LA3, Los AngelesOperating
- CoreSite Santa Clara Campus (SV3-SV8)Operating
- CoreSite SV1Operating
- CoreSite SV2Operating
- CoreSite SV9, Santa ClaraOperating
- Csquare SFO1Operating
- Csquare SFO2Operating
- Csquare SFO3Operating
- Csquare SFO4Operating
- CyrusOne Santa Clara data center (Sequoia, SCV1)Operating
- DataBank/Goodman LAX2, VernonUnder construction
- DataBank LAX1 (Los Angeles)Operating
- DataBank SAN1 (San Diego)Operating
- DataBank SNA1 (Irvine)Operating
- DataBank SNA2 (Irvine)Operating
- Digital Realty BUR10 (Burbank)Operating
- Digital Realty Lafayette Data Center, Santa ClaraApproved
- Digital Realty LAX10 (Los Angeles)Operating
- Digital Realty LAX11 (El Segundo)Operating
- Digital Realty LAX12 (El Segundo)Operating
- Digital Realty OAK10 (Oakland)Operating
- Digital Realty SC1 (Santa Clara)Operating
- Digital Realty SFO10, San FranciscoOperating
- Digital Realty SFO12 (365 Main), San FranciscoOperating
- Digital Realty SJC10Operating
- Digital Realty SJC14 (Santa Clara)Operating
- Digital Realty SJC15 (Santa Clara)Operating
- Digital Realty SJC16 (Santa Clara)Operating
- Digital Realty SJC29 (Santa Clara)Operating
- Digital Realty SJC30 (Santa Clara)Operating
- Digital Realty SJC31 (Santa Clara)Operating
- Digital Realty SJC34 (Santa Clara)Operating
- Digital Realty SJC35 (Santa Clara)Operating
- Digital Realty SJC37, Santa ClaraUnder construction
- EdgeCore Laurelwood Data CenterUnder construction
- Element Critical Silicon Valley SV1, SunnyvaleOperating
- Equinix Corvin Drive CampusOperating
- Equinix Great Oaks South Data Center (SV1)Under construction
- Equinix LA4 (Los Angeles)Operating
- Equinix LA7 (Los Angeles)Operating
- Equinix SV10 (Silicon Valley)Operating
- Equinix SV11 (Silicon Valley)Operating
- Equinix SV18 (Silicon Valley)Operating
- Equinix SV1 (Great Oaks Campus)Operating
- Evocative SJC11Operating
- Evocative SJC3Operating
- Evocative SJC7Operating
- GI Partners Bowers Data CenterApproved
- Hurricane Electric Fremont 2Operating
- Link Logistics southeast Sacramento data center (proposed)Proposed
- Manchester/Edgemoor NAVWAR Old Town Campus data center concept, San DiegoProposed
- Menlo Digital Charlotte Drive data center, San JoseIn permitting
- Menlo Equities 300 Holger Way data center conversion, San JoseApproved
- Microsoft San Jose data center (Alviso)Under construction
- Mission College Data CenterStage not known
- Nautilus Stockton 1 floating data centerOperating
- NorthTown Park Data Center (GIC San Jose)In permitting
- NTT Sacramento campus (CA1, CA2, CA3)Operating
- NTT Silicon Valley data center (SV1)Operating
- Prime Data Centers Los Angeles (LAX01), VernonOperating
- Prime Data Centers Sacramento campus (SMF01 and SMF02)Expanding
- Prime SJC03 (2215 Martin Avenue)Proposed
- Prime SJC04 (1231 Comstock)Approved
- Prologis Silver Creek Data CenterIn permitting
- QTS SacramentoOperating
- QTS Santa ClaraOperating
- STACK Infrastructure SVY02A, Santa ClaraUnder construction
- STACK SVY01 campus, San JoseExpanding
- STACK SVY03A Data Center Campus, HaywardApproved
- STACK Trade Zone ParkUnder construction
- Stream Data Centers Santa Clara I / II (Santa Clara)Operating
- Stream Data Centers Santa Clara III (Santa Clara)Operating
- Stream Data Centers Santa Clara IV (Santa Clara)Operating
- Stream Data Centers Santa Clara VI (Santa Clara)Operating
- Stream Data Centers Santa Clara V (Santa Clara)Operating
- T5@Los Angeles (T5@LA), El SegundoOperating
- Vantage Data Centers Santa Clara Campus (Santa Clara)Operating
- Vantage Santa Clara I campus (CA1)Operating
- Vantage Santa Clara II campus (CA2, McLaren)Operating
- Vantage Santa Clara III data center (CA3)Under construction
- Walsh Data CenterStage not known
Who acted
- SponsorAssembly Member Rebecca Bauer-Kahan
More from California
- SB 1168 · Signed into lawDirects the utilities commission to assess data center rate structures
- SB 886 · Signed into lawRequires data center interconnection tariffs that keep grid upgrade costs off other customers
- AB 2383 · Signed into lawRequires data center electricity tariffs so other customers do not pay their grid costs
- AB 1577 · Signed into lawRequires data centers of 10 MW or more to report facility, energy, water-cooling and PUE data to the Energy Commission
- AB 2619 · Signed into lawRequires urban water suppliers to count data center demand in annual water supply assessments
- SB 886 · Signed into lawMakes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
Sources
- 1AB 1577 (Bauer-Kahan), Data centers: reporting, chaptered text
California Legislative Information (leginfo.legislature.ca.gov)Tier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "AB 1577: Requires data centers to report energy use to the Energy Commission." Bill Watch. Updated 2026-11-13. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/ca-2025-26-ab-1577
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page