CaliforniaAssembly2025-2026 Regular SessionBill
AB 1577: Requires data centers of 10 MW or more to report facility, energy, water-cooling and PUE data to the Energy Commission
Official title: Data centers: reporting
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Signed into law as of Sep 21, 2026. The official record says: signed into law.
- Filed (done)
- In committee (done)
- Passed one chamber (done)
- Passed both chambers (done)
- Signed into law (current stage)
- In effect (not reached)
What it means for a household (draft rating)
Unclear for households. The bill requires data center owners to send facility and energy data to the Energy Commission each year.
"The commission shall annually publish the information submitted pursuant to subdivision (b) in an anonymized and aggregated format on its internet website."Public Resources Code Sec. 25302.10(d), chaptered text
We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.
What it does
Reporting duty
Applies to: data center owners or operators, to the Energy Commission (California)
“The commission shall establish a process for the owner or operator of a data center to submit all of the following information to the commission at least annually following energization, disaggregated by month over the reporting period unless otherwise specified by the commission.”
Public Resources Code Sec. 25302.10(b)(2)
Definition · threshold 10 MW
Applies to: data centers in California (California)
“"Data center" does not include a facility with an electrical capacity of less than 10 megawatts.”
Public Resources Code Sec. 25302.10(a)(2)(B)
Reporting duty
Applies to: data center owners or operators, to the Energy Commission (California)
“The commission shall establish a process for the owner or operator of a data center to submit all of the following information to the commission upon energization of the data center and following any substantive change to information previously submitted pursuant to this paragraph…”
Public Resources Code Sec. 25302.10(b)(1)
Reporting duty
Applies to: the Energy Commission, in the Integrated Energy Policy Report (California)
“Beginning with the 2029 integrated energy policy report required pursuant to subdivision (a) of Section 25302, and in subsequent biennial reports required pursuant to subdivision (a) of Section 25302 thereafter as determined by the commission, the commission shall include an assessment of electrical load trends for data centers.”
Public Resources Code Sec. 25302.10(c)
Disclosure
Applies to: the Energy Commission, to the public (California)
“The commission shall annually publish the information submitted pursuant to subdivision (b) in an anonymized and aggregated format on its internet website.”
Public Resources Code Sec. 25302.10(d)
Who it touches (80)
Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026AVAIO Digital Perseus, Pittsburg Technology Park Phase I
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon Web Services Gilroy data center
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 98 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 98 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Centersquare LAX5 (Los Angeles)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 17.3 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 17.3 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026CoreSite SV9, Santa Clara
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 34 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 34 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Csquare SFO1
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 34.5 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 34.5 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Csquare SFO2
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 43.2 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 43.2 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Csquare SFO4
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 43.1 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 43.1 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026CyrusOne Santa Clara data center (Sequoia, SCV1)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 67.5 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 67.5 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank/Goodman LAX2, Vernon
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 32 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 32 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Digital Realty Lafayette Data Center, Santa Clara
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 66 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 66 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Digital Realty SJC37, Santa Clara
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 48 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 48 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026EdgeCore Laurelwood Data Center
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Element Critical Silicon Valley SV1, Sunnyvale
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 10 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 15 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix Great Oaks South Data Center (SV1)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026GI Partners Bowers Data Center
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 72 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 72 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Link Logistics southeast Sacramento data center (proposed)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 50 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 50 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Menlo Digital Charlotte Drive data center, San Jose
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99.7 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99.7 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Menlo Equities 300 Holger Way data center conversion, San Jose
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 20 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 20 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Microsoft San Jose data center (Alviso)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Mission College Data Center
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 60 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 60 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026NTT Sacramento campus (CA1, CA2, CA3)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 52.7 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 52.7 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026NTT Silicon Valley data center (SV1)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 16 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 16 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026NorthTown Park Data Center (GIC San Jose)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 97.3 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 97.3 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Prime Data Centers Los Angeles (LAX01), Vernon
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 33 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 33 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Prime Data Centers Sacramento campus (SMF01 and SMF02)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 26 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 26 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Prologis Silver Creek Data Center
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026STACK Infrastructure SVY02A, Santa Clara
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 48 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 48 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026STACK SVY01 campus, San Jose
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 100 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 100 MW on record (not stated), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026STACK SVY03A Data Center Campus, Hayward
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 76.6 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 76.6 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026STACK Trade Zone Park
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 99 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026T5@Los Angeles (T5@LA), El Segundo
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 16.65 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 16.7 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Vantage Data Centers Santa Clara Campus (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 77 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 77 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Vantage Santa Clara I campus (CA1)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 77 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 77 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Vantage Santa Clara II campus (CA2, McLaren)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 75 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 99.8 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Vantage Santa Clara III data center (CA3)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 64 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 64 MW on record (it load), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Walsh Data Center
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission upon energization and at least annually, and excludes facilities under 10 megawatts and publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project is a California data center with 80 MW of electrical capacity on record and no excluded facility type on record, so every condition the text sets is met by a fact on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 80 MW on record (grid connection), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centersquare LAX3 (Los Angeles)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Orange County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Centersquare LAX4 (Los Angeles)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Colovore SJC01
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite LA1 (One Wilshire), Los Angeles
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite LA2, Los Angeles
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite LA3, Los Angeles
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite SV1
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite SV2
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite Santa Clara Campus (SV3-SV8)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty BUR10 (Burbank)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty LAX10 (Los Angeles)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty LAX11 (El Segundo)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty LAX12 (El Segundo)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty OAK10 (Oakland)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Alameda County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SC1 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SFO10, San Francisco
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in San Francisco County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SFO12 (365 Main), San Francisco
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in San Francisco County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC10
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC14 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC15 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC16 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC29 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC30 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC31 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC34 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty SJC35 (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Corvin Drive Campus
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project has only generator capacity on record (3 MW), and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix LA4 (Los Angeles)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix LA7 (Los Angeles)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Los Angeles County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SV1 (Great Oaks Campus)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SV10 (Silicon Valley)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SV11 (Silicon Valley)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix SV18 (Silicon Valley)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Evocative SJC7
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Hurricane Electric Fremont 2
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Alameda County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Manchester/Edgemoor NAVWAR Old Town Campus data center concept, San Diego
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes publicly funded research, public safety, publicly funded national security, publicly owned, and utility facilities; this project has 400 MW announced on record, but whether this proposed facility on a Navy campus is a publicly owned or publicly funded national security facility excluded from the section is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California; 400 MW on record (announced), threshold 10 MW (Public Resources Code Sec. 25302.10(a)(2)(B)). Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Prime SJC04 (1231 Comstock)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project has only generator capacity on record (18 MW), and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Sacramento
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Sacramento County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Santa Clara
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Santa Clara I / II (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Santa Clara III (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Santa Clara IV (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Santa Clara V (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Alameda County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers Santa Clara VI (Santa Clara)
The act requires the owner or operator of a data center with an electrical capacity of 10 megawatts or more in California to submit facility and energy information to the Energy Commission, and excludes facilities under 10 megawatts; this project is an operating data center in Santa Clara County, California, with no capacity figure on record, and its electrical capacity is not on record, so whether it reaches the 10 megawatt floor is not on record. Status part: the bill's status (signed into law on September 21, 2026) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.
““Data center” does not include a facility with an electrical capacity of less than 10 megawatts.” (Public Resources Code Sec. 25302.10(a)(2)(B))
Rule checks: Project is in California. Still to check: size: unknown, who it covers: not checked
Other projects we track in California (10), not affected
- Colovore SJC02Operating
- Csquare SFO3Operating
- DataBank LAX1 (Los Angeles)Operating
- DataBank SAN1 (San Diego)Operating
- DataBank SNA1 (Irvine)Operating
- DataBank SNA2 (Irvine)Operating
- Evocative SJC11Operating
- Evocative SJC3Operating
- Nautilus Stockton 1 floating data centerOperating
- Prime SJC03 (2215 Martin Avenue)Proposed
Who acted
- Primary sponsorRebecca Bauer-KahanAssembly
More from California
- SB 886 · Signed into lawRequires data center interconnection tariffs that keep grid upgrade costs off other customers
- AB 2383 · Signed into lawRequires data center electricity tariffs so other customers do not pay their grid costs
- AB 1577 · Signed into lawRequires data centers to report energy use to the Energy Commission
- AB 2619 · Signed into lawRequires urban water suppliers to count data center demand in annual water supply assessments
- SB 886 · Signed into lawMakes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- SB 1168 · Signed into lawOrders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
Sources
- 1AB 1577 (Bauer-Kahan), Data centers: reporting, chaptered text
California Legislative Information (leginfo.legislature.ca.gov)Tier 1 · Open the source - 2Governor Newsom signs most comprehensive data center laws in the nation (press release, September 21, 2026)
Governor of California (gov.ca.gov)Tier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "AB 1577: Requires data centers of 10 MW or more to report facility, energy, water-cooling and PUE data to the Energy Commission." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/ca-2025-ab-1577
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page