city Card
Data centers in Gilroy, California
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 1 data center project in Gilroy, California as of November 2026, totaling about 98 MW announced where a figure is published.
Gilroy has 1 tracked data center project. Their announced capacity totals about 98 MW where a figure is published. The project here is Amazon Web Services Gilroy data center, under construction. Every figure comes from the public record linked on this page.
Data center projects in Gilroy
- Amazon Web Services Gilroy data center
Under constructionGilroy98 MW announced
Who serves this place
- Not collected yet.
More places in Santa Clara County
Gilroy is part of Santa Clara County.
Nearby places
- Santa Clara40 data center projects tracked
- San Jose14 data center projects tracked
- Sunnyvale2 data center projects tracked
- Milpitas1 data center project tracked
Court cases and commission dockets in California (10)
Bills and laws in California
- AB 222 · Died or failedWould have required biannual PUE reporting to the Energy Commission and a CPUC cost-shift assessment; died in the Senate
- SB 58 · Died or failedWould have capped the sales tax on data center equipment at 2 percent for state-certified facilities; died in committee and the bill number was reused for an unrelated air quality measure
- SB 887 · Signed into law · Sep 21, 2026Lets a data center project win CEQA judicial streamlining only if it meets strict energy, water, storage and community-benefit conditions
- AB 2383 · Signed into law · Sep 21, 2026Requires data center tariffs that make data centers pay societal grid costs and a fair share of generation costs
- SB 886 · Signed into law · Sep 21, 2026Makes transmission-level data centers pay for the upgrades their interconnection triggers, with refunds capped and an early termination fee
- SB 1168 · Signed into law · Sep 21, 2026Orders the CPUC to assess rate structures that make data centers pay their share of grid costs and relieve residential ratepayers
- AB 2469 · Signed into law · Sep 21, 2026Bars local permit approval for a data center unless the applicant files a water supply assessment, water scarcity plan, projected water use and workforce disclosures, and pays for needed water system improvements
- AB 2619 · Signed into law · Sep 21, 2026Requires urban water suppliers to count data center demand in annual water supply assessments
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Gilroy?
- Data Center Fact Check tracks 1 data center project in Gilroy as of November 2026.
- What is the biggest data center in Gilroy?
- By announced capacity, the biggest data center in Gilroy is Amazon Web Services Gilroy data center, announced at 98 MW. It is under construction.
- How much power do data centers in Gilroy use?
- The 1 projects tracked in Gilroy have announced about 98 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Gilroy." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-ca-gilroy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page