Data Center Fact Check tracks 36 data center projects in Cook County, Illinois as of November 2026: 24 operating, 7 under construction and 2 expanding, totaling about 832 MW announced where a figure is published.
Cook County has 36 tracked data centers. Their announced capacity totals about 832 MW where a figure is published. Of those, 24 operating, 7 under construction and 2 expanding. Every figure comes from the public record linked on this page.
HydraVault Chicago video · 2 min 13 sec
Data center projects in Cook County
- Aligned Chicago Campus (ORD-01, ORD-02)
OperatingNorthlake48 MW announced
- Aligned Elk Grove Village Campus (ORD-03)
ProposedElk Grove Village96 MW announced
- Centersquare ORD2 (Elk Grove Village)
OperatingElk Grove Village
- CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
Under constructionMount Prospect
- Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)
OperatingHoffman Estates200 MW announced
- Compass Hoffman Estates Campus (former Sears HQ)
Under constructionHoffman Estates
- CoreSite Chicago Campus (CH1, CH2)
OperatingChicago
- DataBank ORD1 (600 South Federal)
OperatingChicago1 MW announced
- DataBank ORD2 (840 South Canal)
OperatingChicago2 MW announced
- DataBank ORD3 (Chicago)
OperatingChicago
- Digital Realty Elk Grove Village Campus (CH1/CH2/CH3)
OperatingElk Grove Village
- Digital Realty Franklin Park Campus (ORD12/ORD13/ORD14)
OperatingFranklin Park
- Digital Realty ORD10 (350 East Cermak)
OperatingChicago
- Digital Realty ORD11 (600 South Federal)
OperatingChicago
- Digital Realty ORD23 (Northlake)
OperatingNorthlake
- EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)
OperatingElk Grove Village
- Equinix CH4 (Chicago)
OperatingChicago
- Equinix CH7 (Chicago)
OperatingChicago
- Equinix Elk Grove Village Campus (CH3, CH5)
ExpandingElk Grove Village
- HydraVault Chicago
Under constructionChicago20 MW announced
- Iron Mountain CHI-1 (Des Plaines)
OperatingDes Plaines56 MW announced
- Iron Mountain Data Centers Iron Mountain Chicago (Chicago)
OperatingChicago
- Metro Edge IMD1 (Illinois Medical District)
ApprovedChicago
- Microsoft Elk Grove Village Campus
Under constructionElk Grove Village
- Microsoft Hoffman Estates Campus
ExpandingHoffman Estates
- Microsoft Northlake Data Center (CH1)
OperatingNorthlake
- Prime ORD Chicago Campus
Under constructionElk Grove Village180 MW announced
- QTS Chicago Mega Data Center
OperatingChicago125 MW announced
- Serverfarm CH1 (840 South Canal)
OperatingChicago32 MW announced
- STACK CHI01 (Elk Grove Village)
OperatingElk Grove Village
- STACK CHI02
AnnouncedElk Grove Village36 MW announced
- Stream Chicago I (Elk Grove Village)
OperatingElk Grove Village
- Stream Chicago II (Elk Grove Village)
OperatingElk Grove Village
- Stream ORDC Campus
Under constructionElk Grove Village
- T5@Chicago (Chicago I and II)
OperatingElk Grove Village
- T5@CHI III Northlake
Under constructionNorthlake36 MW announced
Who serves this place
- Not collected yet.
A data center is proposed in Cook County
2 projects here are at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Cook County
Cook County is part of Illinois.
Cities and towns
- Chicago13 data center projects tracked
- Des Plaines1 data center project tracked
- Elk Grove Village13 data center projects tracked
- Franklin Park1 data center project tracked
- Hoffman Estates3 data center projects tracked
- Mount Prospect1 data center project tracked
- Northlake4 data center projects tracked
Nearby places
- DuPage County6 data center projects tracked
- Kendall County6 data center projects tracked
- Lake County2 data center projects tracked
- Sangamon County2 data center projects tracked
- DeKalb County1 data center project tracked
- Macon County1 data center project tracked
- Will County1 data center project tracked
Taxes and budget over time
As published by the county, not adjusted for inflation. Projections are labeled.
Total property tax revenue
| FY 2024 | $670.5 million |
|---|---|
| FY 2023 | $672.1 million |
Real property tax rate
| 2023 | 0.384 USD per 100 USD of assessed value |
|---|---|
| 2022 | 0.431 USD per 100 USD of assessed value |
Tax breaks and payments
2020 · STACK CHI01 (Elk Grove Village)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for STACK CHI01 (Elk Grove Village)2020 · T5@Chicago (Chicago I and II)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for T5@Chicago (Chicago I and II)2021 · QTS Chicago Mega Data Center
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for QTS Chicago Mega Data Center2021 · Digital Realty Elk Grove Village Campus (CH1/CH2/CH3)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Digital Realty Elk Grove Village Campus (CH1/CH2/CH3)2021 · Microsoft Hoffman Estates Campus
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Microsoft Hoffman Estates Campus2021 · Microsoft Northlake Data Center (CH1)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Microsoft Northlake Data Center (CH1)2020 · Microsoft Elk Grove Village Campus
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Microsoft Elk Grove Village Campus2021 · Aligned Chicago Campus (ORD-01, ORD-02)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Aligned Chicago Campus (ORD-01, ORD-02)2020 · CoreSite Chicago Campus (CH1, CH2)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for CoreSite Chicago Campus (CH1, CH2)2020 · Digital Realty Franklin Park Campus (ORD12/ORD13/ORD14)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Digital Realty Franklin Park Campus (ORD12/ORD13/ORD14)2023 · Serverfarm CH1 (840 South Canal)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Serverfarm CH1 (840 South Canal)2023 · Metro Edge IMD1 (Illinois Medical District)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Metro Edge IMD1 (Illinois Medical District)2023 · EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)2023 · Prime ORD Chicago Campus
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Prime ORD Chicago Campus2023 · Aligned Elk Grove Village Campus (ORD-03)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Aligned Elk Grove Village Campus (ORD-03)2024 · Equinix Elk Grove Village Campus (CH3, CH5)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Equinix Elk Grove Village Campus (CH3, CH5)2021 · CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
Property tax classification incentive (Cook County Class 6b); Village resolutions supporting the application
All tax records for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)2025 · Centersquare ORD2 (Elk Grove Village)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Centersquare ORD2 (Elk Grove Village)2025 · EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for EdgeConneX Chicago Campus (CHI01/CHI02/CHI03)2024 · Iron Mountain CHI-1 (Des Plaines)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Iron Mountain CHI-1 (Des Plaines)2025 · HydraVault Chicago
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for HydraVault Chicago2024 · T5@CHI III Northlake
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for T5@CHI III Northlake
Court cases and commission dockets in Illinois (3)
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 4004 · In committee · May 22, 2026Would create the Data Center Water Transparency and Aquifer Protection Act
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
- SB 3830 · In committee · May 22, 2026Would establish the data center self-direct program and related data center provisions
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Cook County?
- Data Center Fact Check tracks 36 data center projects in Cook County as of November 2026. Of those, 24 operating, 7 under construction and 2 expanding.
- What is the biggest data center in Cook County?
- By announced capacity, the biggest data center in Cook County is Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus), announced at 200 MW. It is operating.
- How much power do data centers in Cook County use?
- The 36 projects tracked in Cook County have announced about 832 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1Annual Comprehensive Financial Report for the fiscal year ended November 30, 2024
Cook County, IllinoisTier 1 · Open the source - 2Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Open the source - 3
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Cook County." Last checked 2026-11-13. Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-il-cook
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page