Project File
HydraVault Chicago
Chicago,Cook County,IllinoisUnder constructionFirst public 2025Filing entity: HydraVault LLCLast checked Nov 9, 2026
HydraVaultDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
6 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
HydraVault Chicago is a under-construction data center project in Chicago, Cook County, Illinois. HydraVault is named as operator. It was first public in 2025. It was announced at 20 MW.
HydraVault Chicago is an under-construction data center project in Chicago, Cook County, Illinois. HydraVault is named as operator. It was announced at 20 MW. All six of the core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Chicago, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
HydraVault Chicago video · 2 min 13 sec
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Timeline
- · New projectFirst public record of HydraVault ChicagoUnder construction
- · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for HydraVault LLCState sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
Who's involved
- Developer and operatorHydraVault
Public records
3 records found so far. 7 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Decided · Mar 20, 2026Commonwealth Edison Company, changes to new service requests for large demand project applicants or customers and revisions to Rider DE
- Utility commission · Pending before the commissionInvestigation of possible ratepayer protections and cost recovery mechanisms for servicing large demand project applicants or customers of Commonwealth Edison Company
Questions people ask
- Where is HydraVault Chicago?
- HydraVault Chicago is a data center project in Chicago, Cook County, Illinois.
- Who operates HydraVault Chicago?
- HydraVault is named as the operator of HydraVault Chicago.
- How big is HydraVault Chicago?
- HydraVault Chicago was announced at 20 MW of capacity.
- What stage is HydraVault Chicago?
- HydraVault Chicago is under construction. It was first public in 2025.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Captured 2026-11-09 · Open the source - 2ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
Illinois Commerce CommissionTier 1 · Captured 2026-11-08 · Open the source - 3Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
Capitol News IllinoisTier 3 · Captured 2026-11-08 · Open the source - 4Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
Illinois Commerce Commission (docket document)Tier 1 · Captured 2026-11-08 · Open the source - 5ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
Citizens Utility BoardTier 4 · Captured 2026-11-08 · Open the source - 6HydraVault Secures Construction Permit for Downtown Chicago’s First Purpose-Built AI Facility
HydraVaultTier 4 · Captured 2026-11-09 · Open the source - 7HydraVault: A Data Center built for Intelligence
HydraVaultTier 4 · Captured 2026-11-09 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page