Data Center Fact Check tracks 13 data center projects in Chicago, Illinois as of November 2026: 11 operating, 1 approved and 1 under construction, totaling about 180 MW announced where a figure is published.
Chicago has 13 tracked data centers. Their announced capacity totals about 180 MW where a figure is published. Of those, 11 operating, 1 approved and 1 under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.
HydraVault Chicago video · 2 min 13 sec
Data center projects in Chicago
- CoreSite Chicago Campus (CH1, CH2)
OperatingChicago
- DataBank ORD1 (600 South Federal)
OperatingChicago1 MW announced
- DataBank ORD2 (840 South Canal)
OperatingChicago2 MW announced
- DataBank ORD3 (Chicago)
OperatingChicago
- Digital Realty ORD10 (350 East Cermak)
OperatingChicago
- Digital Realty ORD11 (600 South Federal)
OperatingChicago
- Equinix CH4 (Chicago)
OperatingChicago
- Equinix CH7 (Chicago)
OperatingChicago
- HydraVault Chicago
Under constructionChicago20 MW announced
- Iron Mountain Data Centers Iron Mountain Chicago (Chicago)
OperatingChicago
- Metro Edge IMD1 (Illinois Medical District)
ApprovedChicago
- QTS Chicago Mega Data Center
OperatingChicago125 MW announced
- Serverfarm CH1 (840 South Canal)
OperatingChicago32 MW announced
Who serves this place
- Not collected yet.
More places in Cook County
Chicago is part of Cook County.
Nearby places
- Elk Grove Village13 data center projects tracked
- Northlake4 data center projects tracked
- Hoffman Estates3 data center projects tracked
- Des Plaines1 data center project tracked
- Franklin Park1 data center project tracked
- Mount Prospect1 data center project tracked
Tax breaks and payments
2021 · QTS Chicago Mega Data Center
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for QTS Chicago Mega Data Center2020 · CoreSite Chicago Campus (CH1, CH2)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for CoreSite Chicago Campus (CH1, CH2)2023 · Serverfarm CH1 (840 South Canal)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Serverfarm CH1 (840 South Canal)2023 · Metro Edge IMD1 (Illinois Medical District)
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for Metro Edge IMD1 (Illinois Medical District)2025 · HydraVault Chicago
Sales and use tax exemptions and credits (20 ILCS 605/605-1025)
State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).
All tax records for HydraVault Chicago
Court cases and commission dockets in Illinois (3)
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 4004 · In committee · May 22, 2026Would create the Data Center Water Transparency and Aquifer Protection Act
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
- SB 3830 · In committee · May 22, 2026Would establish the data center self-direct program and related data center provisions
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Chicago?
- Data Center Fact Check tracks 13 data center projects in Chicago as of November 2026. Of those, 11 operating, 1 approved and 1 under construction.
- What is the biggest data center in Chicago?
- By announced capacity, the biggest data center in Chicago is QTS Chicago Mega Data Center, announced at 125 MW. It is operating.
- How much power do data centers in Chicago use?
- The 13 projects tracked in Chicago have announced about 180 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Chicago." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-il-chicago
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page