QTS Chicago Mega Data Center

Chicago,Cook County,IllinoisOperatingFirst public 2016Last checked Nov 8, 2026

QTSDeveloper and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

QTS Chicago Mega Data Center is an operating data center project in Chicago, Cook County, Illinois. QTS is named as operator. It was first public in 2016. It was announced at 125 MW.

QTS Chicago Mega Data Center is an operating data center project in Chicago, Cook County, Illinois. QTS is named as operator. It was announced at 125 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Chicago, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

QTS Chicago video · 2 min 10 sec

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

125 MWAnnounced capacity
1Public records we have found
1Tax agreement on record

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Aerial view of QTS Chicago Mega Data Center in Chicago, Cook County, Illinois, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Cook County, Illinois.See every project on the map

Timeline

  1. · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for Quality Technology Service (QTS)State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...
  2. · New projectFirst public record of QTS Chicago Mega Data CenterOperating

Bills and laws in Illinois

All 28 in Bill Watch

Who's involved

  • Developer and operatorQTS

Power

Capacity, as announced or filed

  • 125 MW · Sep 2019 · what the figure measures is not stated

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is QTS Chicago Mega Data Center?
QTS Chicago Mega Data Center is a data center project in Chicago, Cook County, Illinois.
Who operates QTS Chicago Mega Data Center?
QTS is named as the operator of QTS Chicago Mega Data Center.
How big is QTS Chicago Mega Data Center?
QTS Chicago Mega Data Center was announced at 125 MW of capacity.
What stage is QTS Chicago Mega Data Center?
QTS Chicago Mega Data Center is operating. It was first public in 2016.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    QTS Chicago - 2800 S. Ashland Ave.
    QTS Data Centers
    Tier 4 · Captured 2026-11-08 · Open the source
  3. 3
    QTS looks to expand data center campus in Chicago, Illinois
    Data Center Dynamics
    Tier 3 · Captured 2026-11-08 · Open the source
  4. 4
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source