Data centers in Northlake, Illinois

Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.

Data Center Fact Check tracks 4 data center projects in Northlake, Illinois as of November 2026: 3 operating and 1 under construction, totaling about 84 MW announced where a figure is published.

Northlake has 4 tracked data centers. Their announced capacity totals about 84 MW where a figure is published. Of those, 3 operating and 1 under construction. Every project we track here is listed below, with the public records behind it. Every figure comes from the public record linked on this page.

Aligned Chicago video · 2 min 16 sec

Full project file: Aligned Chicago Campus (ORD-01, ORD-02)

4Data center projects we track

Data center projects in Northlake

Who serves this place

  • Not collected yet.

More places in Cook County

Northlake is part of Cook County.

Nearby places

Tax breaks and payments

  • 2021 · Microsoft Northlake Data Center (CH1)

    Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).

    All tax records for Microsoft Northlake Data Center (CH1)
  • 2021 · Aligned Chicago Campus (ORD-01, ORD-02)

    Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).

    All tax records for Aligned Chicago Campus (ORD-01, ORD-02)
  • 2024 · T5@CHI III Northlake

    Sales and use tax exemptions and credits (20 ILCS 605/605-1025)

    State sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benefit at 6.25 percent of the investment commitment (report footnote, MOU table).

    All tax records for T5@CHI III Northlake

Court cases and commission dockets in Illinois (3)

Bills and laws in Illinois

All 28 in Bill Watch

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Questions people ask

How many data centers are in Northlake?
Data Center Fact Check tracks 4 data center projects in Northlake as of November 2026. Of those, 3 operating and 1 under construction.
What is the biggest data center in Northlake?
By announced capacity, the biggest data center in Northlake is Aligned Chicago Campus (ORD-01, ORD-02), announced at 48 MW. It is operating.
How much power do data centers in Northlake use?
The 4 projects tracked in Northlake have announced about 84 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.

Sources

  1. 1
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Northlake." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-il-northlake

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page