Aligned Chicago Campus (ORD-01, ORD-02)
Northlake,Cook County,IllinoisOperatingFirst public 2021Last checked Nov 8, 2026
Aligned Data CentersDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Aligned Chicago Campus (ORD-01, ORD-02) is an operating data center project in Northlake, Cook County, Illinois. Aligned Data Centers is named as operator. It was first public in 2021. It was announced at 48 MW.
Aligned Chicago Campus (ORD-01, ORD-02) is an operating data center project in Northlake, Cook County, Illinois. Aligned Data Centers is named as operator. It was announced at 48 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Northlake, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
Aligned Chicago video · 2 min 16 sec
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

The land, to scale
Timeline
- · New projectFirst public record of Aligned Chicago Campus (ORD-01, ORD-02)Operating
- · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for Aligned Data CentersState sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
Who's involved
- Developer and operatorAligned Data Centers
Power
Capacity, as announced or filed
- 170 MW · Apr 2021 · grid connection
- 48 MW · ORD-01Apr 2022 · what the figure measures is not stated
- 108 MW · Apr 2022 · grid connection
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordQuestions people ask
- Where is Aligned Chicago Campus (ORD-01, ORD-02)?
- Aligned Chicago Campus (ORD-01, ORD-02) is a data center project in Northlake, Cook County, Illinois.
- Who operates Aligned Chicago Campus (ORD-01, ORD-02)?
- Aligned Data Centers is named as the operator of Aligned Chicago Campus (ORD-01, ORD-02).
- How big is Aligned Chicago Campus (ORD-01, ORD-02)?
- Aligned Chicago Campus (ORD-01, ORD-02) was announced at 48 MW of capacity. The site covers 18.5 acres.
- What stage is Aligned Chicago Campus (ORD-01, ORD-02)?
- Aligned Chicago Campus (ORD-01, ORD-02) is operating. It was first public in 2021.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Captured 2026-11-09 · Open the source - 2Aligned Breaks Ground on Chicago Hyperscale Data Center Campus
Aligned Data CentersTier 4 · Captured 2026-11-08 · Open the source - 3Aligned Launches Chicago Hyperscale Data Center Campus and Breaks Ground on Second Adjacent Facility
Aligned Data CentersTier 4 · Captured 2026-11-08 · Open the source - 4U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page