Skip to content

Project File

T5@CHI III Northlake

Northlake,Cook County,IllinoisUnder constructionLast checked Nov 8, 2026

T5Developer and operator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Still to confirm: Electric utility
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

T5@CHI III Northlake is a under-construction data center project in Northlake, Cook County, Illinois. T5 is named as operator. It was announced at 36 MW.

T5@CHI III Northlake is an under-construction data center project in Northlake, Cook County, Illinois. T5 is named as operator. It was announced at 36 MW. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Northlake, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

T5@CHI III Northlake video · 2 min 7 sec

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

36 MWAnnounced capacity
1Public records we have found
1Tax agreement on record

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Aerial view of T5@CHI III Northlake in Northlake, Cook County, Illinois, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Cook County, Illinois.See every project on the map

Timeline

  1. · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for T5@Chicago III, LPState sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...

Bills and laws in Illinois

All 28 in Bill Watch

Who's involved

  • Developer and operatorT5

Power

Capacity, as announced or filed

  • 36 MW · Oct 2026 · what the figure measures is not stated

Public records

1 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is T5@CHI III Northlake?
T5@CHI III Northlake is a data center project in Northlake, Cook County, Illinois.
Who operates T5@CHI III Northlake?
T5 is named as the operator of T5@CHI III Northlake.
How big is T5@CHI III Northlake?
T5@CHI III Northlake was announced at 36 MW of capacity.
What stage is T5@CHI III Northlake?
T5@CHI III Northlake is under construction.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Data Center Investment Program 2025 Annual Report
    Illinois Department of Commerce and Economic Opportunity
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    T5 data center in Illinois topped out
    Data Center Dynamics
    Tier 3 · Captured 2026-11-08 · Open the source
  3. 3
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page