Project File
Digital Realty ORD23 (Northlake)
Northlake,Cook County,IllinoisOperatingFirst public 2026Last checked Nov 11, 2026
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Digital Realty ORD23 (Northlake) is an operating data center project in Northlake, Cook County, Illinois. It was first public in 2026. No site capacity figure is published for this project.
Digital Realty ORD23 (Northlake) is an operating data center project in Northlake, Cook County, Illinois. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Northlake, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Digital Realty ORD23 (Northlake)Operating
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Digital Realty ORD23 (Northlake)?
- Digital Realty ORD23 (Northlake) is a data center project in Northlake, Cook County, Illinois.
- What stage is Digital Realty ORD23 (Northlake)?
- Digital Realty ORD23 (Northlake) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Digital Realty data center locations (operator’s own list)
Digital RealtyTier 2 · Captured 2026-11-10 · Open the source · Archived copy
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page