Project File

Digital Realty ORD11 (600 South Federal)

Chicago,Cook County,IllinoisOperatingLast checked Nov 14, 2026

Digital RealtyOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

4 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Electric utility
  • Still to confirm: Capacity
  • Still to confirm: First public date
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

Digital Realty ORD11 (600 South Federal) is an operating data center project in Chicago, Cook County, Illinois. Digital Realty is named as operator. No site capacity figure is published for this project.

Digital Realty ORD11 (600 South Federal) is an operating data center project in Chicago, Cook County, Illinois. Digital Realty is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Chicago, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

2Public records we have found

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Latest from the newswire

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of Digital Realty ORD11 (600 South Federal) in Chicago, Cook County, Illinois, captured 2019
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2019Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Cook County, Illinois.See every project on the map

Bills and laws in Illinois

All 28 in Bill Watch

Who's involved

Public records

2 records found so far. 8 kinds of record are still being collected.

See every record

Questions people ask

Where is Digital Realty ORD11 (600 South Federal)?
Digital Realty ORD11 (600 South Federal) is a data center project in Chicago, Cook County, Illinois.
Who operates Digital Realty ORD11 (600 South Federal)?
Digital Realty is named as the operator of Digital Realty ORD11 (600 South Federal).
What stage is Digital Realty ORD11 (600 South Federal)?
Digital Realty ORD11 (600 South Federal) is operating.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
    Illinois Commerce Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  2. 2
    Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
    Capitol News Illinois
    Tier 3 · Captured 2026-11-08 · Open the source
  3. 3
    Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
    Illinois Commerce Commission (docket document)
    Tier 1 · Captured 2026-11-08 · Open the source
  4. 4
    ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
    Citizens Utility Board
    Tier 4 · Captured 2026-11-08 · Open the source
  5. 5
    ORD11 Data Center | 600 South Federal Street | Digital Realty
    Digital Realty
    Tier 4 · Captured 2026-11-09 · Open the source
  6. 6
    EIA Form 861, Service Territory file, 2025 (final)
    U.S. Energy Information Administration
    Tier 1 · Captured 2026-11-11 · Open the source · Archived copy

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page