Project File
Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)
Hoffman Estates,Cook County,IllinoisOperatingFirst public 2026Last checked Nov 14, 2026
Compass DatacentersOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: First public date
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus) is an operating data center project in Hoffman Estates, Cook County, Illinois. Compass Datacenters is named as operator. It was first public in 2026. It was announced at 200 MW.
Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus) is an operating data center project in Hoffman Estates, Cook County, Illinois. Compass Datacenters is named as operator. It was announced at 200 MW. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Hoffman Estates, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)Operating
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
Who's involved
- OperatorCompass Datacenters
Public records
0 records found so far. 9 kinds of record are still being collected.
Questions people ask
- Where is Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)?
- Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus) is a data center project in Hoffman Estates, Cook County, Illinois.
- Who operates Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)?
- Compass Datacenters is named as the operator of Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus).
- How big is Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)?
- Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus) was announced at 200 MW of capacity.
- What stage is Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus)?
- Compass Datacenters Chicago Campus (Hoffman Estates; 200 MW campus) is operating. It was first public in 2026.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Compass Datacenters data center locations (operator’s own list)
Compass DatacentersTier 2 · Captured 2026-11-10 · Open the source - 2
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page