Project File
STACK CHI01 (Elk Grove Village)
Elk Grove Village,Cook County,IllinoisOperatingFirst public 2020Filing entity: STACK InfrastructureLast checked Nov 9, 2026
STACK InfrastructureOperator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
4 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: First public date
- Still to confirm: Capacity
- Still to confirm: Electric utility
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
STACK CHI01 (Elk Grove Village) is an operating data center project in Elk Grove Village, Cook County, Illinois. STACK Infrastructure is named as operator. It was first public in 2020. No site capacity figure is published for this project.
STACK CHI01 (Elk Grove Village) is an operating data center project in Elk Grove Village, Cook County, Illinois. STACK Infrastructure is named as operator. No site capacity figure is published for this project. 4 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Elk Grove Village, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Timeline
- · New projectFirst public record of STACK CHI01 (Elk Grove Village)Operating
- · Tax dealTax agreement approved: Sales and use tax exemptions and credits (20 ilcs 605/605-1025) for STACK InfrastructureState sales and use tax exemptions on qualifying data center equipment under the Data Center Investment Program (20 ILCS 605/605-1025); exemption certificates run in five-year renewable increments up to 20 years. DCEO estimates the benef...
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
Who's involved
- OperatorSTACK Infrastructure
Public records
1 records found so far. 8 kinds of record are still being collected.
See every recordQuestions people ask
- Where is STACK CHI01 (Elk Grove Village)?
- STACK CHI01 (Elk Grove Village) is a data center project in Elk Grove Village, Cook County, Illinois.
- Who operates STACK CHI01 (Elk Grove Village)?
- STACK Infrastructure is named as the operator of STACK CHI01 (Elk Grove Village).
- What stage is STACK CHI01 (Elk Grove Village)?
- STACK CHI01 (Elk Grove Village) is operating. It was first public in 2020.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Data Center Investment Program 2025 Annual Report
Illinois Department of Commerce and Economic OpportunityTier 1 · Captured 2026-11-09 · Open the source - 2STACK Infrastructure Announces New 36MW Data Center in Chicago
STACK InfrastructureTier 4 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page