CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
Mount Prospect,Cook County,IllinoisUnder constructionFirst public 2021Filing entity: TUR Ventures LLCLast checked Nov 9, 2026
CloudHQDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: Capacity
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus) is a under-construction data center project in Mount Prospect, Cook County, Illinois. CloudHQ is named as operator. It was first public in 2021. No site capacity figure is published for this project.
CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus) is an under-construction data center project in Mount Prospect, Cook County, Illinois. CloudHQ is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Mount Prospect, Cook County, Illinois. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Timeline
- · DecisionVillage of Mount Prospect: Approved (resolution approving the Public Improvements Agreement adopted) (development agreement) for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
- · FilingFiled with Village of Mount Prospect: development agreement for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
- · DecisionVillage of Mount Prospect: Approved (major PUD amendment adopted, 5-0 with one absent) (rezoning) for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)6811
- · FilingFiled with Village of Mount Prospect: rezoning for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)6811
- · DecisionVillage of Mount Prospect: Approved (resolution recommending future Class 6B renewal adopted) for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
- · FilingFiled with Village of Mount Prospect for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
- · DecisionVillage of Mount Prospect: Approved (resolution supporting the Class 6b application adopted) for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
- · FilingFiled with Village of Mount Prospect for CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)
Bills and laws in Illinois
- HB 5826 · Filed · Oct 19, 2026Requires hourly energy accounting and clean certificates for covered data centers
- SB 2181 · In committee · May 22, 2026Would require annual energy and water reporting by Illinois data centers
- SB 3120 · In committee · May 22, 2026Would tie the state data center incentive to a water stewardship strategy
- SB 3030 · In committee · May 22, 2026Would require cryptocurrency mining facilities to use noise-reduction techniques
- SB 4016 · In committee · May 22, 2026Would set environmental, water and energy rules for hyperscale data centers
- SB 3761 · In committee · May 22, 2026Requires data center disclosures and creates a clean energy self-direct program
Who's involved
- Developer and operatorCloudHQ
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Village of Mount Prospect, 6634
- Buildings
- 3 buildings
- Floor area
- 566,767 sq ft (gross floor area per building, as proposed)
- Stated in the filing
- 252 MW (three data centers of 84 MW each, as proposed at preliminary approval)
Village of Mount Prospect, 6811
- Stated in the filing
- $100 million projected TIF increment over the remaining life of the South Mount Prospect TIF; stated as "more than $100 million", rowed at the stated floor
- Stated in the filing
- 450 full-time jobs (up to 450, at average salaries of $78,000)
- Stated in the filing
- $2.5 billion
- Stated in the filing
- 6,000,000 gallons per year (amended plan, stated as "under 6 million"; reduced 84 percent from 40 million gallons per year)
- Buildings
- 2 buildings
Public records
9 records found so far. 5 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Decided · Mar 20, 2026Commonwealth Edison Company, changes to new service requests for large demand project applicants or customers and revisions to Rider DE
- Utility commission · Pending before the commissionInvestigation of possible ratepayer protections and cost recovery mechanisms for servicing large demand project applicants or customers of Commonwealth Edison Company
Questions people ask
- Where is CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)?
- CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus) is a data center project in Mount Prospect, Cook County, Illinois.
- Who operates CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)?
- CloudHQ is named as the operator of CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus).
- What stage is CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus)?
- CloudHQ Mount Prospect Campus (Mount Prospect Technology Campus) is under construction. It was first public in 2021.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Cloud HQ Data Center | Village of Mount Prospect
Village of Mount ProspectTier 1 · Captured 2026-11-09 · Open the source - 2Village Board Minutes, October 28, 2025 | Village of Mount Prospect
Village of Mount ProspectTier 1 · Captured 2026-11-09 · Open the source - 3ICC looks to develop consumer protection framework amid increase in large energy demand (press release)
Illinois Commerce CommissionTier 1 · Captured 2026-11-08 · Open the source - 4Regulators OK ComEd's plan to increase deposit costs for large-load projects like data centers
Capitol News IllinoisTier 3 · Captured 2026-11-08 · Open the source - 5Verified Petition to Intervene of the Citizens Utility Board, ICC Docket No. 26-0364
Illinois Commerce Commission (docket document)Tier 1 · Captured 2026-11-08 · Open the source - 6ComEd customers could be on hook for billions in data center-related costs, according to consumer advocates' review of utility's records
Citizens Utility BoardTier 4 · Captured 2026-11-08 · Open the source - 7U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source