Data centers in Virginia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 231 data center projects in Virginia as of November 2026: 130 operating, 65 stage not known and 14 under construction, totaling about 3,504 MW announced where a figure is published.
Virginia has 231 tracked data centers. Their announced capacity totals about 3,504 MW where a figure is published. Of those, 130 operating, 14 under construction and 9 proposed; the stage of the other 65 is not known yet. Every figure comes from the public record linked on this page.
QTS Ashburn video · 2 min 18 sec
Data center projects in Virginia
- 11751 Meadowville Owner LLC c/o GFH Capital Ltd
OperatingChester
- 1501 Moran Road Development Owner LLC
Stage not knownSterling
- 21110 Ridgetop Circle LLC
OperatingSterling
- 21571 Beaumeade Circle LLC
OperatingAshburn
- 22810-22860 International Drive LLC
OperatingSterling
- 22995 Wilder Court LLC
OperatingSterling
- Aerospace Data Facility - East
Stage not knownFort Belvoir
- Aligned Data Centers Ashburn (Uunet Drive)
Operating180 MW announced
- Aligned Data Centers Sterling (Relocation Drive)
Operating72 MW announced
- Amazon Cosner Tech Campus
Under construction
- Amazon Data Services IAD-870
Stage not known
- Amazon Data Services Inc - DCA-060
Stage not known
- Amazon Data Services Inc - IAD-104/105/106
Stage not known
- Amazon Data Services Inc IAD-205/307/317/612/612x
Stage not knownManassas
- Amazon IAD-10 (45630 Severn Way, Sterling)
Operating
- Amazon IAD-114 (20945 Loudoun County Parkway, Ashburn)
OperatingAshburn
- Amazon IAD-116 (45781 Maries Road, Sterling)
OperatingSterling
- Amazon IAD-120 (23825 Erins Run Drive, Sterling)
OperatingSterling
- Amazon IAD-12 (22630 Dulles Summit Ct, Sterling)
Operating
- Amazon IAD-124 (24214 Quail Ridge Lane, Aldie)
ProposedAldie
- Amazon IAD-140 (22890 Platform Plaza, Sterling)
OperatingSterling
- Amazon IAD-144 (22945 International Drive, Sterling)
OperatingSterling
- Amazon IAD-146 (22370 and 22420 Kipper Drive, Sterling)
OperatingSterling
- Amazon IAD-150 (25430 Sutton Bay Plaza, Chantilly)
Operating
- Amazon IAD-156 (43920 Lone Cedar Lane, Chantilly)
Operating
- Amazon IAD-161 (44254 Import Plaza, Ashburn)
Operating
- Amazon IAD-163 (21099 Atlantic Boulevard, Sterling)
OperatingSterling
- Amazon IAD-169 (21320 Beaumeade Circle, Ashburn)
OperatingAshburn
- Amazon IAD-170 (42090 Reeds Farm Lane, Stone Ridge)
ProposedStone Ridge
- Amazon IAD-180 (43975 Light Speed Plaza, Sterling)
ProposedSterling
- Amazon IAD-215 (44725 Gigabit Plaza, Ashburn)
OperatingAshburn
- Amazon IAD-243 (45130 Waxpool Road, Sterling)
Proposed
- Amazon IAD-50 (21271 Smith Switch Rd, Ashburn)
OperatingAshburn
- Amazon IAD-51 (45220 Prologis Plaza, Sterling)
Operating
- Amazon IAD-57 (28755 Relocation Drive, Sterling)
Operating
- Amazon IAD-61 (43673 John Mosby Highway, Chantilly)
OperatingChantilly
- Amazon IAD-62 (42949 Fadeley Lane, Sterling)
OperatingSterling
- Amazon IAD-667 (20575 Celtic Park Drive, Leesburg)
OperatingLeesburg
- Amazon IAD-6 (Devin Shafron Drive, Ashburn)
OperatingAshburn
- Amazon IAD-90 (45900 Pathfinder Way, Sterling)
OperatingSterling
- Amazon Web Services Culpeper campuses
Operating
- Amazon Web Services Fairfax County campuses
Operating
- Amazon Web Services Fauquier County campus
Under construction
- Amazon Web Services Louisa County campus
In permitting
- Amazon Web Services Prince William County campuses
Operating
- Amazon Web Services Stafford County campus
In permitting
- Anthem CDC 3
Stage not knownHarrisonburg
- Bank of America Sandston Data Center
OperatingSandston
- Bank of America Villa Park Data Center
Operating
- Belmont Innovation Campus
Stage not knownAshburn
Who serves this place
- Not collected yet.
Counties and cities in Virginia
Counties
- Caroline County1 data center project tracked
- Chesterfield County6 data center projects tracked
- Culpeper County6 data center projects tracked
- Fairfax County22 data center projects tracked
- Fauquier County4 data center projects tracked
- Frederick County1 data center project tracked
- Hanover County2 data center projects tracked
- Harrisonburg city1 data center project tracked
- Henrico County12 data center projects tracked
- Loudoun County128 data center projects tracked
- Louisa County1 data center project tracked
- Manassas city3 data center projects tracked
- Mecklenburg County10 data center projects tracked
- Prince William County25 data center projects tracked
- Russell County1 data center project tracked
- Spotsylvania County2 data center projects tracked
- Stafford County3 data center projects tracked
- Virginia Beach city1 data center project tracked
- Wise County1 data center project tracked
Cities and towns
- Ashburn58 data center projects tracked
- Sterling38 data center projects tracked
- Manassas10 data center projects tracked
- Sandston9 data center projects tracked
- Herndon6 data center projects tracked
- Boydton5 data center projects tracked
- Chantilly4 data center projects tracked
- Leesburg4 data center projects tracked
- McLean4 data center projects tracked
- Reston4 data center projects tracked
- Chester3 data center projects tracked
- Culpeper3 data center projects tracked
- South Hill2 data center projects tracked
- Aldie1 data center project tracked
- Arcola1 data center project tracked
- Ashland1 data center project tracked
- Chase City1 data center project tracked
- Fort Belvoir1 data center project tracked
- Glen Allen1 data center project tracked
- Harrisonburg1 data center project tracked
- La Crosse1 data center project tracked
- Lebanon1 data center project tracked
- Middletown1 data center project tracked
- Remington1 data center project tracked
- Springfield1 data center project tracked
- Stone Ridge1 data center project tracked
- Vienna1 data center project tracked
- Virginia Beach1 data center project tracked
- Warrenton1 data center project tracked
- Wise1 data center project tracked
For homeowners
What the projects here mean if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
Property tax
Data center equipment paid $684.8 million in Loudoun County property tax in fiscal 2024.Applies to 4 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)
Comes to the communityQTS Ashburn mega data center:A 2025 appeal cut this campus's main parcel assessment about 5 percent, to $485.3 million.
Comes to the communityMicrosoft data center campus (Boydton):County records report a 2010 deal returning 90 percent of Microsoft personal property tax as a grant for 20 years.
Goes both ways
Tax breaks
The county gives no property tax break in our records, but Virginia exempts qualifying data center equipment from state sales tax through 2035.Applies to 2 projects:Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun County
Goes both waysVirginia exempts qualifying data center equipment from state sales tax through 2035; the county adds no break in our records.Applies to 3 projects:CyrusOne Sterling campus (Northern Virginia)Microsoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Goes both waysMicrosoft data center campus (Boydton):The county reported $57,719,970 abated in fiscal 2023 across two unnamed entities; Virginia also exempts qualifying data center equipment from state sales tax.
Goes both ways
Money for schools and services
No community payment or fee for this campus is in our records.Applies to 3 projects:CyrusOne Sterling campus (Northern Virginia)Microsoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Not known yetThe county reports data centers supplied 38 percent of its general fund revenue.Applies to 2 projects:Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun County
Comes to the communityMicrosoft data center campus (Boydton):No community payment or fee distribution for this campus is in our records.
Not known yet
Electricity bill
Microsoft data center campus (Boydton):The average cooperative home paid $150.41 a month in 2025, up from $136.76 in 2016, not adjusted for inflation.
Not known yetThe average Dominion home paid $157.75 a month in 2025, up from $122.88 in 2016, not adjusted for inflation.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Not known yet
Water
The water provider for this campus is not in our records yet.Applies to 2 projects:CyrusOne Sterling campus (Northern Virginia)Microsoft Leesburg data center campus (Compass Creek)
Not known yetLoudoun Water serves the unincorporated county, where this campus sits; campus water use is not published.Applies to 2 projects:Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun County
Comes from the communityMicrosoft data center campus (Boydton):Federal money expanded Boydton wastewater plant for the campus; whose drinking water the campus uses is not documented.
Goes both waysQTS Ashburn mega data center:This campus's air permit lists 11 evaporative cooling towers; its water supplier and water use are not in public records we found.
Not known yet
Jobs
Job counts for this campus are not in our records yet.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)Microsoft data center campus (Boydton)
Not known yetQTS Ashburn mega data center:QTS advertises 40,000 jobs nationwide this year, but publishes no job count for this campus.
Not known yet
Next door: height, setbacks, noise
County rules put data center buildings 200 feet from home lots and cap noise at 55 decibels at homes.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Local ruleMicrosoft data center campus (Boydton):No county siting rule for this campus is in our records; its permits cap generator testing hours instead.
Not known yet
Your say
Supervisors voted in public on March 18, 2025 to end by-right data centers in most zoning districts.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
How to take partMicrosoft data center campus (Boydton):The campus rezonings passed the Board of Supervisors in a public vote on August 10, 2020.
How to take part
Tax breaks and payments
Retail sales and use tax exemption (Va. Code Section 58.1-609.3(18))
Exempts computer equipment or enabling software purchased or leased for use in a qualifying Virginia data center from the state retail sales and use tax, July 1, 2010 through June 30, 2035. The statute covers "computer equipment or enabling software purchased or leased for the processing, storage, retrieval, or communication of data," including chillers and backup generators. It applies to the data center operator and its tenants collectively.
2010 · Microsoft data center campus (Boydton)
Economic stimulus grants (rebates of taxes paid)
A grant of 90 percent of the company's personal property tax for 20 years, plus a grant of 100 percent of the county machinery and tools tax for 5 years.
All tax records for Microsoft data center campus (Boydton)2024 · Microsoft Leesburg data center campus (Compass Creek)
Business personal property tax rate commitment (data center computer equipment)
The Town will establish a tax rate applicable to computer equipment and peripherals associated with the operation of a data center, applying to all such equipment within the Town, at a rate not to exceed $0.75 per $100 of assessed value, and will not raise that rate for at least five years from the date Microsoft becomes subject to the Town's personal property tax. The Commission on Local Government report states the Town's rate otherwise stood at $1.00 per $100.
All tax records for Microsoft Leesburg data center campus (Compass Creek)2024 · Microsoft Leesburg data center campus (Compass Creek)
Economic Development Incentive Payment (interlocal payment under the Voluntary Settlement Agreement, Section 6)
Following the effective date of annexation, Loudoun County pays the Town an Economic Development Incentive Payment of $2 million per year, on or before July 1, increased by 3 percent each year. For each fiscal year the County makes the payment, the Town charges all water and sewer customers the in-town rates, inside or outside Town boundaries, with no out-of-town surcharge (Agreement Sections 5.4, 5.5 and 6).
All tax records for Microsoft Leesburg data center campus (Compass Creek)
Local rules for data centers
In effect · Zoning · Adopted Sep 22, 2026
Data Center Opportunity Zone Overlay District shrunk and closed to expansion; special use permit required outside the overlay
Prince William County adopted a zoning text amendment restructuring its Data Center Opportunity Zone Overlay District: the overlay boundary is reduced and redefined to parcels meeting one or more of five county eligibility pathways in Sec. 32-509.3(2), the overlay is closed to any future expansion, and new data center proposals outside the overlay in the B-1, O(L), O(M), O(H), O(F), M-1, M-2 and M/T districts (and designated office/industrial land bays in PBD and PMD districts) must proceed through the Special Use Permit process. Parcels remaining inside the overlay that meet an eligibility pathway keep by-right permission.
In effect · Zoning · Adopted May 11, 2026
Data center is a special exception use, not a by right use
In the county use table, Data center is listed as SE, meaning a special exception permit is required, in two district columns, and the supplemental standards at Section 7.1-7 are written around that special exception process. Data center does not appear as a permitted by right use in the table rows read. The table text extraction jumbles column order, so the two districts carrying the SE marking are not named here; the M-1 Industrial district is the district applied to the Boydton campus area.
In effect · Other · Adopted May 11, 2026
Data center buffers, fencing, and equipment screening standards
Data center sites must be buffered from public roadways and from natural and managed resource areas such as parks, wildlife areas, forestland, and timberland, using at least a Buffer Type A planting, with walls, fences, or berms allowed only as a supplement to landscaping. Chain link fencing visible from a street is prohibited, barbed wire and razor wire may not be visible from the public right of way or nearby homes, and electrical substations and mechanical equipment must be screened under the landscaping and screening section.
In effect · Other · Adopted May 11, 2026
Extra application studies for data centers that are high energy use facilities
A data center that qualifies as a high energy use facility must add two items to its special exception application: an acoustical site assessment covering homes and schools within 500 feet of the property line, and a formal statement from the electric utility on substations and transmission voltage needed to serve the site. County staff may also require a site impact assessment covering water use and water sources, prime farmland, forest cover loss, and visibility from parks and historic sites within a half mile.
In effect · Noise · Adopted May 11, 2026
Data center noise limit of 70 dBA at the property line, with sound studies on demand
Noise from all activities at a data center development may not exceed 70 dBA measured at the property line shared with non data center uses. The limit does not apply to demolition work, to sudden unforeseen events that require emergency vehicles or temporary emergency generator use, or to generator testing inside the allowed testing window. The Zoning Administrator may require a sound study at any time, due within 15 days and taken during peak cooling operations, and the operator must act at once to comply if the study shows an exceedance.
In the news
JLARC: Data center tax break accounts for 60% of Virginia’s incentive spending
Virginia Mercury
Commentary: The blue tsunami has a message for Virginia Democrats on data centers and campaign finance
Virginia Mercury
‘We don’t want it’: Voter backlash against data centers consumes midterm elections
Virginia Mercury
Recent cases and dockets in Virginia
- Utility commission · Pending before the commissionPetition of Northern Virginia Electric Cooperative for approval of revisions to the Terms and Conditions of Rate Schedules LP-1, DPS, HV-1 and HV-2
- Utility commission · Pending before the commissionSupplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)
- Utility commission · Pending before the commissionApplication of Kentucky Utilities Company d/b/a Old Dominion Power Company for an adjustment of electric base rates
- Utility commission · DecidedApplication of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia
- Utility commission · Pending before the commissionApplication of Virginia Electric and Power Company for approval of its large-load connection queue process standards
- Utility commission · In effectLarge Power Dedicated Facilities Contract Service Schedule LPD-2
- Utility commission · DecidedApplication of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
- Utility commission · Pending before the commissionPetition of Appalachian Power Company For approval of Revisions to the Terms and Conditions of Rate Schedule L.P.S.
- Utility commission · Pending before the commissionPetition of Mecklenburg Electric Cooperative for approval to implement a new Large Power Service Rate Schedule (Schedule LPS-U)
- Utility commission · In effectPetition of Rappahannock Electric Cooperative For approval to implement a new Large Power Dedicated Facilities Rate Schedule
Bills and laws in Virginia
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- SB 553 · Signed into law · Apr 13, 2026Requires monthly water use reports for data centers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 496 · Signed into law · Apr 13, 2026Requires monthly water use reports for data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
- SB 94 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 507 · Signed into law · Apr 8, 2026Sets Tier 4 generator emission limits in data center air permits
- SB 619 · Died or failed · Mar 10, 2026Requires a state certificate to operate large power users
- HB 591 · Passed one chamber · Mar 9, 2026Sets state policy for responsible data center operation
- HB 897 · Died or failed · Mar 3, 2026Adds clean energy conditions to the data center tax break
- HB 155 · Died or failed · Feb 18, 2026Requires a state certificate to operate large power users
- SB 465 · Died or failed · Feb 17, 2026Adds efficiency conditions to the data center tax break
- SB 466 · In committee · Feb 12, 2026Bars recovery of data center grid costs from others
- HB 503 · In committee · Feb 12, 2026Bars shifting data center power costs to other customers
- HB 641 · In committee · Feb 11, 2026Taxes data center land to fund conservation
- HB 961 · Ended or expired · Feb 11, 2026Limits the data center tax break to new equipment cycles
- HB 784 · Ended or expired · Feb 11, 2026Publishes names and tax breaks of data center operators
- SB 417 · In committee · Feb 10, 2026Requires reclaimed water for grant funded data centers
- HB 1515 · In committee · Feb 6, 2026Pauses local data center approvals until grid backlog clears
- SB 552 · Died or failed · Feb 2, 2026Requires state review of large data center site assessments
- SB 1449 · Vetoed · May 2, 2025Would have required site assessments before local data center approvals
- HB 1601 · Vetoed · May 2, 2025Requires site assessments before local data center approvals
- SB 960 · Died or failed · Feb 22, 2025Makes the SCC end ratepayer subsidies for data centers
- SB 1243 · Ended or expired · Jan 27, 2025Bars shifting data center distribution costs to other customers
Newswire for Virginia
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Officials we track for Virginia
The lawmakers and local officials whose recorded jurisdiction is Virginia, with the bills and votes we have on record for each.
- Abigail SpanbergerGovernor
- Adam P. EbbinState Senator · 39
- Atoosa R. ReaserState Delegate · 27
- Betsy B. CarrState Delegate · 78
- Dan HelmerState Delegate · 10
- Danica A. RoemState Senator · 30
- David A. ReidState Delegate · 28
- Elizabeth R. GuzmanState Delegate · 22
- JJ SinghState Delegate · 26
- John C McAuliffState Delegate · 30
- Josh ThomasState Delegate · 21
- Karen Keys-GamarraState Delegate · 7
- Luke E. TorianState Delegate · 24
- Sam RasoulState Delegate · 38
Questions people ask
- How many data centers are in Virginia?
- Data Center Fact Check tracks 231 data center projects in Virginia as of November 2026. Of those, 130 operating, 14 under construction and 9 proposed; the stage of the other 65 is not known yet.
- What is the biggest data center in Virginia?
- By announced capacity, the biggest data center in Virginia is TECfusions Clarksville, announced at 300 MW. It is under construction.
- How much power do data centers in Virginia use?
- The 231 projects tracked in Virginia have announced about 3,504 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
- 1
- 2
- 3Loudoun County Board of Equalization 2025 Annual Report
Loudoun County Board of EqualizationTier 1 · Open the source - 4County lines up incentive package, The Mecklenburg Sun, July 14, 2010
The Mecklenburg Sun (SoVaNow)Tier 3 · Open the source - 5Code of Virginia, Section 58.1-609.3, subdivision 18 (data center sales and use tax exemption)
Virginia Legislative Information SystemTier 1 · Open the source - 6Data Center Retail Sales & Use Tax Exemption
Virginia Economic Development PartnershipTier 1 · Open the source - 7Annual Comprehensive Financial Report, Year Ended June 30, 2023
County of Mecklenburg, VirginiaTier 1 · Open the source - 8QTS Ashburn Mega Data Center Achieves LEED Green Building Certification (445,000 sq ft, 32 MW), 2019-08-21
QTS Realty Trust (PR Newswire release, republished by ThomasNet)Tier 4 · Open the source - 9CyrusOne's New Data Center - Where Hyper Cloud Scale Meets Hyper Data Center Speed (Sterling II completion, 30 MW)
CyrusOne Inc. (Business Wire)Tier 4 · Open the source - 10CyrusOne Announces New Leadership in Northern Virginia to Support Public Sector Growth (8 data centers, 1.9M sq ft, Sterling campus)
CyrusOne Inc. (Business Wire)Tier 4 · Open the source - 11Enforcement Action - Order by Consent issued to Microsoft Corporation for Leesburg (IAD01-02-03-04-05) Data Center, Registration No. 74220 (draft revised 2026-08-31)
Virginia Department of Environmental QualityTier 1 · Open the source - 12
- 13Annual Drinking Water Quality Report, 2025 Consumer Confidence Report, Town of Boydton (PWSID 5117100)
Town of BoydtonTier 1 · Open the source - 14EIA Form 861 2025, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 15EIA Form 861 2016, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 16
- 17
- 18
- 19Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn, LLC (Ashburn 1: DC1 and DC2), Registration No. 74141, June 10, 2025 (combined minor New Source Review permit, with transmittal letter)
Virginia Department of Environmental QualityTier 1 · Open the source - 20QTS Commitment to Communities page (economic impact: 40,000 U.S. jobs claim)
QTS Realty Trust, LLCTier 4 · Open the source - 21Initial Title V Permit, Microsoft Corp, East Coast Data Center (Permit No. PRO-21527)
Virginia Department of Environmental QualityTier 1 · Open the source - 22
- 23Loudoun County Zoning Ordinance (official text, eReader)
Loudoun County, VirginiaTier 1 · Open the source - 24Stationary Source Permit to Construct and Operate, significant amendment (permit action 21527-15), Microsoft Corporation, East Coast Data Center
Virginia Department of Environmental QualityTier 1 · Open the source - 25
- 26
- 27Data Center Opportunity Zone Overlay District comprehensive review page (DPA2021-00020)
Prince William County Planning OfficeTier 1 · Open the source - 28Data Center Site Plan Submissions Memorandum, October 16, 2026
Prince William County Development ServicesTier 1 · Open the source - 29Mecklenburg County Planning Commission agenda packet, March 19, 2026 (includes Zoning Ordinance Draft 3-3-2026)
Mecklenburg County, VirginiaTier 1 · Open the source - 30Mecklenburg County rezones near Microsoft site
SoVaNOW (The News & Record and The Mecklenburg Sun)Tier 3 · Open the source - 31Res. No. 26-374 initiating the DCOZOD text amendment with the Part 509 text attached
Prince William CountyTier 1 · Open the source - 32Ordinance approving DPA2026-00006 (DCOZOD text amendment) 2026-09-22
Prince William CountyTier 1 · Open the source - 33Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
Virginia Commission on Local Government (Department of Housing and Community Development)Tier 1 · Open the source - 34Leesburg Town Council Approves Voluntary Settlement Agreement Related to Compass Creek Annexation
Town of Leesburg, VirginiaTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Virginia." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page