Skip to content

VirginiaSenate2026 SessionBill

SB 94: Requires site assessments before local approval of large data centers

Official title: Data centers; site assessment, sound profile of the high energy use facility

Official text

Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.

Where it stands

Signed into law as of Apr 13, 2026. The official record says: signed into law.

  1. Filed (done)
  2. In committee (done)
  3. Passed one chamber (done)
  4. Passed both chambers (done)
  5. Signed into law (current stage)
  6. In effect (not reached)

What it does

  • Exemption · threshold 100 MW

    Applies to: expansions of existing or approved facilities

    “F. This section shall not apply to a site with an existing legislative or administrative approval where an applicant is seeking an expansion or modification of an already existing or approved facility and such expansion does not exceed an additional 100 megawatts or more of electrical power.”

    Chapter 568, new Code of Virginia section 15.2-2209.4, subsection F

  • Definition · threshold 100 MW

    Applies to: high energy use facilities

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.”

    Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A

  • Site assessment · threshold 500 feet

    Applies to: new high energy use facilities

    “B. Prior to any approval of a rezoning application, special exception, or special use permit for the siting of a new HEUF, a locality shall require that an applicant perform and submit a site assessment to examine, to the extent practicable and within the timeline provided by subdivision A 7 of section 15.2-2286, the sound profile of the HEUF on residential units and schools located within 500 feet of the HEUF property boundary. A locality may also require that a site assessment examine, to the extent practicable and within the timeline provided by subdivision A 7 of section 15.2-2286, the effect of the proposed facility on (i) ground and surface water resources, (ii) agricultural resources, (iii) parks, (iv) registered historic sites, and (v) forestland on the HEUF site or immediately contiguous land.”

    Chapter 568, new Code of Virginia section 15.2-2209.4, subsection B

  • Disclosure

    Applies to: new high energy use facilities

    “C. Prior to any approval of a rezoning application, special exception, or special use permit for the siting of a new HEUF, a locality shall require that the electric utility providing retail service to the new HEUF, to the extent known and practicable and within the timeline provided by subdivision A 7 of section 15.2-2286, submit to the locality a form describing (i) any new or existing substations that will be used to serve the HEUF and (ii) the anticipated transmission voltage required to serve the HEUF.”

    Chapter 568, new Code of Virginia section 15.2-2209.4, subsection C

Who it touches (204)

Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202611751 Meadowville Owner LLC c/o GFH Capital Ltd

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 20261501 Moran Road Development Owner LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202621110 Ridgetop Circle LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 143.2 MW on record (grid connection), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aerospace Data Facility - East

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aligned Data Centers Ashburn (Uunet Drive)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 276 MW of standby generator capacity and a 180 MW announced figure that does not state what it measures, neither of which measures power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 180 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Cosner Tech Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services IAD-870

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services Inc - DCA-060

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services Inc - IAD-104/105/106

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services Inc IAD-205/307/317/612/612x

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-10 (45630 Severn Way, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 281.75 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-114 (20945 Loudoun County Parkway, Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 90 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-116 (45781 Maries Road, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 171.25 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-12 (22630 Dulles Summit Ct, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 228.75 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-120 (23825 Erins Run Drive, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 132.8 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-124 (24214 Quail Ridge Lane, Aldie)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 233 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-140 (22890 Platform Plaza, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 263.55 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-144 (22945 International Drive, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 140 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-146 (22370 and 22420 Kipper Drive, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 110 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-150 (25430 Sutton Bay Plaza, Chantilly)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 155 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-156 (43920 Lone Cedar Lane, Chantilly)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 359.4 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-161 (44254 Import Plaza, Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 401.4 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-163 (21099 Atlantic Boulevard, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 196.8 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-169 (21320 Beaumeade Circle, Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 91.2 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-170 (42090 Reeds Farm Lane, Stone Ridge)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 111.4 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-180 (43975 Light Speed Plaza, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-215 (44725 Gigabit Plaza, Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 55.6 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-243 (45130 Waxpool Road, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 411.5 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-50 (21271 Smith Switch Rd, Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 253 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-51 (45220 Prologis Plaza, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 271.2 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-57 (28755 Relocation Drive, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 78 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-6 (Devin Shafron Drive, Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 0.75 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-61 (43673 John Mosby Highway, Chantilly)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 222.1 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-62 (42949 Fadeley Lane, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 242.95 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-667 (20575 Celtic Park Drive, Leesburg)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 461.5 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-90 (45900 Pathfinder Way, Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 135 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Culpeper campuses

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Fairfax County campuses

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Fauquier County campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Louisa County campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Prince William County campuses

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Stafford County campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Anthem CDC 3

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Bank of America Sandston Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 32.234 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Bank of America Villa Park Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 33.05 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Belmont Innovation Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CLOP Ashland Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 18.5 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Capital One Knolls Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 8.975 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cardinal Energy Corporation

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cashvad Ventures LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Chirisa Digital Drive Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its only on-record capacity is a 300 MW figure that does not state what it measures, so it does not show the anticipated power to be drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 300 MW on record (not stated), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Chirisa Richmond campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 474.5 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Clean Arc Data Centers - VA-1 Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CloudHQ Manassas campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cologix ASH1

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 168.75 MW of standby generator capacity and a 120 MW announced figure that does not state what it measures, neither of which measures power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 120 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Comcast Cablevision of Virginia Incorporated

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters Ashburn campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 160 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters Northern Virginia Campuses (Loudoun County; several new campuses planned (listed as planned))

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Corporate Office Properties Trust (COPT - DC6)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Corscale Gainesville Crossing

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 326 MW on record (not stated), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne - NVA14

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Kincora

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 226.75 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA1 / NVA3 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA4 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA5 / NVA7 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA8 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA9 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Northern Virginia Data Center - Maries Road

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Northern Virginia Data Center - Shaw Road

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Sterling IX/X/XI

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Darab Ventures One Two Six LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Data Center Vint Hill LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank Data Center Culpeper LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank IAD6 (Northern Virginia)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Devlin Technology Park

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Filigree LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Loudoun Pkwy Center N LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty (Digital Loudoun 3 & 4 LLC)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty - Sterling Premiere LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC4 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC5 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC6 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC7 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Ashburn Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD12 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD14 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD24 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD35 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD36 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD37 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD38 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD39 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD40 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD44 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Manassas (Brickyard)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty VA3 (Reston)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Western Lands LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Ashburn (Beaumeade and Performance Circles)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 288.3 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Ashburn (Filigree Court)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 94.65 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Ashburn DC13 (Uunet Way)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 16 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Ashburn DC3 (Chilum Place)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 14 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Ashburn East (DC21, DC22)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 135.15 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Culpeper campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC1 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC10 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC11 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC12 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC13 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC14 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC15 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC16 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC2 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC21 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC22 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC3 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC4 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC5 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC6 (Washington, DC metro)

    The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from a retail electric utility, which require a site assessment before local approval; this project has no capacity figure on record, but whether this project is a new facility seeking such a local approval and the electrical power anticipated for it at filing is not on record. Status part: the bill's status (signed into law) makes its text operative, and no part of this decision rests on status beyond that. Text part: the decision rests on the bill's text quoted here, which sets the conditions named above.

    “A. As used in this section, "high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix LLC - DC 97

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Manassas (DC14)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Arcola Center, Loudoun County

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this campus; its on-record capacity is a 390.5 MW standby generator fleet, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Va. Code Sec. 15.2-2209.4 A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Bristow data center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 334.7 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Chesterfield Data Center (Project Peanut)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Project Loch Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Project Skye Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Stonewall Business Park, Loudoun County

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this campus; its on-record capacity is a 390.5 MW standby generator fleet, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Data Centers - Ashburn

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Data Centers Herndon

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Hanover Technology Park

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Herndon Technology Partners LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Inova Health Care Systems - IT Operations

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Data Centers Iron Mountain Manassas (Manassas)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Richmond Data Center Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is a 384 MW standby generator fleet and a 200 MW announced figure that does not state what it measures, neither of which measures power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 200 MW on record (not stated), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iskander (LC-1A) Jamshid (LC-1B) Kaveh (LC2) Lohrasp Ventures (LC3)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Kincora Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Level 3 Communications Herndon Gateway

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026MECP1 Ashburn 2 LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Meta Henrico Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 272 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Blue Ridge campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp - AVC17 Datacenter

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp - LVL Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp - LYH10 Datacenter

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp DCS - AVC09 Datacenter

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - AVC Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - AVC43 Datacenter

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - LYH03 Datacenter

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - Timber Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Fauquier County campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Gainesville campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Leesburg data center campus (Compass Creek)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this campus; its on-record capacity is a 313.5 MW standby generator fleet, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Va. Code Sec. 15.2-2209.4 A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Manassas campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft data center campus (Boydton)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this campus; its on-record capacity is a 408.05 MW standby generator fleet, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Va. Code Sec. 15.2-2209.4 A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT VA1 Ashburn (Guilford Drive)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 38 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT VA2 Ashburn (Guilford Drive)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 29.25 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT VA3 to VA7 Ashburn (Gigabit Plaza)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 303.5 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Northrop Grumman Services Corporation

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Northrop Grumman Systems Corporation

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Northrop Grumman Systems Corporation

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oath Inc.

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Peak 10 Richmond Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 4.25 MW of standby generator capacity, which does not measure power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Prince William Digital Gateway

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn 1 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn 2 (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn 3 (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn Moran (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Manassas

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 190 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Manassas 1 (Manassas)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 190 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS RIC5

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 1 (Sandston)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 2 (Sandston; listed as in development)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 3 (Sandston; listed as in development)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 5 (Sandston; listed as in development)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 240 MW on record (not stated), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026RREEF America REIT II Corp. VVV

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Remington Technology Park Limited Partnership

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026SDC Ashburn I - SE Parcel Campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026SI NVA05A LLC and SI NVA05D LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure Loudoun County campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 128.138 MW of standby generator capacity and a 144 MW announced figure that does not state what it measures, neither of which measures power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 144 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure NVA04 (Northern Virginia)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure Prince William campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 250 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sentara Healthcare

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sentinel Ashburn Nexus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sharpless Enterprises Bristow campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026StratCap

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026TECfusions Clarksville

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 300 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026The Aerospace Corporation

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026U.S. Customs and Border Protection

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Valo Park

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Center VA3 LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Ashburn Campus (Ashburn)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Ashburn I campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity rows are standby generator fleets of 333.75 MW and 60.5 MW and a 206 MW announced figure that does not state what it measures, none of which measures power drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 206 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Fredericksburg Campus (Fredericksburg)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 192 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Stafford County campus

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its only on-record capacity is a 192 MW announced figure for the announced campus that does not state what it measures, so it does not show the anticipated power to be drawn from the utility.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia; 192 MW on record (announced), threshold 100 MW (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A). Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Sterling Campus (Sterling)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers VA2 LLC

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026VeriSign Incorporated Broad Run Facility2

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Verizon Business Network Services Inc.

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vienna Cloud

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Visa USA Incorporated

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Westfax Property Owner A LP/Westfax 4-5A

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Wheeler Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Word of Grace Data Center

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Zayo Group LLC (Fairfax County)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Zayo Group LLC (Loudoun County)

    The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility at the time of filing a rezoning, special exception, or special use permit application for the siting of a new facility, and this project has no capacity figure on record and no such application on record, so whether it is a high energy use facility is not on record.

    “"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)

    Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked

Other projects we track in Virginia (27), not affected

Who acted

Timeline

Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.

  1. · SenatePrefiled and ordered printed; Offered 01-14-2026 26100739DStage: Filed
  2. · SenateReferred to Committee on S-Local GovernmentStage: In committee
  3. · SenateReported from S-Local Government committee with amendments and rereferred to Finance and Appropriations (8-Y 5-N 1-A)
  4. · SenateS-Local Government committee amendment offered
  5. · SenateReported from S-Finance and Appropriations committee with substitute (10-Y 5-N)
  6. · SenateS-Finance and Appropriations committee substitute printed 26106623D-S1
  7. · SenateIncorporates SB130 (Ebbin)
  8. · SenateRules suspended
  9. · SenateConstitutional reading dispensed Block Vote (on 1st reading) (40-Y 0-N 0-A)
  10. · SenatePassed by for the day Block Vote (Voice Vote)
  11. · SenateRead second time
  12. · SenatePassed by for the day
  13. · SenatePassed by for the day
  14. · SenatePassed by for the day
  15. · SenatePassed by for the day
  16. · SenateRead second time
  17. · SenateS-Local Government committee amendments rejected (Voice Vote)
  18. · SenateS-Finance and Appropriations committee Substitute agreed to
  19. · SenateSenator Roem amendments offered
  20. · SenateSenator Roem Amendment #1 withdrawn
  21. · SenateReading of amendment #2 waived (Voice Vote)
  22. · SenateSenator Roem Amendment #2 agreed to (24-Y 16-N 0-A)
  23. · SenateEngrossed by Senate - committee substitute as amended (Voice Vote)
  24. · SenateRead third time and passed Senate (21-Y 18-N 1-A)Stage: Passed one chamber
  25. · HousePlaced on Calendar
  26. · HouseRead first time
  27. · HouseReported from H-Counties, Cities and Towns committee with substitute (15-Y 6-N)
  28. · HouseH-Counties, Cities and Towns committee substitute printed 26108333D-H1
  29. · HouseRead second time
  30. · HouseRead third time
  31. · HouseH-Counties, Cities and Towns committee substitute agreed to
  32. · HouseEngrossed by House - H-Counties, Cities and Towns committee substitute
  33. · HousePassed House with substitute (80-Y 14-N 0-A)Stage: Passed both chambers
  34. · SenateHouse substitute rejected by Senate
  35. · HouseHouse insisted on substitute
  36. · HouseHouse requested conference committee
  37. · SenateSenate acceded to request Block Vote (40-Y 0-N 0-A)
  38. · SenateConferees appointed by Senate
  39. · SenateSenate Conferees: Roem, Srinivasan, Stanley
  40. · HouseConferees appointed by House
  41. · HouseHouse Conferees: Thomas, Convirs-Fowler, Wyatt
  42. · ConferenceConference Report released
  43. · HouseConference report agreed to by House (91-Y 4-N 0-A)
  44. · SenateConference report agreed to by Senate (29-Y 10-N 0-A)
  45. · SenateEnrolled
  46. · SenateBill text as passed Senate and House (SB94ER)
  47. · SenateSigned by President
  48. · HouseSigned by Speaker
  49. · SenateEnrolled Bill communicated to Governor on March 31, 2026
  50. · GovernorGovernor's Action Deadline 11:59 p.m., April 13, 2026
  51. · GovernorApproved by Governor-Chapter 568 (effective 7/1/2026)Stage: Signed into law
  52. · GovernorActs of Assembly Chapter text (CHAP0568)

More from Virginia

Sources

  1. 1
    SB 94 (2026), bill page and Chapter 568
    Virginia Legislative Information System (lis.virginia.gov)
    Tier 1 · Open the source
  2. 2
    Virginia Acts of Assembly 2026, Chapter 568 (Senate Bill 94, approved April 13, 2026)
    Virginia Legislative Information System
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "SB 94: Requires site assessments before local approval of large data centers." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/va-2026-sb-94

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page