Project File

DataBank IAD1 (Northern Virginia)

Ashburn,Loudoun County,VirginiaOperatingFirst public 2026Last checked Nov 12, 2026

DataBankOperator

Saved in this browser; see it under My feed. Email alerts are not available yet.

Details confirmed

Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.

5 of 6 details confirmed

  • Confirmed: County
  • Confirmed: City or address
  • Confirmed: Stage
  • Confirmed: Capacity
  • Confirmed: First public date
  • Still to confirm: Electric utility
Know the record? Send it to us

What happens next: No upcoming date is on record.

Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.

Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.

DataBank IAD1 (Northern Virginia) is an operating data center project in Ashburn, Loudoun County, Virginia. DataBank is named as operator. It was first public in 2026. It was announced at 9.9 MW.

DataBank IAD1 (Northern Virginia) is an operating data center project in Ashburn, Loudoun County, Virginia. DataBank is named as operator. It was announced at 9.9 MW. 5 of the six core facts we track for every project are confirmed on this page.

Where this project sits

This project sits in Ashburn, Loudoun County, Virginia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.

10 MWAnnounced capacity
15Public records we have found
26Backup generators, Caterpillar 3516E emergency diesel engine gen-sets, 3,000 ekW (4,393 bhp) each (EG2-1 through EG2-26), equipment previously constructed, original permit date June 1, 2022

For homeowners

What this project means if you live nearby

We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.

Newswire for Loudoun County

  1. What the record shows · November 28, 2026

    Loudoun County data centers: the complete record

  2. What the record shows · November 22, 2026

    SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days

  3. What the record shows · November 22, 2026

    PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

Aerial view of DataBank IAD1 (Northern Virginia) in Ashburn, Loudoun County, Virginia, captured 2023
Aerial image, USDA National Agriculture Imagery Program, via the USGS National Map, Public domain (USDA NAIP), captured 2023Aerial images can be older than the campus. This one shows what was on the ground when it was taken.Source: USDA National Agriculture Imagery Program, via the USGS National MapLicense: Public domain (USDA NAIP)
Site-level positionPin placed from the position we have on file, inside Loudoun County, Virginia.See every project on the map

Timeline

  1. · New projectFirst public record of DataBank IAD1 (Northern Virginia)Operating
  2. · DecisionVirginia Department of Environmental Quality: Permit to construct and operate emergency diesel engine generator sets approved; supersedes the June 1, 2022 permit (air permit) for DataBank IAD1 (Northern Virginia)73743
  3. · FilingFiled with Virginia Department of Environmental Quality: air permit for DataBank IAD1 (Northern Virginia)73743

Laws and bills that may apply here

Found by each bill's own place and size rules. Each one says who has checked it so far.

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia HB 30: Budget act item taxing data center electricity at 1.1 cents per kWh

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 9.9 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia HB 496: Requires monthly water use reports for data centers

    The act requires a water user that provides water to another person offsite to report monthly potable and reclaimed water volumes separately for a data center with an air permit issued by the Department of Environmental Quality, effective January 1, 2027; this project is a data center in Virginia with a DEQ air permit on record, so it falls in the reporting category the text sets.

    “Any water user required to register water withdrawal and use data pursuant to this subsection that provides water to another person offsite shall include in its report, submitted on its regular reporting schedule, the total volume of potable water and, reported separately, the total volume of reclaimed water provided during each month for each of the following categories: (i) a data center, as that term is defined in subdivision A 43 of § 58.1-3506, with an air permit issued by the Department and (ii) to the extent available without utility billing system modifications, (a) domestic purposes, (b) commercial and industrial purposes, separately or combined as available, and (c) all other non-categorized purposes.” (Enacted text (Chapter 623), § 62.1-44.38 C)

    Rule checks: Project is in Virginia. Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia SB 553: Requires monthly water use reports for data centers

    The act requires a water user that provides water to another person offsite to report monthly potable and reclaimed water volumes separately for a data center with an air permit issued by the Department of Environmental Quality, effective January 1, 2027; this project is a data center in Virginia with a DEQ air permit on record, so it falls in the reporting category the text sets.

    “Any water user required to register water withdrawal and use data pursuant to this subsection that provides water to another person offsite shall include in its report, submitted on its regular reporting schedule, the total volume of potable water and, reported separately, the total volume of reclaimed water provided during each month for each of the following categories: (i) a data center, as that term is defined in subdivision A 43 of § 58.1-3506, with an air permit issued by the Department and (ii) to the extent available without utility billing system modifications, (a) domestic purposes, (b) commercial and industrial purposes, separately or combined as available, and (c) all other non-categorized purposes.” (Enacted text (conference substitute 26109885D, as passed), § 62.1-44.38 C)

    Rule checks: Project is in Virginia. Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 1393: Shifts grid costs to the largest electricity customers

    The bill directs Dominion Energy Virginia to propose allocating capacity procurement and distribution infrastructure costs to its customer class with a contracted or measured demand of 25 megawatts or greater and an average load factor of 75 percent or greater, in rate proceedings commencing after January 1, 2027 and before July 1, 2033; this project's serving electric utility, its contracted or measured demand, and its average annual load factor are not on record.

    “Dominion Energy Virginia to propose to the Commission, in any proceeding to determine rates for generation and distribution services commencing after January 1, 2027, and before July 1, 2033, that certain costs related to capacity procurement requirements and distribution infrastructure investments are allocated to the utility's customer class approved to serve customers with a contracted or measured electric demand of 25 megawatts or greater and an anticipated or measured average annual electric load factor of 75 percent or greater” (LIS bill-details page for HB 1393 (2026), Summary)

    Rule checks: Project is in Virginia. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 323: Directs a state study of data center waste heat

    The act directs the Department of Energy to lead efforts to accelerate the use of waste heat from data centers in the Commonwealth, convene a work group, and report by September 1, 2026; it sets no project-level condition on an individual data center, and whether this project's waste heat is within the work group's scope is not on record.

    “Directs the Department of Energy to lead efforts to accelerate the use of waste heat from data centers in the Commonwealth by making certain findings and recommendations and convening a work group to provide expertise, assistance, and feedback on the Department's efforts.” (LIS bill-details page for HB 323 (2026), Summary As Passed)

    Rule checks: Project is in Virginia. Still to check: who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 507: Sets Tier 4 generator emission limits in data center air permits

    The section bars the Department of Environmental Quality from issuing a data center permit on an application submitted on or after July 1, 2026 unless the emission limit for each gen-set is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set; whether this project has a data center permit application submitted on or after July 1, 2026 is not on record.

    “For any application submitted for a data center on or after July 1, 2026, for a permit issued by the Department pursuant to this chapter, including coverage under any general permit, the Department shall not issue such permit unless the emission limit for each gen-set established by such permit is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set.” (Va. Code Sec. 10.1-1322.6(B) (2026, c. 397))

    Rule checks: Project is in Virginia. Still to check: who it covers: not checked

Bills and laws in Virginia

All 29 in Bill Watch

Who's involved

Power

Capacity, as announced or filed

  • 9.9 MW · it_load

From the filings

Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.

  • Virginia Department of Environmental Quality, 73743

    Backup generators
    26 Caterpillar 3516E emergency diesel engine gen-sets, 3,000 ekW (4,393 bhp) each (EG2-1 through EG2-26), equipment previously constructed, original permit date June 1, 2022
    Backup generators
    3 Caterpillar 3516C emergency diesel engine gen-sets, 2,000 ekW (2,937 bhp) each (Ref. Nos. 2A, 2B and 2S), equipment previously constructed, original permit date September 28, 2012
    Backup generators
    12 Cummins emergency gen sets with QSK78-G36 diesel engines (Generator Model: C3000D6EB), 3,000 ekW (4,316 bhp) each (EG4-1 through EG4-12), equipment to be constructed, original permit date August 4, 2025
    Backup generators
    2 Cummins emergency gen sets with QST30-G5 diesel engines (Generator Model: 1000DQFAD), 1,000 ekW (1,482 bhp) each (EG4BB1 and EG4BB2), equipment to be constructed, original permit date August 4, 2025
    Backup generators
    6 Caterpillar 3516C emergency diesel engine gen-sets, 2,000 ekW (2,937 bhp) each (Ref. Nos. 2C, 3A, 3B, 3C, 3D and 3S), equipment previously constructed, original permit date May 18, 2017
    Backup generators
    1 Caterpillar C18 emergency diesel engine gen-set, 750 ekW (1,112 bhp) (EG2BB), equipment previously constructed, original permit date June 1, 2022
    Backup generators
    5 Caterpillar 3516C emergency diesel engine gen-sets, 2,000 ekW (2,937 bhp) each (Ref. Nos. 1A, 1C, 1D, 1E and 1S), equipment previously constructed, original permit date August 5, 2010

Public records

15 records found so far. 6 kinds of record are still being collected.

See every record

Questions people ask

Where is DataBank IAD1 (Northern Virginia)?
DataBank IAD1 (Northern Virginia) is a data center project in Ashburn, Loudoun County, Virginia.
Who operates DataBank IAD1 (Northern Virginia)?
DataBank is named as the operator of DataBank IAD1 (Northern Virginia).
How big is DataBank IAD1 (Northern Virginia)?
DataBank IAD1 (Northern Virginia) was announced at 9.9 MW of capacity.
What stage is DataBank IAD1 (Northern Virginia)?
DataBank IAD1 (Northern Virginia) is operating. It was first public in 2026.

Sources

Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.

  1. 1
    Permit to Construct and Operate, DataBank Holdings Ltd, Registration No. 73743 (IAD-1, IAD-3, IAD-4)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-12 · Open the source · Archived copy
  2. 2
    Loudoun County Zoning Ordinance (official text, eReader)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  3. 3
    Land Use Considerations (county data center page)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  4. 4
    Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
    Loudoun County Planning Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
    Loudoun County
    Tier 1 · Captured 2026-11-09 · Open the source
  6. 6
    Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
    Virginia Commission on Local Government (Department of Housing and Community Development)
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Board of Supervisors Business Meeting Minutes, March 18, 2025
    Loudoun County
    Tier 1 · Captured 2026-11-07 · Open the source
  8. 8
    Loudoun County Board of Equalization 2025 Annual Report
    Loudoun County Board of Equalization
    Tier 1 · Captured 2026-11-09 · Open the source
  9. 9
    DataBank data center locations (operator’s own list)
    DataBank
    Tier 2 · Captured 2026-11-10 · Open the source · Archived copy
  10. 10
    Ashburn Campus
    DataBank
    Tier 4 · Captured 2026-11-11 · Open the source · Archived copy
  11. 11