Skip to content

VirginiaHouse of Delegates2026 SessionBill

HB 30: Budget act item taxing data center electricity at 1.1 cents per kWh

Official title: Budget Bill (2026-2028 biennium appropriations act)

Official text

Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.

Where it stands

In effect as of Jul 1, 2026. The official record says: enacted (Chapter 1, Acts of Assembly, 2026 Special Session I).

  1. Filed (done)
  2. In committee (done)
  3. Passed one chamber (done)
  4. Passed both chambers (done)
  5. Signed into law (done)
  6. In effect (current stage)

What it means for a household (draft rating)

Helps households. The budget puts a tax of $0.011 per kilowatt-hour on electricity used at each data center, paid by the operator.

"Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month."HB 30 (Chapter 1), Part 3, Item 3-5.24 A.1

We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.

What it does

  • Definition · threshold 1 MW

    Applies to: facilities taxed under Item 3-5.24 (Virginia)

    Starts: 2026-07-01. Ends: 2028-07-01.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.”

    Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)

  • Tax

    Applies to: every data center operator in Virginia (Virginia)

    Starts: 2026-07-01. Ends: 2028-07-01.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.”

    Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3)

Who it touches (231)

Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Aligned Data Centers Ashburn (Uunet Drive)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 180 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Aligned Data Centers Sterling (Relocation Drive)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 72 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-10 (45630 Severn Way, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-114 (20945 Loudoun County Parkway, Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-116 (45781 Maries Road, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-12 (22630 Dulles Summit Ct, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-120 (23825 Erins Run Drive, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-140 (22890 Platform Plaza, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-144 (22945 International Drive, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-146 (22370 and 22420 Kipper Drive, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-150 (25430 Sutton Bay Plaza, Chantilly)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-156 (43920 Lone Cedar Lane, Chantilly)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-161 (44254 Import Plaza, Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-163 (21099 Atlantic Boulevard, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-169 (21320 Beaumeade Circle, Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-215 (44725 Gigabit Plaza, Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-50 (21271 Smith Switch Rd, Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-51 (45220 Prologis Plaza, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-57 (28755 Relocation Drive, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-6 (Devin Shafron Drive, Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-61 (43673 John Mosby Highway, Chantilly)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-62 (42949 Fadeley Lane, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-667 (20575 Celtic Park Drive, Leesburg)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Amazon IAD-90 (45900 Pathfinder Way, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Bank of America Sandston Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Bank of America Villa Park Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Capital One Knolls Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026CyrusOne Sterling campus (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 30 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank IAD1 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 9.9 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank IAD2 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 3 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank IAD3 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 40 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank IAD4 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 20 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026DataBank IAD5 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 72 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix Ashburn (Beaumeade and Performance Circles)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix Ashburn DC13 (Uunet Way)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix Ashburn DC3 (Chilum Place)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Equinix Ashburn East (DC21, DC22)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Google Bristow data center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Google Stonewall Business Park, Loudoun County

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026H5 Data Centers Chantilly

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 23 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Iron Mountain Manassas campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 60 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Meta Henrico Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Microsoft Leesburg data center campus (Compass Creek)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Microsoft data center campus (Boydton)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026NTT VA1 Ashburn (Guilford Drive)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026NTT VA2 Ashburn (Guilford Drive)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026NTT VA3 to VA7 Ashburn (Gigabit Plaza)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026Peak 10 Richmond Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026QTS Ashburn 2 (Lockridge)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 75 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026QTS Ashburn 3 (Shellhorn Road)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 80 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026QTS Ashburn mega data center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 55 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Checked by AI against the bill text, not yet by a person · Nov 29, 2026STACK Infrastructure NVA01

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 17 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202611751 Meadowville Owner LLC c/o GFH Capital Ltd

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 20261501 Moran Road Development Owner LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202621110 Ridgetop Circle LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 143.2 MW on record (grid connection), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202621571 Beaumeade Circle LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 35.8 MW on record (grid connection), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202622810-22860 International Drive LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 35.8 MW on record (grid connection), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 202622995 Wilder Court LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 23.9 MW on record (grid connection), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Aerospace Data Facility - East

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Cosner Tech Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services IAD-870

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services Inc - DCA-060

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services Inc - IAD-104/105/106

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Data Services Inc IAD-205/307/317/612/612x

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-124 (24214 Quail Ridge Lane, Aldie)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project's stage on record is proposed, so whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-170 (42090 Reeds Farm Lane, Stone Ridge)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project's stage on record is proposed, so whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-180 (43975 Light Speed Plaza, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon IAD-243 (45130 Waxpool Road, Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project's stage on record is proposed, so whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Culpeper campuses

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Fairfax County campuses

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Fauquier County campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Louisa County campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of in_permitting, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Prince William County campuses

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Amazon Web Services Stafford County campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of in_permitting, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Anthem CDC 3

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Belmont Innovation Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CLOP Ashland Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has 18.5 MW on record (generator capacity) and a stage of approved, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cardinal Energy Corporation

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cashvad Ventures LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Chirisa Digital Drive Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has 300 MW on record (not stated) and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 300 MW on record (not stated), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Chirisa Richmond campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Clean Arc Data Centers - VA-1 Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CloudHQ Manassas campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Cologix ASH1

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 120 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Comcast Cablevision of Virginia Incorporated

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters Ashburn campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Compass Datacenters Northern Virginia Campuses (Loudoun County; several new campuses planned (listed as planned))

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CoreSite Reston Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 40 MW on record (not stated), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Corporate Office Properties Trust (COPT - DC6)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Corscale Gainesville Crossing

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 326 MW on record (not stated), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne - NVA14

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Kincora

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA1 / NVA3 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA4 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA5 / NVA7 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA8 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne NVA9 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Northern Virginia Data Center - Maries Road

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Northern Virginia Data Center - Shaw Road

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026CyrusOne Sterling IX/X/XI

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DP Facilities Inc South LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 45 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Darab Ventures One Two Six LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Data Center Vint Hill LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank Data Center Culpeper LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026DataBank IAD6 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Devlin Technology Park

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of approved, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Filigree LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Loudoun Pkwy Center N LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty (Digital Loudoun 3 & 4 LLC)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty - Lemur Properties LLC (VA3)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 13 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty - Porpoise Ventures LLC (VA4)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 8.6 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty - Sterling Premiere LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC4 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC5 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC6 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty ACC7 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Ashburn Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD12 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD14 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD24 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD35 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD36 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD37 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD38 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD39 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD40 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty IAD44 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty Manassas (Brickyard)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, but whether it meets the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Realty VA3 (Reston)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Digital Western Lands LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Ashburn (Filigree Court)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Culpeper campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC1 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC10 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC11 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC12 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC13 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC14 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC15 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC16 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC2 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC21 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC22 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC3 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC4 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC5 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix DC6 (Washington, DC metro)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record. Status part: the act's status (enacted, in effect from July 1, 2026) makes the tax operative for the stated period. Text part: the decision rests on the definition quoted here.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix LLC - DC 97

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Equinix Manassas (DC14)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, but whether it meets the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Arcola Center, Loudoun County

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Chesterfield Data Center (Project Peanut)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Project Loch Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of in_permitting, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Google Project Skye Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of in_permitting, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Data Centers - Ashburn

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026H5 Data Centers Herndon

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, but whether it meets the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Hanover Technology Park

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of in_permitting, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Herndon Technology Partners LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Inova Health Care Systems - IT Operations

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Data Centers Iron Mountain Manassas (Manassas)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iron Mountain Richmond Data Center Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has 384 MW on record (generator capacity) and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 200 MW on record (not stated), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Iskander (LC-1A) Jamshid (LC-1B) Kaveh (LC2) Lohrasp Ventures (LC3)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Kincora Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Level 3 Communications Herndon Gateway

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026MECP1 Ashburn 2 LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Blue Ridge campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of in_permitting, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp - AVC17 Datacenter

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp - LVL Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp - LYH10 Datacenter

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corp DCS - AVC09 Datacenter

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - AVC Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - AVC43 Datacenter

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - LYH03 Datacenter

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Corporation - Timber Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Fauquier County campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Gainesville campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Microsoft Manassas campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026NTT VA10 Gainesville

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 84 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Northrop Grumman Services Corporation

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Northrop Grumman Systems Corporation

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Northrop Grumman Systems Corporation

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Oath Inc.

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Prince William Digital Gateway

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of cancelled, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn 1 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn 2 (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn 3 (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn Moran (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Ashburn-Moran

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 4 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Manassas

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 190 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Manassas 1 (Manassas)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 190 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS RIC5

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of approved, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 1 (Sandston)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 2 (Sandston; listed as in development)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 3 (Sandston; listed as in development)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond 5 (Sandston; listed as in development)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026QTS Richmond Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 240 MW on record (not stated), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026RREEF America REIT II Corp. VVV

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Remington Technology Park Limited Partnership

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026SDC Ashburn I - SE Parcel Campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026SI NVA05A LLC and SI NVA05D LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure Loudoun County campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has 144 MW announced on record and a stage of announced, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 144 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure NVA04 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure NVA05 (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 84 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure NVA05A (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 36 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026STACK Infrastructure Prince William campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 250 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sabey Intergate.Ashburn

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 85 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sentara Healthcare

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sentinel Ashburn Nexus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Sharpless Enterprises Bristow campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of proposed, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026StratCap

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Stream Data Centers NoVA I / II (Northern Virginia)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 80 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026TECfusions Clarksville

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 300 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026The Aerospace Corporation

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026U.S. Customs and Border Protection

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Valo Park

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Center VA3 LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Ashburn Campus (Ashburn)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Ashburn I campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of operating, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 206 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Fredericksburg Campus (Fredericksburg)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 192 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Stafford County campus

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has 192 MW announced on record and a stage of announced, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 192 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers Sterling Campus (Sterling)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vantage Data Centers VA2 LLC

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026VeriSign Incorporated Broad Run Facility2

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Verizon Business Network Services Inc.

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Vienna Cloud

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Visa USA Incorporated

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Westfax Property Owner A LP/Westfax 4-5A

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Wheeler Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Word of Grace Data Center

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Yondr Northern Virginia campus (Aldie)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for at least one megawatt of electrical power and cooling; this project has no capacity figure on record and a stage of under_construction, but whether it is an operating data center meeting the one megawatt element of the definition is not established on record.

    “"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia; 96 MW on record (announced), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Zayo Group LLC (Fairfax County)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

  • Possible match, AI could not decide; waiting for a person · Nov 29, 2026Zayo Group LLC (Loudoun County)

    The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project has no capacity figure on record, so whether it meets the one megawatt element of the definition is not established on record.

    “Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))

    Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked

Who acted

More from Virginia

Sources

  1. 1
    HB 30 (2026 Special Session I), bill page: Acts of Assembly Chapter, Budget Bill
    Virginia Legislative Information System (lis.virginia.gov)
    Tier 1 · Open the source
  2. 2
    Item 3-5.24, Data Center Electricity Consumption Tax (HB 30, Chapter 1, 2026 Special Session I)
    Virginia Legislative Information System (budget.lis.virginia.gov)
    Tier 1 · Open the source
  3. 3
    Now Law, Budget Includes Record $2 Billion in New Public Education Funding, First-of-Its-Kind Energy Consumption Tax on Data Centers, and $1 Billion to Protect Virginians From Federal Cuts
    Office of the Governor of Virginia
    Tier 1 · Open the source

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "HB 30: Budget act item taxing data center electricity at 1.1 cents per kWh." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/va-2026-hb-30

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page