Project File
QTS Ashburn mega data center
Sterling,Loudoun County,VirginiaOperatingFirst public 2017Filing entity: QTS Investment Properties Ashburn, LLCLast checked Nov 9, 2026
QTSDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
6 of 6 details confirmed
- Confirmed: County
- Confirmed: City or address
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
QTS Ashburn mega data center is an operating data center project in Sterling, Loudoun County, Virginia. QTS is named as operator. It was first public in 2017. It was announced at 32 MW.
QTS Ashburn mega data center is an operating data center project in Sterling, Loudoun County, Virginia. QTS is named as operator. It was announced at 32 MW. All six of the core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Sterling, Loudoun County, Virginia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
QTS Ashburn video · 2 min 18 sec
Newswire for QTS Ashburn mega data center
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
For homeowners
What this project means if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
- Property tax
A 2025 appeal cut this campus's main parcel assessment about 5 percent, to $485.3 million.
Comes to the community - Tax breaks
Virginia exempts qualifying data center equipment from state sales tax through 2035; the county adds no break in our records.
Goes both ways - Money for schools and services
No community payment or fee for this campus is in our records.
Not known yet - Electricity bill
The average Dominion home paid $157.75 a month in 2025, up from $122.88 in 2016, not adjusted for inflation.
Not known yet - Water
This campus's air permit lists 11 evaporative cooling towers; its water supplier and water use are not in public records we found.
Not known yet - Jobs
QTS advertises 40,000 jobs nationwide this year, but publishes no job count for this campus.
Not known yet - Next door: height, setbacks, noise
County rules put data center buildings 200 feet from home lots and cap noise at 55 decibels at homes.
Local rule - Your say
Supervisors voted in public on March 18, 2025 to end by-right data centers in most zoning districts.
How to take part

The land, to scale
Timeline
- · DecisionVirginia Department of Environmental Quality: Issued; combined minor New Source Review permit to construct and operate emissions units at the Ashburn 1 campus (DC1 and DC2); combines the terms and conditions from and supersedes the permit document dated August 25, 2022 (air permit) for QTS Ashbur...Registration No. 74141
- · FilingFiled with Virginia Department of Environmental Quality: air permit for QTS Ashburn mega data centerRegistration No. 74141
- · FilingFiled with Virginia Department of Environmental Quality: stormwater permit for QTS Ashburn mega data centerVAR10J072
- · FilingFiled with Virginia Department of Environmental Quality: stormwater permit for QTS Ashburn mega data centerVAR10Q048
- · New projectFirst public record of QTS Ashburn mega data centerOperating
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia HB 30: Budget act item taxing data center electricity at 1.1 cents per kWh
The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.
“"Data center" means a facility whose primary services are to centralize the storage, management, and processing of digital data and is used to house (i) computer and network systems, including associated components such as servers, network equipment and appliances, telecommunications, and data storage systems; (ii) systems for monitoring and managing infrastructure performance; (iii) equipment used for the transformation, transmission, distribution, or management of at least one megawatt of capacity of electrical power and cooling, including substations, uninterruptible power supply systems, all electrical plant equipment, and associated air handlers; (iv) Internet-related equipment and services; (v) data communications connections; (vi) environmental controls; (vii) fire protection systems; and (viii) security systems and services. “Data center" does not include a facility whose primary function is to facilitate the provision of internet access service, a communication service as defined in § 58.1-647, or any combination thereof.” (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3))
Rule checks: Project is in Virginia; 55 MW on record (it load), threshold 1 MW (Item 3-5.24, paragraph A.2 (HB 30, Chapter 1, Part 3)). Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 1393: Shifts grid costs to the largest electricity customers
The bill directs Dominion Energy Virginia to propose allocating capacity procurement and distribution infrastructure costs to its customer class with a contracted or measured demand of 25 megawatts or greater and an average load factor of 75 percent or greater, in rate proceedings commencing after January 1, 2027 and before July 1, 2033; this project is served by Dominion Energy Virginia on record, but its contracted or measured demand and its average annual load factor are not on record.
“Dominion Energy Virginia to propose to the Commission, in any proceeding to determine rates for generation and distribution services commencing after January 1, 2027, and before July 1, 2033, that certain costs related to capacity procurement requirements and distribution infrastructure investments are allocated to the utility's customer class approved to serve customers with a contracted or measured electric demand of 25 megawatts or greater and an anticipated or measured average annual electric load factor of 75 percent or greater” (LIS bill-details page for HB 1393 (2026), Summary)
Rule checks: Project is in Virginia. Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 323: Directs a state study of data center waste heat
The act directs the Department of Energy to lead efforts to accelerate the use of waste heat from data centers in the Commonwealth, convene a work group, and report by September 1, 2026; it sets no project-level condition on an individual data center, and whether this project's waste heat is within the work group's scope is not on record.
“Directs the Department of Energy to lead efforts to accelerate the use of waste heat from data centers in the Commonwealth by making certain findings and recommendations and convening a work group to provide expertise, assistance, and feedback on the Department's efforts.” (LIS bill-details page for HB 323 (2026), Summary As Passed)
Rule checks: Project is in Virginia. Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 496: Requires monthly water use reports for data centers
The act requires a water user that provides water to another person offsite to report monthly potable and reclaimed water volumes separately for a data center with an air permit issued by the Department of Environmental Quality, effective January 1, 2027; this project is a data center in Virginia, but whether it holds an air permit issued by the Department of Environmental Quality is not on record.
“Any water user required to register water withdrawal and use data pursuant to this subsection that provides water to another person offsite shall include in its report, submitted on its regular reporting schedule, the total volume of potable water and, reported separately, the total volume of reclaimed water provided during each month for each of the following categories: (i) a data center, as that term is defined in subdivision A 43 of § 58.1-3506, with an air permit issued by the Department” (Enacted text (Chapter 623), § 62.1-44.38 C)
Rule checks: Project is in Virginia. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 507: Sets Tier 4 generator emission limits in data center air permits
The section bars the Department of Environmental Quality from issuing a data center permit on an application submitted on or after July 1, 2026 unless the emission limit for each gen-set is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set; no Department of Environmental Quality permit application for this project is on record, so whether an application was submitted on or after July 1, 2026 is not on record.
“For any application submitted for a data center on or after July 1, 2026, for a permit issued by the Department pursuant to this chapter, including coverage under any general permit, the Department shall not issue such permit unless the emission limit for each gen-set established by such permit is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set.” (Va. Code Sec. 10.1-1322.6(B) (2026, c. 397))
Rule checks: Project is in Virginia. Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia SB 553: Requires monthly water use reports for data centers
The act requires a water user that provides water to another person offsite to report monthly potable and reclaimed water volumes separately for a data center with an air permit issued by the Department of Environmental Quality, effective January 1, 2027; this project is a data center in Virginia, but whether it holds an air permit issued by the Department of Environmental Quality is not on record.
“Any water user required to register water withdrawal and use data pursuant to this subsection that provides water to another person offsite shall include in its report, submitted on its regular reporting schedule, the total volume of potable water and, reported separately, the total volume of reclaimed water provided during each month for each of the following categories: (i) a data center, as that term is defined in subdivision A 43 of § 58.1-3506, with an air permit issued by the Department” (Enacted text (conference substitute 26109885D, as passed), § 62.1-44.38 C)
Rule checks: Project is in Virginia. Still to check: dates: not checked, who it covers: not checked
Bills and laws in Virginia
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
Who's involved
- Developer and operatorQTS
Power
Capacity, as announced or filed
- 32 MW · Facility totalAug 2019 · it_load
- 101.3 MW · Generator fleet, Reg. 74141 (DC1 22271 Broderick Drive and DC2 22280 Randolph Drive, Sterling; Ashburn 1 / ASH1)Jun 2025 · generator_capacity
- 55 MW · DC1Nov 2026 · it_load
- 22.5 MW · DC2Nov 2026 · it_load
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Virginia Department of Environmental Quality, VAR10Q048
- Stated in the filing
- 23.59 acres
- Stated in the filing
- 6.87 acres
Virginia Department of Environmental Quality, VAR10J072
- Stated in the filing
- 21.04 acres
- Stated in the filing
- 23.58 acres
Virginia Department of Environmental Quality, Registration No. 74141
- Backup generators
- 1 MTU 12V1600G70S emergency diesel engine gen-set (Ref. No. Gen01), 550 ekW (823 bhp), originally permitted March 9, 2018
- Stated in the filing
- 11 SPX Marley 2-cell NC8405TLN2 Model 8405 cooling towers (Ref. Nos. CT01 through CT11), 2,400 gpm each, originally permitted August 25, 2022
- Backup generators
- 38 emergency diesel engine gen-sets permitted under the June 10, 2025 combined permit (Ref. Nos. Gen01 through Gen38)
- Backup generators
- 17 Caterpillar 3516C emergency diesel engine gen-sets (Ref. Nos. Gen21 through Gen37), 2,500 ekW (3,634 bhp) each, originally permitted June 10, 2025
- Backup generators
- 1 Caterpillar C32 emergency diesel engine gen-set (Ref. No. Gen38), 1,250 ekW (1,829 bhp), originally permitted June 10, 2025
- Backup generators
- 19 MTU 20V4000G83L emergency diesel engine gen-sets (Ref. Nos. Gen02 through Gen20), 3,000 ekW (4,259 bhp) each, originally permitted March 9, 2018
Loudoun County, Virginia, MCPI 044152877000; MCPI 044155625000
- Floor area
- 617,227 total square feet of data center buildings on the two parcels (Overall_SQ_FT: 427,337 built and 189,890 under construction)
- Stated in the filing
- 23.587 acres
Loudoun County Board of Equalization
- Stated in the filing
- 16.33 acres
- Stated in the filing
- $485.3 million
- Stated in the filing
- $511.9 million
Public records
24 records found so far. 5 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Pending before the commission · Aug 25, 2026Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)
- Utility commission · Decided · May 1, 2026Application of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia
- Utility commission · Pending before the commission · Feb 19, 2026Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards
- Utility commission · Decided · Nov 25, 2025Application of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
- Utility commission · Decided · Feb 28, 2024Application of Virginia Electric and Power Company for a 2023 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
Questions people ask
- Where is QTS Ashburn mega data center?
- QTS Ashburn mega data center is a data center project in Sterling, Loudoun County, Virginia.
- Who operates QTS Ashburn mega data center?
- QTS is named as the operator of QTS Ashburn mega data center.
- How big is QTS Ashburn mega data center?
- QTS Ashburn mega data center was announced at 32 MW of capacity. The site covers 23.59 acres.
- What stage is QTS Ashburn mega data center?
- QTS Ashburn mega data center is operating. It was first public in 2017.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Stormwater Permits (Daily), EDMA MapServer layer 303
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 2Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn, LLC (Ashburn 1: DC1 and DC2), Registration No. 74141, June 10, 2025 (combined minor New Source Review permit, with transmittal letter)
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 3EDMA Active Air Sites layer (MapServer layer 294), facility records for all QTS registrations in Virginia (51232, 53259, 73757, 74141, 74161, 74197, 74232)
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 4Existing Data Center Parcels (county GIS layer), records for MCPI 044261032000 (Pacific Boulevard, Sterling) and MCPI 234371847000 (Compass Creek, Leesburg)
Loudoun County, VirginiaTier 1 · Captured 2026-11-09 · Open the source - 5Ashburn 1 data center campus (ASH1): 28-acre campus; DC1 22271 Broderick Drive, DC2 22280 Randolph Drive, Sterling, VA
QTS Realty Trust, LLCTier 4 · Captured 2026-11-09 · Open the source - 6Loudoun County Board of Equalization 2025 Annual Report
Loudoun County Board of EqualizationTier 1 · Captured 2026-11-09 · Open the source - 7Loudoun County Zoning Ordinance (official text, eReader)
Loudoun County, VirginiaTier 1 · Captured 2026-11-07 · Open the source - 8Land Use Considerations (county data center page)
Loudoun County, VirginiaTier 1 · Captured 2026-11-07 · Open the source - 9Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
Dominion Energy VirginiaTier 1 · Captured 2026-11-07 · Open the source - 10SCC Issues Order on DEV Biennial Review 2025
Virginia State Corporation CommissionTier 1 · Captured 2026-11-07 · Open the source - 11Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards, Case No. PUR-2026-00011
Virginia Electric and Power CompanyTier 1 · Captured 2026-11-07 · Open the source - 12How the SCC Rider T1 Decision Protects Ratepayers
Virginia State Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 13Order for Notice and Hearing, Case No. PUR-2026-00056
Virginia State Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 14Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
Loudoun County Planning CommissionTier 1 · Captured 2026-11-09 · Open the source - 15Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
Loudoun CountyTier 1 · Captured 2026-11-09 · Open the source - 16Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
Virginia Commission on Local Government (Department of Housing and Community Development)Tier 1 · Captured 2026-11-09 · Open the source - 17Board of Supervisors Business Meeting Minutes, March 18, 2025
Loudoun CountyTier 1 · Captured 2026-11-07 · Open the source - 18QTS Ashburn Mega Data Center Achieves LEED Green Building Certification (445,000 sq ft, 32 MW), 2019-08-21
QTS Realty Trust (PR Newswire release, republished by ThomasNet)Tier 4 · Captured 2026-11-08 · Open the source - 19Stationary Source Permit to Construct and Operate, QTS Dulles, LLC (QTS Ashburn-Moran), Registration No. 73757, July 30, 2024 (combined minor New Source Review permit, with transmittal letter)
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 20Stationary Source Permit to Construct and Operate, QTS Shellhorn, LLC (Ashburn-Shellhorn DC1 and DC2), Registration No. 74197, February 4, 2022 (minor New Source Review permit, with transmittal letter)
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 21Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn II, LLC (ASH2 Lockridge), Registration No. 74232, August 5, 2024 (combined minor New Source Review permit, with transmittal letter)
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 22Virginia data center locations (Ashburn-Moran, Ashburn 1, Ashburn 2, Ashburn 3, Manassas, Richmond)
QTS Realty Trust, LLCTier 4 · Captured 2026-11-09 · Open the source - 23Ashburn 2 data center campus (ASH2, Ashburn-Lockridge): 24-acre campus; DC1 44675 Quality Tech Lane, DC2 44655 Quality Tech Lane, Sterling, VA
QTS Realty Trust, LLCTier 4 · Captured 2026-11-09 · Open the source - 24Ashburn 3 data center campus (ASH3): 25-acre campus; DC1 22291 Shellhorn Road, DC2 22271 Shellhorn Road, Ashburn, VA
QTS Realty Trust, LLCTier 4 · Captured 2026-11-09 · Open the source - 25Ashburn-Moran data center: 3-acre site; 4 MW+ critical power capacity; LEED Silver Certified
QTS Realty Trust, LLCTier 4 · Captured 2026-11-09 · Open the source - 26QTS Announces Development of Mega Data Center Campus in Ashburn, Virginia (2017-10-24)
QTS Realty Trust (PR Newswire release, republished by Telecom Ramblings newswire)Tier 4 · Captured 2026-11-09 · Open the source - 27QTS Achieves Construction Milestones at its Ashburn, VA Mega Data Center (2017-12-19)
QTS Realty Trust (PR Newswire release, republished by Telecom Ramblings newswire)Tier 4 · Captured 2026-11-09 · Open the source - 28QTS Commitment to Communities page (economic impact: 40,000 U.S. jobs claim)
QTS Realty Trust, LLCTier 4 · Captured 2026-11-09 · Open the source - 29U.S. Census Geocoder (batch geographies endpoint)
U.S. Census BureauTier 1 · Captured 2026-11-11 · Open the source - 30
- 31FY 2027 Proposed Budget, Executive Summary
Loudoun County, VirginiaTier 1 · Captured 2026-11-07 · Open the source - 32Code of Virginia, Section 58.1-609.3, subdivision 18 (data center sales and use tax exemption)
Virginia Legislative Information SystemTier 1 · Captured 2026-11-08 · Open the source - 33Data Center Retail Sales & Use Tax Exemption
Virginia Economic Development PartnershipTier 1 · Captured 2026-11-08 · Open the source - 34EIA Form 861 2025, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-07 · Open the source - 35EIA Form 861 2016, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Captured 2026-11-07 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page