County Card
Data centers in Loudoun County, Virginia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 128 data center projects in Loudoun County, Virginia as of November 2026: 93 operating, 26 stage not known and 5 proposed, totaling about 1,181 MW announced where a figure is published.
Loudoun County has 128 tracked data centers, more than any other county we track. Together they account for $879.1 million in proposed property tax revenue for FY 2027, 38 percent of the county general fund. Every figure comes from the public record linked on this page.
QTS Ashburn video · 2 min 18 sec
Data center projects in Loudoun County
- 1501 Moran Road Development Owner LLC
Stage not knownSterling
- 21110 Ridgetop Circle LLC
OperatingSterling
- 21571 Beaumeade Circle LLC
OperatingAshburn
- 22810-22860 International Drive LLC
OperatingSterling
- 22995 Wilder Court LLC
OperatingSterling
- Aligned Data Centers Ashburn (Uunet Drive)
Operating180 MW announced
- Aligned Data Centers Sterling (Relocation Drive)
Operating72 MW announced
- Amazon IAD-10 (45630 Severn Way, Sterling)
Operating
- Amazon IAD-114 (20945 Loudoun County Parkway, Ashburn)
OperatingAshburn
- Amazon IAD-116 (45781 Maries Road, Sterling)
OperatingSterling
- Amazon IAD-120 (23825 Erins Run Drive, Sterling)
OperatingSterling
- Amazon IAD-12 (22630 Dulles Summit Ct, Sterling)
Operating
- Amazon IAD-124 (24214 Quail Ridge Lane, Aldie)
ProposedAldie
- Amazon IAD-140 (22890 Platform Plaza, Sterling)
OperatingSterling
- Amazon IAD-144 (22945 International Drive, Sterling)
OperatingSterling
- Amazon IAD-146 (22370 and 22420 Kipper Drive, Sterling)
OperatingSterling
- Amazon IAD-150 (25430 Sutton Bay Plaza, Chantilly)
Operating
- Amazon IAD-156 (43920 Lone Cedar Lane, Chantilly)
Operating
- Amazon IAD-161 (44254 Import Plaza, Ashburn)
Operating
- Amazon IAD-163 (21099 Atlantic Boulevard, Sterling)
OperatingSterling
- Amazon IAD-169 (21320 Beaumeade Circle, Ashburn)
OperatingAshburn
- Amazon IAD-170 (42090 Reeds Farm Lane, Stone Ridge)
ProposedStone Ridge
- Amazon IAD-180 (43975 Light Speed Plaza, Sterling)
ProposedSterling
- Amazon IAD-215 (44725 Gigabit Plaza, Ashburn)
OperatingAshburn
- Amazon IAD-243 (45130 Waxpool Road, Sterling)
Proposed
- Amazon IAD-50 (21271 Smith Switch Rd, Ashburn)
OperatingAshburn
- Amazon IAD-51 (45220 Prologis Plaza, Sterling)
Operating
- Amazon IAD-57 (28755 Relocation Drive, Sterling)
Operating
- Amazon IAD-61 (43673 John Mosby Highway, Chantilly)
OperatingChantilly
- Amazon IAD-62 (42949 Fadeley Lane, Sterling)
OperatingSterling
- Amazon IAD-667 (20575 Celtic Park Drive, Leesburg)
OperatingLeesburg
- Amazon IAD-6 (Devin Shafron Drive, Ashburn)
OperatingAshburn
- Amazon IAD-90 (45900 Pathfinder Way, Sterling)
OperatingSterling
- Belmont Innovation Campus
Stage not knownAshburn
- Cologix ASH1
OperatingAshburn120 MW announced
- Compass Datacenters Ashburn campus
Operating
- Compass Datacenters Northern Virginia Campuses (Loudoun County; several new campuses planned (listed as planned))
Proposed
- CyrusOne Kincora
OperatingSterling
- CyrusOne Northern Virginia Data Center - Maries Road
Stage not knownSterling
- CyrusOne Northern Virginia Data Center - Shaw Road
Stage not knownSterling
- CyrusOne - NVA14
Stage not knownAshburn
- CyrusOne NVA1 / NVA3 (Sterling)
OperatingSterling
- CyrusOne NVA4 (Sterling)
OperatingSterling
- CyrusOne NVA5 / NVA7 (Sterling)
OperatingSterling
- CyrusOne NVA8 (Sterling)
OperatingSterling
- CyrusOne NVA9 (Sterling)
OperatingSterling
- CyrusOne Sterling campus (Northern Virginia)
Operating
- CyrusOne Sterling IX/X/XI
Stage not knownSterling
- Darab Ventures One Two Six LLC
Stage not knownAshburn
- DataBank IAD1 (Northern Virginia)
OperatingAshburn10 MW announced
- DataBank IAD3 (Northern Virginia)
OperatingAshburn40 MW announced
- DataBank IAD4 (Northern Virginia)
OperatingAshburn20 MW announced
- Digital Filigree LLC
Stage not knownAshburn
- Digital Loudoun Pkwy Center N LLC
Stage not knownAshburn
- Digital Realty ACC4 (Ashburn)
OperatingAshburn
- Digital Realty ACC5 (Ashburn)
OperatingAshburn
- Digital Realty ACC6 (Ashburn)
OperatingAshburn
- Digital Realty ACC7 (Ashburn)
OperatingAshburn
- Digital Realty Ashburn Campus
OperatingAshburn
- Digital Realty (Digital Loudoun 3 & 4 LLC)
Stage not known
- Digital Realty IAD12 (Ashburn)
OperatingAshburn
- Digital Realty IAD14 (Ashburn)
OperatingAshburn
- Digital Realty IAD24 (Ashburn)
OperatingAshburn
- Digital Realty IAD35 (Ashburn)
OperatingAshburn
- Digital Realty IAD36 (Ashburn)
OperatingAshburn
- Digital Realty IAD37 (Ashburn)
OperatingAshburn
- Digital Realty IAD38 (Ashburn)
OperatingAshburn
- Digital Realty IAD39 (Ashburn)
OperatingAshburn
- Digital Realty IAD40 (Ashburn)
OperatingAshburn
- Digital Realty IAD44 (Sterling)
OperatingSterling
- Digital Realty - Sterling Premiere LLC
Stage not knownSterling
- Digital Western Lands LLC
Stage not knownSterling
- Equinix Ashburn (Beaumeade and Performance Circles)
OperatingAshburn
- Equinix Ashburn DC13 (Uunet Way)
Operating
- Equinix Ashburn DC3 (Chilum Place)
Operating
- Equinix Ashburn East (DC21, DC22)
OperatingAshburn
- Equinix Ashburn (Filigree Court)
OperatingAshburn
- Equinix DC10 (Washington, DC metro)
OperatingAshburn
- Equinix DC11 (Washington, DC metro)
OperatingAshburn
- Equinix DC12 (Washington, DC metro)
OperatingAshburn
- Equinix DC13 (Washington, DC metro)
OperatingAshburn
- Equinix DC15 (Washington, DC metro)
OperatingAshburn
- Equinix DC16 (Washington, DC metro)
OperatingAshburn
- Equinix DC1 (Washington, DC metro)
OperatingAshburn
- Equinix DC21 (Washington, DC metro)
OperatingAshburn
- Equinix DC22 (Washington, DC metro)
OperatingAshburn
- Equinix DC2 (Washington, DC metro)
OperatingAshburn
- Equinix DC3 (Washington, DC metro)
OperatingAshburn
- Equinix DC4 (Washington, DC metro)
OperatingAshburn
- Equinix DC5 (Washington, DC metro)
OperatingAshburn
- Equinix DC6 (Washington, DC metro)
OperatingAshburn
- Google Arcola Center, Loudoun County
OperatingArcola
- Google Stonewall Business Park, Loudoun County
OperatingLeesburg
- H5 Data Centers - Ashburn
Stage not knownAshburn
- Inova Health Care Systems - IT Operations
Stage not known
- Iskander (LC-1A) Jamshid (LC-1B) Kaveh (LC2) Lohrasp Ventures (LC3)
Stage not knownAshburn
- Kincora Data Center
Stage not known
- MECP1 Ashburn 2 LLC
Stage not knownSterling
- Microsoft Blue Ridge campus
In permitting
- Microsoft Leesburg data center campus (Compass Creek)
OperatingLeesburg
- NTT VA1 Ashburn (Guilford Drive)
OperatingAshburn
- NTT VA2 Ashburn (Guilford Drive)
Operating
- NTT VA3 to VA7 Ashburn (Gigabit Plaza)
OperatingAshburn
- QTS Ashburn 1 (Sterling)
OperatingSterling
- QTS Ashburn 2 (Lockridge)
Operating75 MW announced
- QTS Ashburn 2 (Sterling)
OperatingSterling
- QTS Ashburn 3 (Ashburn)
OperatingAshburn
- QTS Ashburn 3 (Shellhorn Road)
OperatingAshburn80 MW announced
- QTS Ashburn mega data center
OperatingSterling32 MW announced
- QTS Ashburn-Moran
Operating4 MW announced
- QTS Ashburn Moran (Sterling)
OperatingSterling
- Sabey Intergate.Ashburn
ExpandingAshburn85 MW announced
- SDC Ashburn I - SE Parcel Campus
Stage not knownSterling
- Sentinel Ashburn Nexus
Stage not knownSterling
- STACK Infrastructure Loudoun County campus
Under constructionLeesburg144 MW announced
- STACK Infrastructure NVA01
OperatingSterling17 MW announced
- STACK Infrastructure NVA04 (Northern Virginia)
OperatingSterling
- Vantage Data Centers Ashburn Campus (Ashburn)
OperatingAshburn
- Vantage Data Centers Ashburn I campus
OperatingSterling206 MW announced
- Vantage Data Centers Sterling Campus (Sterling)
OperatingSterling
- Vantage Data Centers VA2 LLC
Stage not knownSterling
- Vantage Data Center VA3 LLC
Stage not knownAshburn
- VeriSign Incorporated Broad Run Facility2
Stage not known
- Verizon Business Network Services Inc.
Stage not knownAshburn
- Visa USA Incorporated
Stage not knownAshburn
- Wheeler Data Center
Stage not knownSterling
- Yondr Northern Virginia campus (Aldie)
Expanding96 MW announced
- Zayo Group LLC (Loudoun County)
Stage not knownAshburn
Who serves this place
- ElectricityDominion Energy Virginia
- ElectricityNorthern Virginia Electric Cooperative
- WaterLoudoun Water (Loudoun County Sanitation Authority)
- WaterTown of Leesburg Department of Utilities
- Grid regionPJM
A data center is proposed in Loudoun County
5 projects here are at the announced or proposed stage. Before the hearing, the resident checklist walks through what to check: the proposal's documents, the local rules where you live, the tax agreement, and the recorded votes.
Places in and around Loudoun County
Loudoun County is part of Virginia.
Cities and towns
Nearby places
- Prince William County25 data center projects tracked
- Fairfax County22 data center projects tracked
- Henrico County12 data center projects tracked
- Mecklenburg County10 data center projects tracked
- Chesterfield County6 data center projects tracked
- Culpeper County6 data center projects tracked
- Fauquier County4 data center projects tracked
- Manassas city3 data center projects tracked
- Stafford County3 data center projects tracked
- Hanover County2 data center projects tracked
- Spotsylvania County2 data center projects tracked
- Caroline County1 data center project tracked
For homeowners
What the projects here mean if you live nearby
Each fact says which way it runs: comes to the community (such as tax paid), comes from the community (such as water or a tax break), or goes both ways. The labels show direction, not whether it is good or bad. How we work
Property tax
Data center equipment paid $684.8 million in Loudoun County property tax in fiscal 2024.Applies to 4 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)
Comes to the communityQTS Ashburn mega data center:A 2025 appeal cut this campus's main parcel assessment about 5 percent, to $485.3 million.
Comes to the community
Tax breaks
The county gives no property tax break in our records, but Virginia exempts qualifying data center equipment from state sales tax through 2035.Applies to 2 projects:Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun County
Goes both waysVirginia exempts qualifying data center equipment from state sales tax through 2035; the county adds no break in our records.Applies to 3 projects:CyrusOne Sterling campus (Northern Virginia)Microsoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Goes both ways
Money for schools and services
No community payment or fee for this campus is in our records.Applies to 3 projects:CyrusOne Sterling campus (Northern Virginia)Microsoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Not known yetThe county reports data centers supplied 38 percent of its general fund revenue.Applies to 2 projects:Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun County
Comes to the community
Electricity bill
The average Dominion home paid $157.75 a month in 2025, up from $122.88 in 2016, not adjusted for inflation.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Not known yet
Water
The water provider for this campus is not in our records yet.Applies to 2 projects:CyrusOne Sterling campus (Northern Virginia)Microsoft Leesburg data center campus (Compass Creek)
Not known yetLoudoun Water serves the unincorporated county, where this campus sits; campus water use is not published.Applies to 2 projects:Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun County
Comes from the communityQTS Ashburn mega data center:This campus's air permit lists 11 evaporative cooling towers; its water supplier and water use are not in public records we found.
Not known yet
Jobs
Job counts for this campus are not in our records yet.Applies to 4 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)
Not known yetQTS Ashburn mega data center:QTS advertises 40,000 jobs nationwide this year, but publishes no job count for this campus.
Not known yet
Next door: height, setbacks, noise
County rules put data center buildings 200 feet from home lots and cap noise at 55 decibels at homes.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
Local rule
Your say
Supervisors voted in public on March 18, 2025 to end by-right data centers in most zoning districts.Applies to 5 projects:CyrusOne Sterling campus (Northern Virginia)Google Arcola Center, Loudoun CountyGoogle Stonewall Business Park, Loudoun CountyMicrosoft Leesburg data center campus (Compass Creek)QTS Ashburn mega data center
How to take part
Taxes and budget over time
As published by the county, not adjusted for inflation. Projections are labeled.
Property tax paid by data centers
| FY 2027Projection | $879.1 million |
|---|---|
| FY 2026Projection | $794.8 million |
| FY 2025Projection | $670.3 million |
| FY 2024 | $684.8 million |
| FY 2023 | $581.6 million |
| FY 2022 | $466.2 million |
Total property tax revenue
| FY 2024 | $2.13 billion |
|---|---|
| FY 2023 | $1.9 billion |
| FY 2022 | $1.69 billion |
| FY 2021 | $1.56 billion |
| FY 2020 | $1.44 billion |
| FY 2019 | $1.32 billion |
Real property tax rate
| 2026 | 0.805 USD per 100 USD of assessed value |
|---|---|
| 2025 | 0.805 USD per 100 USD of assessed value |
| 2024 | 0.865 USD per 100 USD of assessed value |
| 2023 | 0.875 USD per 100 USD of assessed value |
| 2022 | 0.89 USD per 100 USD of assessed value |
| 2021 | 0.98 USD per 100 USD of assessed value |
Personal property tax rate
| 2026 | 4.15 USD per 100 USD of assessed value |
|---|---|
| 2026 | 3.09 USD per 100 USD of assessed value |
| 2025 | 4.15 USD per 100 USD of assessed value |
| 2024 | 4.15 USD per 100 USD of assessed value |
| 2023 | 4.15 USD per 100 USD of assessed value |
| 2022 | 4.2 USD per 100 USD of assessed value |
Total assessed value
| FY 2023 | $157.51 billion |
|---|---|
| FY 2022 | $136.37 billion |
| FY 2021 | $116.22 billion |
| FY 2020 | $108.85 billion |
| FY 2019 | $101.14 billion |
| FY 2018 | $93.11 billion |
General fund budget
| FY 2027Projection | $3.22 billion |
|---|---|
| FY 2026Projection | $2.99 billion |
Tax breaks and payments
2024 · Microsoft Leesburg data center campus (Compass Creek)
Business personal property tax rate commitment (data center computer equipment)
The Town will establish a tax rate applicable to computer equipment and peripherals associated with the operation of a data center, applying to all such equipment within the Town, at a rate not to exceed $0.75 per $100 of assessed value, and will not raise that rate for at least five years from the date Microsoft becomes subject to the Town's personal property tax. The Commission on Local Government report states the Town's rate otherwise stood at $1.00 per $100.
All tax records for Microsoft Leesburg data center campus (Compass Creek)2024 · Microsoft Leesburg data center campus (Compass Creek)
Economic Development Incentive Payment (interlocal payment under the Voluntary Settlement Agreement, Section 6)
Following the effective date of annexation, Loudoun County pays the Town an Economic Development Incentive Payment of $2 million per year, on or before July 1, increased by 3 percent each year. For each fiscal year the County makes the payment, the Town charges all water and sewer customers the in-town rates, inside or outside Town boundaries, with no out-of-town surcharge (Agreement Sections 5.4, 5.5 and 6).
All tax records for Microsoft Leesburg data center campus (Compass Creek)
Local rules for data centers
In effect · Zoning · Adopted Mar 18, 2025
Data centers moved from by right to special exception in the IP, GI, and MR-HI districts
Before this amendment, data centers were a by right use in the Industrial Park (IP), General Industry (GI), and Mineral Resources-Heavy Industry (MR-HI) districts. The amendment requires special exception approval in those three districts, and the county states the amendments eliminate data centers as a by right use in the county. Data centers were already a special exception use in the OP, CLI, and PD-RDP districts, and rural policy area districts do not allow data center development.
In effect · Generator · Adopted Dec 13, 2023
Generator testing hours for data centers next to residential property
For data centers next to residential property, generator testing is limited to set daytime and early evening windows that change with the season. Outside testing and commissioning, generators may run only for backup or emergency use, and the standard gives way to Commonwealth regulations or permits for the property. Separately, Section 7.05.03.E exempts generator testing noise from the general maximum sound levels, so these hour limits are the control that applies to testing.
In effect · Noise · Adopted Dec 13, 2023
Maximum sound levels by receiving development type, with measurement rules
The zoning ordinance caps sound at the receiving property for all uses, at all times of day and night. Levels are measured with an integrating sound level meter meeting ANSI S1.43-1997 for Type 1 meters, set to FAST over a 15 second period, with at least 3 samples averaged, taken at the point on the receiving lot line closest to the source with the microphone 5 feet above grade. Exemptions include generator and accessory equipment sounds during an emergency, at a utility request, and during generator testing.
In effect · Noise · Adopted Dec 13, 2023
Noise studies and acoustical screening required for data centers
Covered projects must file a pre construction noise study at site plan review and a post construction noise study between 1 and 12 months after the first certificate of occupancy, each prepared by a Virginia licensed professional engineer and checked against the Table 7.05.03-1 limits at the nearest point of each property line. For data centers next to residential property, exterior mechanical equipment must be screened on all four sides by an acoustical barrier built with sound proofing material.
In effect · Other · Adopted Dec 13, 2023
Facade design standards for data center buildings
Principal facades of a data center must use differentiated surfaces at set intervals, and fenestration must cover at least 30 percent of the principal facade surface. A screened mechanical equipment facade may stand in for one required principal facade facing a public road, and each building must include at least one main entrance feature.
In the news
QTS Data Centers Prepares 3,500 Thanksgiving Bags, Donates $35K to LHR
Loudoun Now
Supervisors Table Data Center Audit As Pause Faces Delays
Blue Ridge Leader
Randall Announces Agreement with Amazon to Abandon GW Campus Data Center
Blue Ridge Leader
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Newswire for Loudoun County
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Officials we track for Loudoun County
The lawmakers and local officials whose recorded jurisdiction is Loudoun County, with the bills and votes we have on record for each.
- Ad BarnesMember, Loudoun County Planning Commission · Leesburg District
- Bob SaltzmanAlternate Member, Loudoun County Board of Equalization
- Caleb A. KershnerSupervisor · Catoctin District
- Chrissie GoodrumMember, Loudoun County Board of Equalization
- Cliff KeirceVice Chairman/Secretary, Loudoun County Board of Equalization
- Eric CombsChair, Loudoun County Planning Commission · Ashburn District
- Forest HayesVice Chair, Loudoun County Planning Commission · At-Large
- Jane KirchnerMember, Loudoun County Planning Commission · Algonkian District
- Jeff SalmonMember, Loudoun County Planning Commission · Dulles District
- John FuogMember, Loudoun County Board of Equalization
- John MerrithewMember, Loudoun County Planning Commission · Sterling District
- Juli E. BriskmanSupervisor · Algonkian District
- Kevin KuestersChairman, Loudoun County Board of Equalization
- Koran T. SainesSupervisor · Sterling District
- Kristen C. UmstattdSupervisor · Leesburg District
- Laura A. TeKronySupervisor · Little River District
- Mark MillerMember, Loudoun County Planning Commission · Catoctin District
- Matthew F. LetourneauSupervisor · Dulles District
- Michael R. TurnerVice Chair · Ashburn District
- Michelle FrankMember, Loudoun County Planning Commission · Broad Run District
- Phyllis J. RandallChair · At-Large
- Roger VanceMember, Loudoun County Planning Commission · Blue Ridge District
- Sharad TandaleMember, Loudoun County Board of Equalization
- Sylvia R. GlassSupervisor · Broad Run District
- Tony BuffingtonSupervisor · Blue Ridge District
Questions people ask
- How many data centers are in Loudoun County?
- Data Center Fact Check tracks 128 data center projects in Loudoun County as of November 2026. Of those, 93 operating, 5 proposed and 2 expanding; the stage of the other 26 is not known yet.
- What is the biggest data center in Loudoun County?
- By announced capacity, the biggest data center in Loudoun County is Vantage Data Centers Ashburn I campus, announced at 206 MW. It is operating.
- How much power do data centers in Loudoun County use?
- The 128 projects tracked in Loudoun County have announced about 1,181 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
- How much property tax do data centers pay in Loudoun County?
- Data centers paid $684.8 million in property tax in FY 2024. The proposed figure for FY 2027 is $879.1 million. Data centers account for 38 percent of the county general fund.
Sources
- 1
- 2
- 3
- 4Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
Virginia Commission on Local Government (Department of Housing and Community Development)Tier 1 · Open the source - 5
- 6
- 7Loudoun County, Virginia: Data Center Capital of the World, A Strategy for a Changing Paradigm
Loudoun County Board of SupervisorsTier 1 · Open the source - 8Reliability Standards and Electrical Transmission Planning White Paper
Loudoun County (prepared by Kimley-Horn)Tier 2 · Open the source - 9
- 10
- 11
- 12Loudoun County Board of Equalization 2025 Annual Report
Loudoun County Board of EqualizationTier 1 · Open the source - 13Code of Virginia, Section 58.1-609.3, subdivision 18 (data center sales and use tax exemption)
Virginia Legislative Information SystemTier 1 · Open the source - 14Data Center Retail Sales & Use Tax Exemption
Virginia Economic Development PartnershipTier 1 · Open the source - 15QTS Ashburn Mega Data Center Achieves LEED Green Building Certification (445,000 sq ft, 32 MW), 2019-08-21
QTS Realty Trust (PR Newswire release, republished by ThomasNet)Tier 4 · Open the source - 16CyrusOne's New Data Center - Where Hyper Cloud Scale Meets Hyper Data Center Speed (Sterling II completion, 30 MW)
CyrusOne Inc. (Business Wire)Tier 4 · Open the source - 17CyrusOne Announces New Leadership in Northern Virginia to Support Public Sector Growth (8 data centers, 1.9M sq ft, Sterling campus)
CyrusOne Inc. (Business Wire)Tier 4 · Open the source - 18Enforcement Action - Order by Consent issued to Microsoft Corporation for Leesburg (IAD01-02-03-04-05) Data Center, Registration No. 74220 (draft revised 2026-08-31)
Virginia Department of Environmental QualityTier 1 · Open the source - 19EIA Form 861 2025, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 20EIA Form 861 2016, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 21
- 22Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn, LLC (Ashburn 1: DC1 and DC2), Registration No. 74141, June 10, 2025 (combined minor New Source Review permit, with transmittal letter)
Virginia Department of Environmental QualityTier 1 · Open the source - 23QTS Commitment to Communities page (economic impact: 40,000 U.S. jobs claim)
QTS Realty Trust, LLCTier 4 · Open the source - 24
- 25Loudoun County Zoning Ordinance (official text, eReader)
Loudoun County, VirginiaTier 1 · Open the source - 26
- 27Leesburg Town Council Approves Voluntary Settlement Agreement Related to Compass Creek Annexation
Town of Leesburg, VirginiaTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Loudoun County." Last checked 2026-11-07. Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-loudoun