County Card
Data centers in Chesterfield County, Virginia
Draft research: figures were traced to their sources by an AI research agent and have not passed verification yet.
Data Center Fact Check tracks 6 data center projects in Chesterfield County, Virginia as of November 2026: 2 in permitting, 2 under construction and 2 operating, totaling about 300 MW announced where a figure is published.
Chesterfield County has 6 tracked data centers. Their announced capacity totals about 300 MW where a figure is published. Of those, 2 in permitting, 2 under construction and 2 operating. Every figure comes from the public record linked on this page.
Data center projects in Chesterfield County
- 11751 Meadowville Owner LLC c/o GFH Capital Ltd
OperatingChester
- Chirisa Digital Drive Campus
Under constructionChester300 MW announced
- Chirisa Richmond campus
Operating
- Google Chesterfield Data Center (Project Peanut)
Under constructionChester
- Google Project Loch Data Center
In permitting
- Google Project Skye Data Center
In permitting
Who serves this place
- Not collected yet.
Places in and around Chesterfield County
Chesterfield County is part of Virginia.
Cities and towns
- Chester3 data center projects tracked
Nearby places
- Loudoun County128 data center projects tracked
- Prince William County25 data center projects tracked
- Fairfax County22 data center projects tracked
- Henrico County12 data center projects tracked
- Mecklenburg County10 data center projects tracked
- Culpeper County6 data center projects tracked
- Fauquier County4 data center projects tracked
- Manassas city3 data center projects tracked
- Stafford County3 data center projects tracked
- Hanover County2 data center projects tracked
- Spotsylvania County2 data center projects tracked
- Caroline County1 data center project tracked
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Chesterfield County?
- Data Center Fact Check tracks 6 data center projects in Chesterfield County as of November 2026. Of those, 2 in permitting, 2 under construction and 2 operating.
- What is the biggest data center in Chesterfield County?
- By announced capacity, the biggest data center in Chesterfield County is Chirisa Digital Drive Campus, announced at 300 MW. It is under construction.
- How much power do data centers in Chesterfield County use?
- The 6 projects tracked in Chesterfield County have announced about 300 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Chesterfield County." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-chesterfield
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page