Data Center Fact Check tracks 3 data center projects in Chester, Virginia as of November 2026: 2 under construction and 1 operating, totaling about 300 MW announced where a figure is published.
Chester has 3 tracked data centers. Their announced capacity totals about 300 MW where a figure is published. Of those, 2 under construction and 1 operating. The projects here are 11751 Meadowville Owner LLC c/o GFH Capital Ltd, Chirisa Digital Drive Campus, and Google Chesterfield Data Center (Project Peanut). Every figure comes from the public record linked on this page.
Data center projects in Chester
- 11751 Meadowville Owner LLC c/o GFH Capital Ltd
OperatingChester
- Chirisa Digital Drive Campus
Under constructionChester300 MW announced
- Google Chesterfield Data Center (Project Peanut)
Under constructionChester
Who serves this place
- Not collected yet.
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Chester?
- Data Center Fact Check tracks 3 data center projects in Chester as of November 2026. Of those, 2 under construction and 1 operating.
- What is the biggest data center in Chester?
- By announced capacity, the biggest data center in Chester is Chirisa Digital Drive Campus, announced at 300 MW. It is under construction.
- How much power do data centers in Chester use?
- The 3 projects tracked in Chester have announced about 300 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Chester." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-chester
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page