Skip to content

Draft research. Every default and project value comes from our research files and has not passed verification yet.

How many homes use as much electricity as a data center?

Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.

Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona

Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.

The address holds your inputs, so a link shows the same calculation.

Start from

Your data centers

Pick as many as you like. The one marked main drives the big result.

  • Yondr Northern Virginia campus (Aldie)Loudoun County, Virginia

Yondr Northern Virginia campus (Aldie): Expanding. Announced capacity 96 MW

Fine-tune every input
How hard it runs, percent of capacity (low, likely, high)
Overhead multiplier, used only for computer-equipment figures

About as much electricity in a year as

38,500 to 54,000 homes

Most likely about 50,600 homes served by Dominion Energy Virginia, for Yondr Northern Virginia campus (Aldie) at 96 MW.

Yearly electricity: about 631 GWh (range 479 to 673 GWh).

Precision: Fair2 of 4

  • Capacity: From our records, with a source.
  • Local homes: Homes served by the same utility.
  • What kind of facility: Facility type and what the MW figure measures narrow the range.
  • Measured use: The operator's own reported yearly electricity for this site would replace our estimate. None in our records yet.

Estimated range. Not a forecast, and not a bill.

Your data centers, side by side

Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.

Selected data centers compared
Data centerCapacityHomes (likely)Yearly GWhCompared with
Yondr Northern Virginia campus (Aldie)Main96 MW50,600631Homes served by Dominion Energy Virginia
Together50,600631Each site against its own local homes.

How it works

  1. Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier. 96 MW × 1 = 96 MW (likely)
  2. Yearly electricity: facility power times 8,760 hours times how hard it runs. 96 MW × 8,760 h × 75% = 630,720 MWh
  3. Homes: that total divided by what one home uses in a year. 630,720 MWh ÷ 12.456 MWh = 50,636 homes (shown rounded)

This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.

Sources

  1. 1
    Form EIA-861 final 2025 detailed data files
    U.S. Energy Information Administration
    Tier 1 · Open the source
  2. 2
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  3. 3
    Stationary Source Permit to Construct and Operate, Yondr JK 2 LLC, Registration No. 74265, August 13, 2026 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Open the source
  4. 4
    Issued Air Permits for Data Centers (list as of January 29, 2026)
    Virginia Department of Environmental Quality
    Tier 1 · Open the source
  5. 5
    EDMA Active Air Sites layer (MapServer layer 294), facility record for Registration No. 74265 and statewide Yondr name query
    Virginia Department of Environmental Quality
    Tier 1 · Open the source
  6. 6
    EDMA Virginia Water Protection Non-Permit layer (MapServer layer 191), record 22-001685 (Yondr JK Substation) and statewide Yondr name queries of layers 191, 192 and 193
    Virginia Department of Environmental Quality
    Tier 1 · Open the source
  7. 7
    Yondr Group's first Northern Virginia data center is ready for service
    Yondr Group
    Tier 4 · Open the source
  8. 8
    Yondr Group completes first RFS milestone for second building at 96MW Northern Virginia campus
    Yondr Group
    Tier 4 · Open the source
  9. 9
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Open the source
  10. 10
    Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
    Uptime Institute
    Tier 2 · Open the source

Questions people ask

How many homes use as much electricity as a data center?
About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
How many homes does 1 MW of data center power equal?
About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
Is a data center's MW figure what it actually uses?
No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
Why does the answer change by utility?
Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.

Embed this calculator

Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.

<iframe src="https://datacenterfactcheck.org/calculators/mw-to-homes/embed" title="MW to homes calculator" width="100%" height="640" loading="lazy"></iframe>