Project File
NTT VA2 Ashburn (Guilford Drive)
Loudoun County,VirginiaOperatingFirst public 2016Filing entity: NTT Global Data Centers VA2, LLCLast checked Nov 9, 2026
NTTDeveloper and operator
Details confirmed
Every detail on this page comes from an original record. Anything we have not confirmed is left blank, and this bar shows where this project's record stands.
5 of 6 details confirmed
- Confirmed: County
- Confirmed: Stage
- Confirmed: Capacity
- Confirmed: Electric utility
- Confirmed: First public date
- Still to confirm: City or address
What happens next: No upcoming date is on record.
Record order shows the sections in file order. Highlights first makes the first key number large and moves the timeline up under it. Both show the same sections; nothing is hidden.
Draft research: these facts were traced to their sources by an AI research agent and have not passed verification yet.
NTT VA2 Ashburn (Guilford Drive) is an operating data center project in Loudoun County, Virginia. NTT is named as operator. It was first public in 2016. No site capacity figure is published for this project.
NTT VA2 Ashburn (Guilford Drive) is an operating data center project in Loudoun County, Virginia. NTT is named as operator. No site capacity figure is published for this project. 5 of the six core facts we track for every project are confirmed on this page.
Where this project sits
This project sits in Loudoun County, Virginia. Each place page carries the projects tracked there, who provides its power and water, and its local rules.
For homeowners
What this project means if you live nearby
We have not written the homeowner summary for this project yet. Every record we have is on the Records tab.
Newswire for Loudoun County
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.

The land, to scale
Timeline
- · DecisionVirginia Department of Environmental Quality: Issued (Article 6 minor New Source Review); permit to RagingWire Data Centers, Inc. to construct and operate 13 diesel engine gen-sets at the RagingWire VA2 Data Center, 44610 Guilford Drive, Ashburn (air permit) for NTT VA2 Ashburn (Guilford Drive)Registration No. 74094
- · New projectFirst public record of NTT VA2 Ashburn (Guilford Drive)Operating
- · FilingFiled with Virginia Department of Environmental Quality: air permit for NTT VA2 Ashburn (Guilford Drive)Registration No. 74094
- · FilingFiled with Virginia Department of Environmental Quality: stormwater permit for NTT VA2 Ashburn (Guilford Drive)VAR10G521
Laws and bills that may apply here
Found by each bill's own place and size rules. Each one says who has checked it so far.
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia HB 30: Budget act item taxing data center electricity at 1.1 cents per kWh
The budget item taxes every data center operator on electricity consumed at each data center from July 1, 2026 to July 1, 2028 and defines a data center to include equipment for the transformation, transmission, distribution, or management of at least one megawatt of electrical power and cooling; this project is an operating data center in Virginia with a capacity figure over one megawatt on record, so every condition the text sets is met by a fact on record.
“Beginning on and after July 1, 2026, but before July 1, 2028, there is hereby levied and imposed upon every data center operator, in addition to all other taxes and fees of every kind now imposed by law, an electricity consumption tax at the rate of $0.011/kWh of all electricity consumed at each data center per month.” (Item 3-5.24, paragraph A.1 (HB 30, Chapter 1, Part 3))
Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia HB 496: Requires monthly water use reports for data centers
The act requires a water user that provides water to another person offsite to report monthly potable and reclaimed water volumes separately for a data center with an air permit issued by the Department of Environmental Quality, effective January 1, 2027; this project is a data center in Virginia with a DEQ air permit on record, so it falls in the reporting category the text sets.
“Any water user required to register water withdrawal and use data pursuant to this subsection that provides water to another person offsite shall include in its report, submitted on its regular reporting schedule, the total volume of potable water and, reported separately, the total volume of reclaimed water provided during each month for each of the following categories: (i) a data center, as that term is defined in subdivision A 43 of § 58.1-3506, with an air permit issued by the Department and (ii) to the extent available without utility billing system modifications, (a) domestic purposes, (b) commercial and industrial purposes, separately or combined as available, and (c) all other non-categorized purposes.” (Enacted text (Chapter 623), § 62.1-44.38 C)
Rule checks: Project is in Virginia. Still to check: dates: not checked, who it covers: not checked
- Checked by AI against the bill text, not yet by a person · Nov 29, 2026Virginia SB 553: Requires monthly water use reports for data centers
The act requires a water user that provides water to another person offsite to report monthly potable and reclaimed water volumes separately for a data center with an air permit issued by the Department of Environmental Quality, effective January 1, 2027; this project is a data center in Virginia with a DEQ air permit on record, so it falls in the reporting category the text sets.
“Any water user required to register water withdrawal and use data pursuant to this subsection that provides water to another person offsite shall include in its report, submitted on its regular reporting schedule, the total volume of potable water and, reported separately, the total volume of reclaimed water provided during each month for each of the following categories: (i) a data center, as that term is defined in subdivision A 43 of § 58.1-3506, with an air permit issued by the Department and (ii) to the extent available without utility billing system modifications, (a) domestic purposes, (b) commercial and industrial purposes, separately or combined as available, and (c) all other non-categorized purposes.” (Enacted text (conference substitute 26109885D, as passed), § 62.1-44.38 C)
Rule checks: Project is in Virginia. Still to check: dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 1393: Shifts grid costs to the largest electricity customers
The bill directs Dominion Energy Virginia to propose allocating capacity procurement and distribution infrastructure costs to its customer class with a contracted or measured demand of 25 megawatts or greater and an average load factor of 75 percent or greater, in rate proceedings commencing after January 1, 2027 and before July 1, 2033; this project is served by Dominion Energy Virginia on record, but its contracted or measured demand and its average annual load factor are not on record.
“Dominion Energy Virginia to propose to the Commission, in any proceeding to determine rates for generation and distribution services commencing after January 1, 2027, and before July 1, 2033, that certain costs related to capacity procurement requirements and distribution infrastructure investments are allocated to the utility's customer class approved to serve customers with a contracted or measured electric demand of 25 megawatts or greater and an anticipated or measured average annual electric load factor of 75 percent or greater” (LIS bill-details page for HB 1393 (2026), Summary)
Rule checks: Project is in Virginia. Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 153: Requires site assessments before local approval of large data centers
The act covers new high energy use facilities, facilities an applicant reasonably anticipates at the time of filing a rezoning, special exception, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility; the electrical power this project was anticipated to require from its retail electric utility at the time of filing is not on record.
“"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Va. Code Sec. 15.2-2209.4 A)
Rule checks: Project is in Virginia. Still to check: size: unknown, dates: not checked, who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 323: Directs a state study of data center waste heat
The act directs the Department of Energy to lead efforts to accelerate the use of waste heat from data centers in the Commonwealth, convene a work group, and report by September 1, 2026; it sets no project-level condition on an individual data center, and whether this project's waste heat is within the work group's scope is not on record.
“Directs the Department of Energy to lead efforts to accelerate the use of waste heat from data centers in the Commonwealth by making certain findings and recommendations and convening a work group to provide expertise, assistance, and feedback on the Department's efforts.” (LIS bill-details page for HB 323 (2026), Summary As Passed)
Rule checks: Project is in Virginia. Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia HB 507: Sets Tier 4 generator emission limits in data center air permits
The section bars the Department of Environmental Quality from issuing a data center permit on an application submitted on or after July 1, 2026 unless the emission limit for each gen-set is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set; whether this project has a data center permit application submitted on or after July 1, 2026 is not on record.
“For any application submitted for a data center on or after July 1, 2026, for a permit issued by the Department pursuant to this chapter, including coverage under any general permit, the Department shall not issue such permit unless the emission limit for each gen-set established by such permit is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set.” (Va. Code Sec. 10.1-1322.6(B) (2026, c. 397))
Rule checks: Project is in Virginia. Still to check: who it covers: not checked
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Virginia SB 94: Requires site assessments before local approval of large data centers
The section's site assessment duty turns on the electrical power a facility is anticipated to require from its retail electric utility, and no such figure is on record for this project; its on-record capacity is 29.25 MW of standby generator capacity, which does not measure power drawn from the utility.
“"high energy use facility" or "HEUF" means a facility that an applicant reasonably anticipates at the time of filing a rezoning application, special exception application, or special use permit application will require 100 megawatts or more of electrical power from an electric utility providing retail service to the facility.” (Chapter 568 (2026 Acts of Assembly), new Code of Virginia section 15.2-2209.4, subsection A)
Rule checks: Project is in Virginia. Still to check: size: unknown, who it covers: not checked
Bills and laws in Virginia
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
Who's involved
- Developer and operatorNTT
Power
Capacity, as announced or filed
- 29.25 MW · Generator fleet, Registration No. 74094 (Building VA2, 44610 Guilford Dr.)Jan 2016 · generator_capacity
From the filings
Numbers stated in permits, agreements, and decisions, as printed. Each links to the filing.
Virginia Department of Environmental Quality, Registration No. 74094
- Generator capacityEstimated
- 29.25 MWOur arithmetic from the counts and per-unit ratings the permit states; the permit states no single total. Backup generation rating, not data center load.
- Backup generators
- 13 diesel engine gen-sets (Cummins QSK60-G14NR2, 2,250 kW each, Refs 21M-23M, 21U-24U, 24M and 25U-29U)
Virginia Department of Environmental Quality, VAR10G521
- Stated in the filing
- 0.94 acres
- Stated in the filing
- 4.74 acres
Loudoun County Board of Equalization
- Stated in the filing
- $95.1 million
- Stated in the filing
- 4.74 acres
- Stated in the filing
- $186.3 million
Public records
22 records found so far. 5 kinds of record are still being collected.
See every recordCourt cases and commission dockets
- Utility commission · Pending before the commission · Aug 25, 2026Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)
- Utility commission · Decided · May 1, 2026Application of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia
- Utility commission · Pending before the commission · Feb 19, 2026Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards
- Utility commission · Decided · Nov 25, 2025Application of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
- Utility commission · Decided · Feb 28, 2024Application of Virginia Electric and Power Company for a 2023 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
Questions people ask
- Where is NTT VA2 Ashburn (Guilford Drive)?
- NTT VA2 Ashburn (Guilford Drive) is a data center project in Loudoun County, Virginia.
- Who operates NTT VA2 Ashburn (Guilford Drive)?
- NTT is named as the operator of NTT VA2 Ashburn (Guilford Drive).
- How big is NTT VA2 Ashburn (Guilford Drive)?
- The site covers 4.74 acres.
- What stage is NTT VA2 Ashburn (Guilford Drive)?
- NTT VA2 Ashburn (Guilford Drive) is operating. It was first public in 2016.
Sources
Tier 1 is a primary record: the original record, such as a filing, permit, dataset, or official document. Tier 2 is expert analysis by a named expert or institution. Tier 3 is credible reporting by a news outlet. Tier 4 is a statement by a party with an interest in the outcome.
- 1Permit to construct and operate, RagingWire VA2 Data Center, Registration No. 74094, transmittal letter and permit
Virginia Department of Environmental Quality, Northern Regional OfficeTier 1 · Captured 2026-11-09 · Open the source - 2Issued Air Permits for Data Centers (list as of January 29, 2026)
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-08 · Open the source - 3EDMA Active Air Sites layer (MapServer layer 294), facility records for Registration Nos. 73199, 73233, 73946, 74147, 74189
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 4Stormwater Permits (Daily), EDMA MapServer layer 303
Virginia Department of Environmental QualityTier 1 · Captured 2026-11-09 · Open the source - 5Loudoun County Board of Equalization 2025 Annual Report
Loudoun County Board of EqualizationTier 1 · Captured 2026-11-09 · Open the source - 6Loudoun County Zoning Ordinance (official text, eReader)
Loudoun County, VirginiaTier 1 · Captured 2026-11-07 · Open the source - 7Land Use Considerations (county data center page)
Loudoun County, VirginiaTier 1 · Captured 2026-11-07 · Open the source - 8Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
Dominion Energy VirginiaTier 1 · Captured 2026-11-07 · Open the source - 9SCC Issues Order on DEV Biennial Review 2025
Virginia State Corporation CommissionTier 1 · Captured 2026-11-07 · Open the source - 10Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards, Case No. PUR-2026-00011
Virginia Electric and Power CompanyTier 1 · Captured 2026-11-07 · Open the source - 11How the SCC Rider T1 Decision Protects Ratepayers
Virginia State Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 12Order for Notice and Hearing, Case No. PUR-2026-00056
Virginia State Corporation CommissionTier 1 · Captured 2026-11-08 · Open the source - 13Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
Loudoun County Planning CommissionTier 1 · Captured 2026-11-09 · Open the source - 14Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
Loudoun CountyTier 1 · Captured 2026-11-09 · Open the source - 15Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
Virginia Commission on Local Government (Department of Housing and Community Development)Tier 1 · Captured 2026-11-09 · Open the source - 16Board of Supervisors Business Meeting Minutes, March 18, 2025
Loudoun CountyTier 1 · Captured 2026-11-07 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page