Utility commission
Application of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia
Where it stands: Decided
Draft research, not yet verified. Open a source to check any detail.
What it is
Transmission cost recovery case (Rider T1) in which the Commission also decided how transmission costs are allocated as large load grows. It approved two changes to Dominion transmission cost allocation method: a forecast adjustment that aligns allocation with rapidly expanding large load growth, and an adjustment incorporating the 85 percent transmission minimum demand charge for certain large load customers from January 1, 2027 (the GS-5 minimum decided in PUR-2025-00058). On the Commission illustration, the amended method cuts the projected Rider T1 increase for a typical residential customer using 1,000 kWh from $2.90 to $0.94 a month. The final order also approved a staff framework to require large load customers to fund direct connect transmission facilities needed for new or expanding large loads, through amendments to Dominion line extension policy in a new supplemental docket, PUR-2026-00131.
The facts
- Regulator
- Virginia State Corporation Commission
- Docket number
- PUR-2026-00056
- Type
- Rate case
- Utility
- Dominion Energy Virginia
- State
- Virginia
- Filed
- May 1, 2026
- Large-load rules
- Yes
Projects served by Dominion Energy Virginia
- Aligned Data Centers Ashburn (Uunet Drive)
- Aligned Data Centers Sterling (Relocation Drive)
- Amazon Cosner Tech Campus
- Amazon IAD-10 (45630 Severn Way, Sterling)
- Amazon IAD-114 (20945 Loudoun County Parkway, Ashburn)
- Amazon IAD-116 (45781 Maries Road, Sterling)
- Amazon IAD-120 (23825 Erins Run Drive, Sterling)
- Amazon IAD-12 (22630 Dulles Summit Ct, Sterling)
- Amazon IAD-124 (24214 Quail Ridge Lane, Aldie)
- Amazon IAD-140 (22890 Platform Plaza, Sterling)
- Amazon IAD-144 (22945 International Drive, Sterling)
- Amazon IAD-146 (22370 and 22420 Kipper Drive, Sterling)
Related cases and proceedings
- Utility commission · Pending before the commissionPetition of Northern Virginia Electric Cooperative for approval of revisions to the Terms and Conditions of Rate Schedules LP-1, DPS, HV-1 and HV-2
- Utility commission · Pending before the commissionSupplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)
- Utility commission · Pending before the commissionApplication of Kentucky Utilities Company d/b/a Old Dominion Power Company for an adjustment of electric base rates
- Utility commission · Pending before the commissionApplication of Virginia Electric and Power Company for approval of its large-load connection queue process standards
- Utility commission · In effectLarge Power Dedicated Facilities Contract Service Schedule LPD-2
- Utility commission · DecidedApplication of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
- Utility commission · Pending before the commissionPetition of Appalachian Power Company For approval of Revisions to the Terms and Conditions of Rate Schedule L.P.S.
- Utility commission · Pending before the commissionPetition of Mecklenburg Electric Cooperative for approval to implement a new Large Power Service Rate Schedule (Schedule LPS-U)
In the record
- Utility case, May 1, 2026. Utility case filed: Application of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia Virginia State Corporation Commission, PUR-2026-00056
Sources
- 1How the SCC Rider T1 Decision Protects Ratepayers
Virginia State Corporation CommissionTier 1 · Order for Notice and Hearing, May 11, 2026 (application filed May 1, 2026 for Rider T1 under Section 56-585.1 A 4); SCC Fact Sheet, Rider T1 2026 Decision, post date September 3, 2026 (approved forecast adjustment and 85 percent transmission minimum demand adjustment; $2.90 to $0.94 illustration; direct assignment framework; new docket PUR-2026-00131) · Open the source - 2Order for Notice and Hearing, Case No. PUR-2026-00056
Virginia State Corporation CommissionTier 1 · Order for Notice and Hearing, May 11, 2026 (application filed May 1, 2026 for Rider T1 under Section 56-585.1 A 4); SCC Fact Sheet, Rider T1 2026 Decision, post date September 3, 2026 (approved forecast adjustment and 85 percent transmission minimum demand adjustment; $2.90 to $0.94 illustration; direct assignment framework; new docket PUR-2026-00131) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Application of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia." Last activity 2026-05-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-dominion-rider-t1-2026