Large Power Dedicated Facilities Contract Service Schedule LPD-2
Where it stands: In effect as of Jan 1, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
The consumer must sign an Electric Service Agreement, have a metered load of at least 40,000 kW in the current or preceding eleven months (new consumers may ramp to that level over a period set in the ESA), and accept a minimum contract billing demand of 40,000 kW. Service is at primary voltage of 20 kV or more through dedicated facilities from a wholesale delivery point of 110 kV or higher; no backup or standby service. The ESA term is negotiable but structured to recover the full cost of distribution and sub-transmission plant including operations and maintenance, with collateral in the amount and form the Cooperative accepts; the consumer pays CIAC for all facilities costs plus monthly excess facilities charges, remains responsible for capacity and transmission charges after discontinuing service, and is billed the higher of actual demand or the contract minimum times ESA ramp percentages, with billing energy at a 0.85 factor floor.
The facts
- Regulator
- Virginia State Corporation Commission
- Type
- Large load tariff
- Utility
- Shenandoah Valley Electric Cooperative
- State
- Virginia
- Filed
- Oct 16, 2025
- Status date
- Jan 1, 2026
- Large-load rules
- Yes, for loads of 40 MW or more
Related cases and proceedings
- Utility commission · Pending before the commissionSupplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)
- Utility commission · Pending before the commissionApplication of Kentucky Utilities Company d/b/a Old Dominion Power Company for an adjustment of electric base rates
- Utility commission · DecidedApplication of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia
- Utility commission · Pending before the commissionApplication of Virginia Electric and Power Company for approval of its large-load connection queue process standards
- Utility commission · DecidedApplication of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
- Utility commission · Pending before the commissionPetition of Appalachian Power Company For approval of Revisions to the Terms and Conditions of Rate Schedule L.P.S.
- Utility commission · Pending before the commissionPetition of Mecklenburg Electric Cooperative for approval to implement a new Large Power Service Rate Schedule (Schedule LPS-U)
- Utility commission · In effectPetition of Rappahannock Electric Cooperative For approval to implement a new Large Power Dedicated Facilities Rate Schedule
In the record
- Utility case, Oct 16, 2025. Utility case filed: Large Power Dedicated Facilities Contract Service Schedule LPD-2 Virginia State Corporation Commission
Sources
- 1Large Power Dedicated Facilities Contract Service Schedule LPD-2 (SCC accepted for filing January 13, 2026; effective January 1, 2026)
Shenandoah Valley Electric CooperativeTier 1 · Schedule LPD-2, p. 1 (applicability: 40,000 kW tests, 20 kV service, 110 kV delivery point, collateral, ESA term) and Facilities Charge section, pp. 3-4 (CIAC and excess facilities charges); SVEC rates page, 2025 Commercial and Large Power Rate Reviews (October 16, 2025 petition; interim approval from January 1, 2026) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Large Power Dedicated Facilities Contract Service Schedule LPD-2." Last activity 2026-01-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-shenandoah-valley-lpd-2-2025