Utility commission
Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)
Where it stands: Pending before the commission as of Aug 25, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
New docket established by Commission order on August 25, 2026 to receive Dominion proposed amendments to its line extension policy, developed with Commission staff under the framework approved in PUR-2026-00056. The amendments are designed to ensure large load customers fund the costs of direct connect transmission facilities needed to serve new or expanding large loads, in situations where those facilities would not be built if not for the large load customer needs. The policy will apply prospectively. No amended policy text had been opened when this row was written, so the specific contribution in aid of construction terms, facility definitions, and any revenue credit are not stated here.
The facts
- Regulator
- Virginia State Corporation Commission
- Docket number
- PUR-2026-00131
- Type
- Interconnection rule
- Utility
- Dominion Energy Virginia
- State
- Virginia
- Filed
- Aug 25, 2026
- Status date
- Aug 25, 2026
- Large-load rules
- Yes
Projects served by Dominion Energy Virginia
- Aligned Data Centers Ashburn (Uunet Drive)
- Aligned Data Centers Sterling (Relocation Drive)
- Amazon Cosner Tech Campus
- Amazon IAD-10 (45630 Severn Way, Sterling)
- Amazon IAD-114 (20945 Loudoun County Parkway, Ashburn)
- Amazon IAD-116 (45781 Maries Road, Sterling)
- Amazon IAD-120 (23825 Erins Run Drive, Sterling)
- Amazon IAD-12 (22630 Dulles Summit Ct, Sterling)
- Amazon IAD-124 (24214 Quail Ridge Lane, Aldie)
- Amazon IAD-140 (22890 Platform Plaza, Sterling)
- Amazon IAD-144 (22945 International Drive, Sterling)
- Amazon IAD-146 (22370 and 22420 Kipper Drive, Sterling)
Related cases and proceedings
- Utility commission · Pending before the commissionPetition of Northern Virginia Electric Cooperative for approval of revisions to the Terms and Conditions of Rate Schedules LP-1, DPS, HV-1 and HV-2
- Utility commission · Pending before the commissionApplication of Kentucky Utilities Company d/b/a Old Dominion Power Company for an adjustment of electric base rates
- Utility commission · DecidedApplication of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia
- Utility commission · Pending before the commissionApplication of Virginia Electric and Power Company for approval of its large-load connection queue process standards
- Utility commission · In effectLarge Power Dedicated Facilities Contract Service Schedule LPD-2
- Utility commission · DecidedApplication of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services
- Utility commission · Pending before the commissionPetition of Appalachian Power Company For approval of Revisions to the Terms and Conditions of Rate Schedule L.P.S.
- Utility commission · Pending before the commissionPetition of Mecklenburg Electric Cooperative for approval to implement a new Large Power Service Rate Schedule (Schedule LPS-U)
In the record
- Utility case, Aug 25, 2026. Utility case filed: Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers) Virginia State Corporation Commission, PUR-2026-00131
Sources
- 1How the SCC Rider T1 Decision Protects Ratepayers
Virginia State Corporation CommissionTier 1 · SCC Fact Sheet, Rider T1 2026 Decision, post date September 3, 2026, Background and direct assignment sections (order establishing this docket entered August 25, 2026; case number PUR-2026-00131; direct connect, but for, and prospective terms) · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)." Last activity 2026-08-25. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-dominion-line-extension-2026