Every public record we have for QTS Ashburn mega data center

Sterling, Loudoun County, VirginiaOperatingFirst public 2017Filing entity: QTS Investment Properties Ashburn, LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

3 of 24 records · showing environmental permits only ·

2025

  • Air permitIssuedJun 10, 2025Virginia Department of Environmental Quality

    Virginia Department of Environmental Quality, Registration No. 74141

    Issued; combined minor New Source Review permit to construct and operate emissions units at the Ashburn 1 campus (DC1 and DC2); combines the terms and conditions from and supersedes the permit document dated August 25, 2022

    Backup generators:
    1 MTU 12V1600G70S emergency diesel engine gen-set (Ref. No. Gen01), 550 ekW (823 bhp), originally permitted March 9, 2018
    Stated in the filing:
    11 SPX Marley 2-cell NC8405TLN2 Model 8405 cooling towers (Ref. Nos. CT01 through CT11), 2,400 gpm each, originally permitted August 25, 2022
    Backup generators:
    38 emergency diesel engine gen-sets permitted under the June 10, 2025 combined permit (Ref. Nos. Gen01 through Gen38)
    Backup generators:
    17 Caterpillar 3516C emergency diesel engine gen-sets (Ref. Nos. Gen21 through Gen37), 2,500 ekW (3,634 bhp) each, originally permitted June 10, 2025
    Backup generators:
    1 Caterpillar C32 emergency diesel engine gen-set (Ref. No. Gen38), 1,250 ekW (1,829 bhp), originally permitted June 10, 2025
    Backup generators:
    19 MTU 20V4000G83L emergency diesel engine gen-sets (Ref. Nos. Gen02 through Gen20), 3,000 ekW (4,259 bhp) each, originally permitted March 9, 2018
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    Transmittal letter and attached permit, June 10, 2025: QTS Investment Properties Ashburn, LLC, DC1: 22271 Broderick Drive, DC2: 22280 Randolph Drive, Sterling, VA; application deemed complete May 28, 2025

2024

  • Stormwater permitIssuedJul 1, 2024Virginia Department of Environmental Quality

    Virginia Department of Environmental Quality, VAR10J072

    Construction general permit coverage (VAR10) for 'Broad Run Business Center Lots 6 and 7A', 22271 Broderick Dr, Sterling 20166; operator of record QTS Investment Properties Ashburn, LLC; development 23.58 acres, disturbed 21.04 acres; 2024-cycle record carries status TRANSFER, cycle July 1, 2024 to June 30, 2029

    Disturbed acres:
    21.04 acres
    Development acres:
    23.58 acres
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    DEQ EDMA Stormwater Permits layer (layer 303), records for VAR10J072, queried 2026-11-09 on the operator name QTS

2019

  • Stormwater permitIssuedJul 1, 2019Virginia Department of Environmental Quality

    Virginia Department of Environmental Quality, VAR10Q048

    Construction general permit coverage (VAR10) for 'ASH1 Broderick DC2 Ashburn 1 to Broderick Data Center', 22271 Broderick Dr, Sterling 20166; operator of record QTS Investment Properties Ashburn LLC; development 23.59 acres, disturbed 6.87 acres; coverage issued for the cycle July 1, 2019 to June 30, 2024 (status PER_ISSUED) and reissued for the cycle July 1, 2024 to June 30, 2029 (status PER_REISS)

    Development acres:
    23.59 acres
    Disturbed acres:
    6.87 acres
    Draft research, not yet verifiedLast checked Nov 9, 2026
    Where it says this

    DEQ EDMA Stormwater Permits layer (layer 303), records for VAR10Q048, queried 2026-11-09 on the project name and operator: nature of work 'Commercial - Construction of data center'

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Stormwater Permits (Daily), EDMA MapServer layer 303
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn, LLC (Ashburn 1: DC1 and DC2), Registration No. 74141, June 10, 2025 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    EDMA Active Air Sites layer (MapServer layer 294), facility records for all QTS registrations in Virginia (51232, 53259, 73757, 74141, 74161, 74197, 74232)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Existing Data Center Parcels (county GIS layer), records for MCPI 044261032000 (Pacific Boulevard, Sterling) and MCPI 234371847000 (Compass Creek, Leesburg)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Ashburn 1 data center campus (ASH1): 28-acre campus; DC1 22271 Broderick Drive, DC2 22280 Randolph Drive, Sterling, VA
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  6. 6
    Loudoun County Board of Equalization 2025 Annual Report
    Loudoun County Board of Equalization
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Loudoun County Zoning Ordinance (official text, eReader)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  8. 8
    Land Use Considerations (county data center page)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  9. 9
    Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
    Dominion Energy Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  10. 10
    SCC Issues Order on DEV Biennial Review 2025
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  11. 11
    Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards, Case No. PUR-2026-00011
    Virginia Electric and Power Company
    Tier 1 · Captured 2026-11-07 · Open the source
  12. 12
    How the SCC Rider T1 Decision Protects Ratepayers
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  13. 13
    Order for Notice and Hearing, Case No. PUR-2026-00056
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  14. 14
    Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
    Loudoun County Planning Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  15. 15
    Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
    Loudoun County
    Tier 1 · Captured 2026-11-09 · Open the source
  16. 16
    Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
    Virginia Commission on Local Government (Department of Housing and Community Development)
    Tier 1 · Captured 2026-11-09 · Open the source
  17. 17
    Board of Supervisors Business Meeting Minutes, March 18, 2025
    Loudoun County
    Tier 1 · Captured 2026-11-07 · Open the source
  18. 18
    QTS Ashburn Mega Data Center Achieves LEED Green Building Certification (445,000 sq ft, 32 MW), 2019-08-21
    QTS Realty Trust (PR Newswire release, republished by ThomasNet)
    Tier 4 · Captured 2026-11-08 · Open the source
  19. 19
    Stationary Source Permit to Construct and Operate, QTS Dulles, LLC (QTS Ashburn-Moran), Registration No. 73757, July 30, 2024 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  20. 20
    Stationary Source Permit to Construct and Operate, QTS Shellhorn, LLC (Ashburn-Shellhorn DC1 and DC2), Registration No. 74197, February 4, 2022 (minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  21. 21
    Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn II, LLC (ASH2 Lockridge), Registration No. 74232, August 5, 2024 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  22. 22
    Virginia data center locations (Ashburn-Moran, Ashburn 1, Ashburn 2, Ashburn 3, Manassas, Richmond)
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  23. 23
    Ashburn 2 data center campus (ASH2, Ashburn-Lockridge): 24-acre campus; DC1 44675 Quality Tech Lane, DC2 44655 Quality Tech Lane, Sterling, VA
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  24. 24
    Ashburn 3 data center campus (ASH3): 25-acre campus; DC1 22291 Shellhorn Road, DC2 22271 Shellhorn Road, Ashburn, VA
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  25. 25
    Ashburn-Moran data center: 3-acre site; 4 MW+ critical power capacity; LEED Silver Certified
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  26. 26
    QTS Announces Development of Mega Data Center Campus in Ashburn, Virginia (2017-10-24)
    QTS Realty Trust (PR Newswire release, republished by Telecom Ramblings newswire)
    Tier 4 · Captured 2026-11-09 · Open the source
  27. 27
    QTS Achieves Construction Milestones at its Ashburn, VA Mega Data Center (2017-12-19)
    QTS Realty Trust (PR Newswire release, republished by Telecom Ramblings newswire)
    Tier 4 · Captured 2026-11-09 · Open the source
  28. 28
    QTS Commitment to Communities page (economic impact: 40,000 U.S. jobs claim)
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  29. 29
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page