Every public record we have for QTS Ashburn mega data center

Sterling, Loudoun County, VirginiaOperatingFirst public 2017Filing entity: QTS Investment Properties Ashburn, LLCLast checked Nov 9, 2026

Download CSV

Records marked draft were traced to their source by an AI research agent and have not passed verification yet.

What the public record holds

5 of 24 records · showing power and utility only ·

2026

  • Utility proceedingPending before the commissionAug 25, 2026Virginia State Corporation Commission

    Supplemental proceeding for Dominion Energy Virginia proposed amendments to its line extension policy (direct connect transmission facilities for large load customers)

    New docket established by Commission order on August 25, 2026 to receive Dominion proposed amendments to its line extension policy, developed with Commission staff under the framework approved in PUR-2026-00056. The amendments are designed to ensure large load customers fund the costs of direct connect transmission facilities needed to serve new or expanding large loads, in situations where those facilities would not be built if not for the large load customer needs. The policy will apply prospectively. No amended policy text had been opened when this row was written, so the specific contribution in aid of construction terms, facility definitions, and any revenue credit are not stated here.

    PUR-2026-00131

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    SCC Fact Sheet, Rider T1 2026 Decision, post date September 3, 2026, Background and direct assignment sections (order establishing this docket entered August 25, 2026; case number PUR-2026-00131; direct connect, but for, and prospective terms)

  • Utility proceedingDecidedMay 1, 2026Virginia State Corporation Commission

    Application of Virginia Electric and Power Company for approval of a rate adjustment clause (Rider T1) pursuant to Section 56-585.1 A 4 of the Code of Virginia

    Transmission cost recovery case (Rider T1) in which the Commission also decided how transmission costs are allocated as large load grows. It approved two changes to Dominion transmission cost allocation method: a forecast adjustment that aligns allocation with rapidly expanding large load growth, and an adjustment incorporating the 85 percent transmission minimum demand charge for certain large load customers from January 1, 2027 (the GS-5 minimum decided in PUR-2025-00058). On the Commission illustration, the amended method cuts the projected Rider T1 increase for a typical residential customer using 1,000 kWh from $2.90 to $0.94 a month. The final order also approved a staff framework to require large load customers to fund direct connect transmission facilities needed for new or expanding large loads, through amendments to Dominion line extension policy in a new supplemental docket, PUR-2026-00131.

    PUR-2026-00056

    Draft research, not yet verifiedLast checked Nov 8, 2026
    Where it says this

    Order for Notice and Hearing, May 11, 2026 (application filed May 1, 2026 for Rider T1 under Section 56-585.1 A 4); SCC Fact Sheet, Rider T1 2026 Decision, post date September 3, 2026 (approved forecast adjustment and 85 percent transmission minimum demand adjustment; $2.90 to $0.94 illustration; direct assignment framework; new docket PUR-2026-00131)

  • Utility proceedingPending before the commissionFeb 2, 2026Virginia State Corporation Commission

    Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards

    A batch queue for Delivery Point Requests from distribution companies seeking to serve data centers in the Dominion Zone, about 100 MW or more per request and capped at 300 MW. Requests move through Initiation, Feasibility (zoning conformance letter and 30 percent engineering site plan), Development (permits and 100 percent grading plan), and Execution stages. The filing states about 70,000 MW of requests in the queue.

    PUR-2026-00011

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Application filed 2026-02-02 (Submission ID 36180), pages 1-2 (applicability to DP Requests of approximately 100 MW or more; PUR-2025-00058 Final Order at 22-23 directive)

2025

  • Utility proceedingDecidedMar 31, 2025Virginia State Corporation Commission

    Application of Virginia Electric and Power Company for a 2025 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services

    The Final Order created Schedule GS-5, a rate class for customers demanding 25 MW or more with a load factor of at least 75 percent, effective January 1, 2027. Large customers pay minimum demand charges of 85 percent of contracted distribution demand, 85 percent of contracted transmission demand, and 60 percent of contracted generation demand. The filed GS-3 and GS-4 tariff pages confirm the same minimums reach 25 MW customers on other schedules through Terms and Conditions Section XXVII from January 1, 2027.

    PUR-2025-00058

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    SCC news release, case summary paragraph (GS-5, 25 MW, 85/85/60 minimums, January 1, 2027); Entire Filed Tariff revised 2026-06-01, GS-4 paragraphs I.F, II.B and VIII and GS-3 paragraphs I.G and II.B (high load minimums from 2027-01-01)

2023

  • Utility proceedingDecidedJul 3, 2023Virginia State Corporation Commission

    Application of Virginia Electric and Power Company for a 2023 biennial review of the rates, terms and conditions for the provision of generation, distribution and transmission services

    This review approved the Contract Dollar Minimum policy now in Terms and Conditions Section XXII.Q: when net distribution investment for new service exceeds $350,000, Dominion may require a written revenue guarantee with a monthly minimum of 50 percent of the customer's lowest anticipated monthly bill, secured by cash deposit, surety bond, or irrevocable letter of credit. The minimum ends when the term expires or revenues collected exceed the net investment.

    PUR-2023-00101

    Draft research, not yet verifiedLast checked Nov 7, 2026
    Where it says this

    Entire Filed Tariff revised 2026-06-01, Terms and Conditions Section XXII.Q (effective 2026-01-01)

Records we are still collecting

These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.

  • Building and site permits

    Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.

  • Water supply and use

    Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.

  • Tax breaks and payments

    Abatements, enterprise zones, payments in lieu of taxes, fees. Usually held by: County, city, or development authority.

  • Courts and disputes

    Lawsuits, appeals, settlements. Usually held by: State and federal courts.

  • Company filings

    Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.

Sources

  1. 1
    Stormwater Permits (Daily), EDMA MapServer layer 303
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  2. 2
    Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn, LLC (Ashburn 1: DC1 and DC2), Registration No. 74141, June 10, 2025 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  3. 3
    EDMA Active Air Sites layer (MapServer layer 294), facility records for all QTS registrations in Virginia (51232, 53259, 73757, 74141, 74161, 74197, 74232)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  4. 4
    Existing Data Center Parcels (county GIS layer), records for MCPI 044261032000 (Pacific Boulevard, Sterling) and MCPI 234371847000 (Compass Creek, Leesburg)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-09 · Open the source
  5. 5
    Ashburn 1 data center campus (ASH1): 28-acre campus; DC1 22271 Broderick Drive, DC2 22280 Randolph Drive, Sterling, VA
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  6. 6
    Loudoun County Board of Equalization 2025 Annual Report
    Loudoun County Board of Equalization
    Tier 1 · Captured 2026-11-09 · Open the source
  7. 7
    Loudoun County Zoning Ordinance (official text, eReader)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  8. 8
    Land Use Considerations (county data center page)
    Loudoun County, Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  9. 9
    Virginia Electric and Power Company Entire Filed Tariff (revised June 1, 2026)
    Dominion Energy Virginia
    Tier 1 · Captured 2026-11-07 · Open the source
  10. 10
    SCC Issues Order on DEV Biennial Review 2025
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-07 · Open the source
  11. 11
    Application of Virginia Electric and Power Company for approval of its large-load connection queue process standards, Case No. PUR-2026-00011
    Virginia Electric and Power Company
    Tier 1 · Captured 2026-11-07 · Open the source
  12. 12
    How the SCC Rider T1 Decision Protects Ratepayers
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  13. 13
    Order for Notice and Hearing, Case No. PUR-2026-00056
    Virginia State Corporation Commission
    Tier 1 · Captured 2026-11-08 · Open the source
  14. 14
    Minutes, Loudoun County Planning Commission Work Session, December 10, 2020
    Loudoun County Planning Commission
    Tier 1 · Captured 2026-11-09 · Open the source
  15. 15
    Action Report of the April 13, 2022, Board of Supervisors Public Hearing (County Administrator memorandum, April 15, 2022)
    Loudoun County
    Tier 1 · Captured 2026-11-09 · Open the source
  16. 16
    Report on the Town of Leesburg - Loudoun County Voluntary Settlement Agreement
    Virginia Commission on Local Government (Department of Housing and Community Development)
    Tier 1 · Captured 2026-11-09 · Open the source
  17. 17
    Board of Supervisors Business Meeting Minutes, March 18, 2025
    Loudoun County
    Tier 1 · Captured 2026-11-07 · Open the source
  18. 18
    QTS Ashburn Mega Data Center Achieves LEED Green Building Certification (445,000 sq ft, 32 MW), 2019-08-21
    QTS Realty Trust (PR Newswire release, republished by ThomasNet)
    Tier 4 · Captured 2026-11-08 · Open the source
  19. 19
    Stationary Source Permit to Construct and Operate, QTS Dulles, LLC (QTS Ashburn-Moran), Registration No. 73757, July 30, 2024 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  20. 20
    Stationary Source Permit to Construct and Operate, QTS Shellhorn, LLC (Ashburn-Shellhorn DC1 and DC2), Registration No. 74197, February 4, 2022 (minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  21. 21
    Stationary Source Permit to Construct and Operate, QTS Investment Properties Ashburn II, LLC (ASH2 Lockridge), Registration No. 74232, August 5, 2024 (combined minor New Source Review permit, with transmittal letter)
    Virginia Department of Environmental Quality
    Tier 1 · Captured 2026-11-09 · Open the source
  22. 22
    Virginia data center locations (Ashburn-Moran, Ashburn 1, Ashburn 2, Ashburn 3, Manassas, Richmond)
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  23. 23
    Ashburn 2 data center campus (ASH2, Ashburn-Lockridge): 24-acre campus; DC1 44675 Quality Tech Lane, DC2 44655 Quality Tech Lane, Sterling, VA
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  24. 24
    Ashburn 3 data center campus (ASH3): 25-acre campus; DC1 22291 Shellhorn Road, DC2 22271 Shellhorn Road, Ashburn, VA
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  25. 25
    Ashburn-Moran data center: 3-acre site; 4 MW+ critical power capacity; LEED Silver Certified
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  26. 26
    QTS Announces Development of Mega Data Center Campus in Ashburn, Virginia (2017-10-24)
    QTS Realty Trust (PR Newswire release, republished by Telecom Ramblings newswire)
    Tier 4 · Captured 2026-11-09 · Open the source
  27. 27
    QTS Achieves Construction Milestones at its Ashburn, VA Mega Data Center (2017-12-19)
    QTS Realty Trust (PR Newswire release, republished by Telecom Ramblings newswire)
    Tier 4 · Captured 2026-11-09 · Open the source
  28. 28
    QTS Commitment to Communities page (economic impact: 40,000 U.S. jobs claim)
    QTS Realty Trust, LLC
    Tier 4 · Captured 2026-11-09 · Open the source
  29. 29
    U.S. Census Geocoder (batch geographies endpoint)
    U.S. Census Bureau
    Tier 1 · Captured 2026-11-11 · Open the source

No corrections have been published for this page. Corrections log · Report an error or send a tip on this page