Data Center Fact Check tracks 10 data center projects in Manassas, Virginia as of November 2026: 6 stage not known, 3 operating and 1 under construction, totaling about 36 MW announced where a figure is published.
Manassas has 10 tracked data centers. Their announced capacity totals about 36 MW where a figure is published. Of those, 3 operating and 1 under construction; the stage of the other 6 is not known yet. Every figure comes from the public record linked on this page.
Data center projects in Manassas
- Amazon Data Services Inc IAD-205/307/317/612/612x
Stage not knownManassas
- Cashvad Ventures LLC
Stage not knownManassas
- CloudHQ Manassas campus
OperatingManassas
- Comcast Cablevision of Virginia Incorporated
Stage not knownManassas
- Corporate Office Properties Trust (COPT - DC6)
Stage not knownManassas
- Equinix DC14 (Washington, DC metro)
OperatingManassas
- Microsoft Manassas campus
Under constructionManassas
- Oath Inc.
Stage not knownManassas
- SI NVA05A LLC and SI NVA05D LLC
Stage not knownManassas
- STACK Infrastructure NVA05A (Northern Virginia)
OperatingManassas36 MW announced
Who serves this place
- Not collected yet.
Court cases and commission dockets in Virginia (15)
Bills and laws in Virginia
- HB 2578 · Died or failedAdds clean energy conditions to the data center tax break
- HB 2027 · Died or failedRequires a state certificate to operate large power users
- SB 843 · Filed · Oct 9, 2026Bars new data center approvals statewide for three years
- EO 22 · In effect · Sep 18, 2026Sets Virginia data center standards and bans secret project agreements
- HB 30 · In effect · Jul 1, 2026Budget act item taxing data center electricity at 1.1 cents per kWh
- HB 1393 · Signed into law · May 14, 2026Shifts grid costs to the largest electricity customers
- HB 153 · Signed into law · Apr 13, 2026Requires site assessments before local approval of large data centers
- HB 323 · Signed into law · Apr 13, 2026Directs a state study of data center waste heat
Latest from the newswire
What the record shows · November 28, 2026
What the record shows · November 22, 2026
SpaceX's SEC filing counts 220,000 processors at xAI Colossus 2, switched on in 91 days and 64 days
What the record shows · November 22, 2026
PPL's data center pipeline reached 31.8 gigawatts. Signed contracts cover over 11.
Questions people ask
- How many data centers are in Manassas?
- Data Center Fact Check tracks 10 data center projects in Manassas as of November 2026. Of those, 3 operating and 1 under construction; the stage of the other 6 is not known yet.
- What is the biggest data center in Manassas?
- By announced capacity, the biggest data center in Manassas is STACK Infrastructure NVA05A (Northern Virginia), announced at 36 MW. It is operating.
- How much power do data centers in Manassas use?
- The 10 projects tracked in Manassas have announced about 36 MW of capacity in total, where a figure is published. That is announced capacity, not measured electricity use.
Sources
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Manassas." Accessed 2026-11-29. https://datacenterfactcheck.org/places/us-va-manassas-city
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page